RE: Recent Production30 Apr 2025 13:14
WG,
You can ask for my take on things ALL you want, but it is NO different than already noted.
Liquids in the wellbore and the near wellbore reservoir ARE the Bain of secondary and tertiary , always has been and always will be.
The Booster is not some miracle component, it is simply an "aid" in reservoir recovery efforts, it could easily be that they are performing some shut-in & build up routines to allow the liquids to build prior to trying to flush them out to surface.
It could also be that the booster is not delivering as hoped, meaning even with it running, it is still insufficient to assist the flow velocity and bring up those pesky liquids.
It may be that they have had to make some reconfiguration of the booter and downstream to improve the way it performs.
You are asking me, but I am not there, and I can only offer my best thoughts on what they "may" be doing.
Even if it transpires the booster is not improving the situation enough, then they may well need to move to plan C and look to install velocity strings to work in conjunction with the booster and plant.
I MAINTAIN, it is too early to start making your type of a55vmtions in your pathetic attempt to simply unnerve people, let them get on with their work, and wait for them to deliver their evaluation ONCE they have gotten to that point.