RE: How may ounces getting added in March?5 Mar 2026 13:36
Hi Hopefully
They were drilling in the base of the pit of stage 2 a lot of that ore has gone to the plant.
Earlier drilling on stage 2 and 7 was infill drilling to gain a greater confidence in the resource grades, they were drilling closer spacings.
They moved to the stage 7 extension drilling for the MRE.
From there they went to the western side of the southern extension, as I said this was used in the cherry picking.
Over 100,000m in H2 26 till June they must be nearly halfway through it already. The 240,000m in total will take sometime to model.