RE: Phase 27 Oct 2021 13:34
ART I think we need to see the full assays relevant statements for continued drilling were in RNS of 2 Aug:
EXTRACT FROM RNS BELOW:
Colin Bird, Executive Chairman said: "Hole BRDD-21-007 was extended beyond the planned depth as the mineralisation in this hole was more persistent than anticipated. The next two holes in the current drilling phase have already commenced, with BRDD-21-010 progressing beyond 200m, and sparse copper mineralisation already evident. We are very pleased with progress to date."
Phase 2 Drilling Progress to Date
Drilling continues to progress rapidly at Racecourse from two drill pads utilising one diamond drill rig at each pad. Hole BRDD-21-008 was completed and reported previously (on 29 July 2021), while the second hole, BRDD-21-007, has now also been completed. Drilling on the third hole, BRDD-21-010, at the first drill pad is at 202m depth and continuing, while the fourth hole (BRDD-21-009) has just commenced.
BRDD-21-007 was drilled at an angle of -55 degrees towards the northeast. Multiple porphyry units were intersected and disseminated chalcopyrite copper mineralisation was persistent throughout the hole from 46m depth. Stronger vein/disseminated mineralisation was developed over a 173m interval between 239m-412m depth in the core of the system. Detailed logging and core cutting are in progress to prepare samples for laboratory analysis.