RE: Actually some good solid news :)10 Mar 2022 19:24
"Have to build 2 more ware houses for those transformers right ?"
I think you mean three more sheds, making four in total, if you wanted to build out to max 800MW on past current assumptions (although overclocking, Intel accelerators, and bespoke-assembly may radically change our assumptions about number of machines and racks needed per hash).Having all the electrical infrastructure in place is a bold front cost but it knocks millions and months off the cost/time of future expansions, and de-risks potential build, so that the amount of any future raise would be correspondingly smaller if that option was needed say in a year's time. Bird in the hand, makes good sense.