RE: MRE211 Feb 2022 09:01
The MRE2 is a complex calculation of volumes.
You have to back to the MMRE and look at the plans showing the cubes or shells, this is where the Inferred resource came from.
In the PFS they only picked out the high grade sulphides to be upgraded from inferred to indicated, the surrounding breccia were omitted due to it not being drilled enough.
The information for both are way out of date, the passed 12 months they’ve been infill drilling, the breccia volumes surrounding the sulphides has diminished considerably as the sulphides have grown in size and grades. It’s these that will be changed to indicated.
They’ve been infilling the remaining breccia surrounding the sulphides and also the breccia in the northern corridor which were in the MMRE.
It’s hard to pick out how much of the breccia will be changed to indicated and how many further breccia will be included in the inferred.
Anything below 650m is likely to be inferred but there is a possibility of a portion of the SE deeps may be drilled enough to be indicated.
18 months ago I worked out that there would be 2.5m oz in the sulphides and 5-7m oz in the breccia down to the 650m level , so if this MRE2 gets to 10m oz combined inferred and indicated I will be way pleased but not disappointed if it doesn’t , it’s in a progression that will continue to grow for years.