RE: Results27 Apr 2022 11:30
It will be interesting to find out what the 3 step out drills were targeting
HAD 153 and 155 were not very deep drills 800m and 600m roughly, 153 was shown drawn twice as long as the log length so was that testing the ground? 155 looks as though it just punched through the cover testing the Dyke position.
154 across the south side of the ore body was also drawn twice as long as the log length so again testing ground conditions maybe but was slightly deeper around 1,000m vertical depth.
152 is a very long assay pending drill over 2,000m in length targeting the Eastern Breccia from the southwest through the central northern corridor high grade pods. It passes through a high grade pod in the EB and carries on out.
Had93a follows a similar path to 152 but is about 500m shorter but targeting the same pods as 152 and finishes in the high grade EB pod
The end of Had145a is also in assay called 145aW1 this targeting the Eastern breccia
145a finished just outside the sulphide ring, whereas 145aW1 carries on for 350m from the ring in the EB
Shaun said in London they were bringing back rigs after the wet season, so the drill count is back up to 8-9 rigs