Dave wall feb 2017 presentation2 Jun 2018 09:35
Then, obviously, when you look at the frack design, one of the things that we had been looking at was a multi-stage frack because what we're trying to figure out is what the most productive part of this interval will be for locating future horizontal wells.
There's also another objective, which is to prove the producibility and also to maximize the flow rate from this well because if you don't maximize the flow rate, and we get 50 or 60 barrels and only one stage is working, but we understand that that's very significant because we can go and drill horizontal, the market is not going to give us the love that we need to take the project forward. We change the priority to be equal flowability and locating the right zones to be primarily maximizing the flow rate, because that will be the thing that helps us move the project forward in the most meaningful way for everyone in this room.
Then, second, but only about a small amount is determining where to put horizontal wells in the future basins. What we're doing is we've changed the
logging program to help us with that second part, so run information, the image logs and a more sophisticated logging suite which will be run before and after we do the fracture stimulation, and putting traces in the fracture stimulation so that we can understand better where the productivity is coming from. We will be able to answer that question as well.