RE: MATD, Gazelle-1, Heron-2, Farm-out Game on11 Oct 2025 09:52
9th Oct RNS: Gazelle results (well unstimulated).
Choke 1/8β As per RNS 160 bopd.
Choke 3/16ββ As per RNS 300 bopd.
Choke ΒΌβ As per RNS 460 bopd.
Also note worthy is the fact Gazelle is producing with gas pressure, no beam pump needed.
Gazelle is being completed and put into production.
Worth remembering this is a different reservoir to the Heron wells, and an up dip 45 m sands already identified for a side track drill, beauty is Gazelle is shallower than Heron wells, the up dip is estimated to have 5 million barrels of oil, at 500 bopd that will last almost 27 years.
β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦
H1 continues to pump at a stabilised 150 to 160 bopd.
Above bopd is in line with Petro China better producing wells adjacent (few km) in the TAMSAG basin.
β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦β¦
H2, beam pump installed and started pumping 640 barrels of injected fluids out of the well on 6th October, these injected fluids should take a maximum of 6 days to remove so today / tomorrow we should be pumping oil out, I would expect the H2 result this coming week, initially I had expected circa 85 bopd maximum from H2 but now not so sure, MB elected to run the production tubing and surface wellhead equipment so I am hopeful of a better than expected result from H2.