RE: mandrill20 Aug 2018 21:09
SG2,
"AM tied-up, still.........what were the allusions (yesterday, I think) to concerning 'structural additional work' ? I guess most of us were expecting the auld tub to be away by now"
The structural work thing was to my mind a complete red herring planted by a consistent (possibly professional) 'deramper', so should be ignored in my opinion.
However, I don't want to appear as some sort of 'ramper' wearing rose-tinted spectacles and suggesting everyone else wears similar lenses.
We know the lifeboats were test- launched port side quite a few days ago. Fine. That's easy. Push the trigger, the boat goes down the ramp and into the water. But what if one of the boats was damaged during the test? (Unlikely, those things aren't built by Renault.) Or what if the launch-ramp wouldn't accept it being fitted back in? (Equally unlikely in my opinion.)
The thing being, WE SIMPLY DON'T KNOW the details of what's happening at DDW.
There's only one thing which we know for absolutely 100% certain. That being the company has set the 'window' for FPSO 'sailaway' for Q3, and it's five weeks until Q3 ends. So there is nothing which can be classified as a 'delay'.
If the boat hasn't sailed from Dubai by the end of August, a lot of people will want to know why, and with very good and justifiable reason. Until then, though, there's no reason to worry. At least not that I can see, personally.