RE: 2nd hole8 Jul 2021 11:41
Abundant caution is definitely the right approach on first drill, understanding more about the geology at every level, especially on a potential gold strike, careful preparation and casing, calibrating the machinery and sensor gear, double checking. The stakes are high so messing up the hole before appraisal and getting maximum analytical value from the wire log. It all helps to derisk the next planned drills. 'About a month' for each drill doesn't mean the first drill will be finished in the first month. I'm really happy with DM's approach to DD all the way through so far.