RE: Selling27 Aug 2020 11:02
CB has mentioned in two podcasts that the new contractors are already on site and have started mining to build up a stockpile in preparation for start of production in two months time.
The existing alluvials expected to last until next March and new alluvials will be a stop gap measure with up to 12 months expected LOM.
With existing alluvials, Guy Fawkes, Boa Esperanza, New alluvials and, possibly, Kalengwa, all producing at the same time, iI would be very surprised if a fund raising will be needed any time soon - providing, of course, we have enough CIB to last the next 2-3 months.