RE: Previous post18 Jan 2023 21:22
@YugoBoss - 1588 x 2204 (lbs in a tonne) = 3,499,952 lbs. Cu average price during 4Q 2022 was approx. $3.6 (using data from IFCM website). $3.6 x 3, 499,952 = $12,599,827. Let's not forget the gold too with 401 ozs at approx. $1750/oz during 4Q 2022 giving $701,750. So about $13,301,577 or $4,433,859 per month.
The issue, I believe, is with the debt situation and having enough left over to service that debt. We know that they do not have enough left over to cover debts with the current financial package. If they could cut costs further, say another $1M per month, and start processing from the high grade areas (3.6% and above to double the 1588 tonnes) they might succeed. Head grade for that quarter was 1.84% Cu, they have reported drill results in areas with much greater grades (e.g. 13m at 5%, incl. 4.6m at 11.4% in the UFZ). GLA, Dan