Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropean Metals Holdings Share News (EMH)

Share Price Information for European Metals Holdings (EMH)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 20.50
Bid: 20.00
Ask: 21.00
Change: -1.00 (-4.65%)
Spread: 1.00 (5.00%)
Open: 21.50
High: 21.50
Low: 20.50
Prev. Close: 21.50
EMH Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

AIM WINNERS & LOSERS: Premier African Minerals slides on project delay

Thu, 25th May 2023 11:22

(Alliance News) - The following stocks are the leading risers and fallers on AIM in London on Thursday.

----------

AIM - WINNERS

----------

European Metals Holdings Ltd, up 7.3% at 33.80 pence, 12-month range 29.50p-59.00p. The mineral exploration and development company says testwork confirms separation efficiency and capability of flotation of lithium-bearing zinnwaldite from Cinovec in Czechia. It notes that the updated flotation testwork recently undertaken at Nagrom Laboratories, Perth, has repeatedly reached over 95% lithium recovery from flotation concentrates at target Li-grades and mass yield. "The exceptional lithium extraction results are outstanding and further underline the commercial viability of operations at Cinovec," says Chair Keith Coughlan. "We expect the current testwork to be completed by the end of June and will publish the full results." Cadence Minerals, which has a 6.8% stake in European Metals, was down 1.6%.

----------

AIM - LOSERS

----------

Premier African Minerals PLC, down 29% at 0.55p, 12-month range 0.26p-1.04p. The Africa-focused minerals and metals project developer says its process plant at Zulu lithium and tantalum project is now fully commissioned. The supplier has advised Premier African that the milling and sizing component of the plant requires certain limited modifications to allow for full optimisation to design capacity throughput. It now expects the first spodumene shipments in June, and final optimisation in the fourth quarter of 2023 following plant modifications.

----------

RA International Group PLC, down 23% at 12.10p, 12-month range 11.05p-25.00p. The London-based remote site services provider in Africa and the Middle East says pretax loss narrowed to USD13.2 million in 2022 from USD32.2 million in 2021. Revenue rises 15% to USD62.9 million from USD56.4 million the prior year. However, the company's underlying earnings before interest, tax, depreciation, and amortisation falls by 91% to USD600,000 to USD6.7 million. The underlying Ebitda margin narrowed markedly to 1.0% from 12.3%. The company says this was a reflection of "inflationary pressure impacting the business since the second half of 2021". The margin pressure will abate over time, RA says, "with newly awarded contracts generating improved margins".

----------

By Sophie Rose, Alliance News reporter

Comments and questions to newsroom@alliancenews.com

Copyright 2023 Alliance News Ltd. All Rights Reserved.

More News
7 May 2024 20:22

TRADING UPDATES: Abingdon Health buys IVDeology Holdings

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Tuesday and not separately reported by Alliance News:

Read more
25 Apr 2024 20:57

TRADING UPDATES: Norcros sells Johnson Tiles UK; Trifast trading well

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Thursday and not separately reported by Alliance News:

Read more
11 Apr 2024 16:02

European Metals reports success in Cinovec pilot lithium programme

(Sharecast News) - European Metals announced a significant milestone on Thursday, with the successful production of lithium hydroxide monohydrate from pregnant leach solution generated during the recent larger-scale Cinovec pilot programme.

Read more
11 Apr 2024 10:53

UPDATE: European Metals produces lithium hydroxide monohydrate

European Metals Holdings Ltd - Czech Republic-focused mineral exploration and development - Produces lithium hydroxide monohydrate from pregnant leach solution, which was manufactured during the recent larger-scale Cinovec pilot programme. Says the pilot programme confirms the viability of the lithium chemical plant process flow sheet for the industrial-scale production of lithium carbonate and lithium hydroxide. Chair Keith Coughlan says: "We are extremely pleased with the results from the lithium hydroxide test program. The lithium hydroxide produced was of the highest grade possible and exceptionally clean. This, when combined with the ability to produce either battery-grade lithium carbonate or hydroxide, enables a wider range of off-takers for the Cinovec product." Cadence Minerals PLC, an investment and development company focused on energy transition minerals which owns a 3.2% stake in European Metals, positively notes the firm's update.

Read more
11 Apr 2024 09:51

IN BRIEF: European Metals produces lithium hydroxide monohydrate

European Metals Holdings Ltd - Czech Republic-focused mineral exploration and development - Produces lithium hydroxide monohydrate from pregnant leach solution, which was manufactured during the recent larger-scale Cinovec pilot programme. Says the pilot programme confirms the viability of the lithium chemical plant process flow sheet for the industrial-scale production of lithium carbonate and lithium hydroxide. Chair Keith Coughlan says: "We are extremely pleased with the results from the lithium hydroxide test program. The lithium hydroxide produced was of the highest grade possible and exceptionally clean. This, when combined with the ability to produce either battery-grade lithium carbonate or hydroxide, enables a wider range of off-takers for the Cinovec product."

Read more
27 Mar 2024 12:50

European Metals confident in timeline of Cinovec feasibility study

(Sharecast News) - European Metals Holdings updated the market on progress at the Cinovec Project in the Czech Republic on Wednesday, owned by its 49% subsidiary Geomet, focusing on the ongoing definitive feasibility study.

Read more
27 Mar 2024 12:20

Cadence Minerals expects review at lithium project to improve outcome

(Alliance News) - Cadence Minerals PLC announced on Wednesday that a review is underway at the Cinovec lithium project in the Czech Republic.

Read more
31 Jan 2024 14:29

EARNINGS AND TRADING: Hydrogen Future loss widens; Quantum revenue up

(Alliance News) - The following is a round-up of earnings and trading updates by London-listed companies, issued on Wednesday and not separately reported by Alliance News:

Read more
29 Jan 2024 15:18

European Metals extends all four Cinovec licences

(Sharecast News) - European Metals Holdings announced the extension of all four Cinovec exploration licences on Monday, until 31 December 2026.

Read more
29 Jan 2024 14:06

European Metals extends exploration licences for Cinovec project

(Alliance News) - European Metals Holdings Ltd on Monday said it had granted an extension to all four Cinovec exploration licences.

Read more
22 Dec 2023 11:44

IN BRIEF: European Metals shares fall 20% as Cinovec work delayed

European Metals Holdings Ltd - Czechia-focused mineral exploration and development company - Says delivery of definitive feasibility study for the Cinovec lithium project in the Czech Republic is now scheduled for the first quarter of 2024. Says approval granted for timetable extension so Geomet and project study team, DRA Global and Bara Consulting, can complete capital and operating cost estimation, and project implementation scheduling. Says process of obtaining sufficient and diverse proposals, from "numerous" external suppliers and contractors, will take longer than originally planned. Company "believes it is prudent to allow the necessary time to complete the study to the highest standard". Says it does not expect extension to impact the overall project timeline, and that permitting is "already well underway". Cadence Minerals PLC, which holds approximately 5.3% of the equity in European Metals, is "pleased to note" the announcement.

Read more
15 Dec 2023 15:58

UK shareholder meetings calendar - next 7 days

Monday 18 December 
Ascential PLCGM re proposed sale of digital commerce business
Braemar PLCAGM
Eqtec PLCEGM re capital reorganisation
Fandango HoldingsAGM
Grit Real Estate Income Group LtdAGM
LondonMetric Property PLCGM re revised directors' remuneration policy
Nightcap PLCAGM
Surface Transforms PLCGM re fundraising
TechFinancials IncAGM
Tuesday 19 December 
dotdigital Group PLCAGM
easyJet PLCGM re buy of 157 A320neo family aircraft
Microsaic Systems PLCGM re fundraising
Netcall PLCAGM
Orosur Mining IncAGM
Technology Minerals PLCAGM
Zanaga Iron Ore Co LtdAGM
Wednesday 20 December 
AVI Global Trust PLCAGM
Lift Global Ventures PLCAGM
Northamber PLCAGM
RM Infrastructure Income PLCGM re managed wind-down
SolGold PLCAGM
Thursday 21 December 
Beacon Energy PLCAGM
Beeks Financial Cloud Group PLCAGM
Coinsilium Group LtdAGM
Conroy Gold & Natural Resources PLCAGM
Gfinity PLCAGM
Helium Ventures PLCAGM
Karelian Diamond Resources PLCAGM
Kin & Carta PLCCourt and GM re takeover by Apax Partners LLP 
Macau Property Opportunities Fund LtdAGM
Pathfinder Minerals PLCGM re proposed GBP1.3 million fundraise
ScS Group PLCGM re takeover by Cerezzola
VietNam Holding LtdAGM
VietNam Holding LtdEGM re introducing redemption facility
Friday 22 December 
Corcel PLCAGM
European Metals Holdings LtdAGM
Tlou Energy LtdGM re approval to issue convertible loan to ILC Investments Pty Ltd
Wildcat Petroleum PLCAGM
  
Copyright 2023 Alliance News Ltd. All Rights Reserved. 

Read more
9 Nov 2023 12:54

EARNINGS AND TRADING: Wincanton profit down; James Cropper ups payout

(Alliance News) - The following is a round-up of earnings and trading updates by London-listed companies, issued on Thursday and not separately reported by Alliance News:

Read more
31 Oct 2023 14:23

TRADING UPDATES: Amaroq wins two new exploration licences in Greenland

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Tuesday and not separately reported by Alliance News:

Read more
2 Oct 2023 21:51

IN BRIEF: European Metals reports narrowed annual loss

European Metals Holdings Ltd - Czechia-focused mineral exploration and development company - On Friday, reports a pretax loss of USD5.9 million in the year ended June 30, narrowed from a loss of USD6.8 million the year prior. Loss narrows as company records finance income of USD479,783 in the year, up from USD44,783 the previous year and its share based payments reduce to USD1.9 million from USD2.9 million. Also swings to a foreign exchange gain of USD145,858 from a loss of USD16,544 the year prior.

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.