Very positive RNS - They believe it time to start talking full field development.18 Aug 2022 09:37
They believe they have done it YAY....
"Testing of the C-77H well immediately after the re-frac operation demonstrated gas production rates up to 0.5 mmscfd from the 2 newly fracced zones. "
"The flowing tubing head (FTHP) pressure varies between c. 880 psi and 350 psi depending on the level of fluid loading in the 4.5" liner with rapid pressure build up after short shut-in periods indicating the efficacy of the re-frac operation."
The rest of the well and 73 is blocked off so all the extra that Gordon was suggesting adding to it was not.
"The previous 4 fracced zones in the lower section of the wellbore are currently isolated with a bridge plug to allow for accurate assessment of the re-frac program.
The C-73 wellbore is being kept offline while production testing of the C-77H continues but will be co-mingled with C-77H in the future. Finally, the 4 fracced zones that were on production prior to being isolated for the re-frac operation, may be co-mingled by milling the isolating bridge plug in the future."
Moving on to farm out.....
"Based on the belief that the Company has established a fraccing methodology suitable for a full-field development, the Company plans to initiate a formal farm out process for up to 50% of the c.1 TCF Cambay gas and condensate field."
Absolutely no reason for this wobble so I just added 10m shares.