Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZephyr Energy Regulatory News (ZPHR)

Share Price Information for Zephyr Energy (ZPHR)

Share Price is delayed by 15 minutes
Get Live Data
3.00    -0.10 (-3.23%)
Bid:
2.90
Ask:
3.10
Spread: 0.20 (6.897%)
Market Cap: £63.02m
ZPHR Live PriceLast checked at - London Stock Exchange

Intraday Zephyr Energy Share Chart

Successful initial results from production test

7 May 2025 07:00

RNS Number : 5882H
Zephyr Energy PLC
07 May 2025
 

 

 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the UK Market Abuse Regulation. With the publication of this announcement, this information is now considered to be in the public domain.

 

7 May 2025

Zephyr Energy plc

("Zephyr" or the "Company")

 

Successful initial results from State 36-2R well production test

 

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF) is pleased to provide initial results from the production test on the State 36-2 LNW-CC-R well (the "well") at the Company's flagship project in the Paradox Basin, Utah, U.S. (the "Paradox project").  

 

During the production test, the well was tested at multiple flow rates in order to gather data to determine the flow capacity of the well, to provide an early estimate of potential resource volumes, and to obtain high quality fluid samples. We are pleased to report that the production test successfully delivered on all these key objectives, and, most importantly, the test data gathered suggests that there is more than sufficient deliverability for a commercial well.

 

 

 

Initial production test observations include:

· A peak rate of 2,848 barrels of oil equivalent per day ("boepd") (11.9 million standard cubic feet per day ("mmscf/d") and 856 barrels of oil per day ("bopd")) on a 18/64-inch choke setting, which was achieved with no material drop in bottom hole pressure.

 

· During a separate, planned 48-hour period of stable flow, the well delivered steady production rates averaging 3-4 mmscf/d and 200-400 bopd (700-1,066 boepd total), at a choke setting of 8/64-inch, with no material drop in bottom hole pressure.

 

· Well test data and interpretation suggest that there is more than sufficient well deliverability for a commercial well.

 

· Data gathered from a fibre optic cable run along the length of lateral suggests that inflow of hydrocarbons across the length of the lateral is occurring, indicating the potential for a much larger reservoir volume to be drained compared with the initial completed interval of 130 feet in the previous production test (as announced on 6 September 2024).

 

· Elevated condensate-yields were observed (in a range of 60-200 barrels of oil ("bo") per million standard cubic feet ("mmscf") with an 85 bo/mmscf average). While liquid yields will vary across the field area and in time as the reservoir pressure drops during field production, the overall elevated liquid yields are expected to be a significant driver of enhanced project economics.

 

· Water cut was less than 0.5% throughout the duration of the test. This continued evidence of limited water production is another potential boost to the well's economics by reducing the need for expensive water disposal processes.

 

· Produced gas and condensate fluid samples have been collected and a detailed fluid laboratory analysis is currently underway to further characterise the field's fluid fill and composition. 

 

The well test results suggest that the chosen completion strategy (hydra-jet abrasive perforation and matrix acidisation) was highly successful, and the test data results fit well with the Company's P50 estimate of reservoir properties. It should be noted that no fracture stimulation was performed to achieve this excellent well deliverability result. Fracture stimulation could offer further upside potential for both the well, and for the broader Paradox project development.

 

Further results from the production test, including estimated ultimate recoveries, will be announced when available.

 

 

Colin Harrington, Zephyr's Chief Executive, said:

 

"I could not be more pleased with the initial results from this latest production test. Our team has worked exceptionally hard to crack the code to deliver highly economic production from this under-explored basin, and with today's news I believe we have made huge strides forward.

 

While the early results on this single well are fantastic and demonstrate commerciality, I am even more encouraged when considering the potential implications for the broader development of our Paradox project."

 

 

 

Contacts

Zephyr Energy plc

Colin Harrington (CEO)

Chris Eadie (Group Finance Director and Company Secretary)

 

 Tel: +44 (0)20 7225 4590

Allenby Capital Limited - AIM Nominated Adviser

Jeremy Porter / Vivek Bhardwaj

 

 Tel: +44 (0)20 3328 5656

 

Turner Pope Investments - Joint-Broker

James Pope / Andy Thacker 

 

Canaccord Genuity Limited - Joint-Broker

Henry Fitzgerald-O'Connor / Charlie Hammond

 

Celicourt Communications - PR

Mark Antelme / Felicity Winkles / Ali AlQahtani

 Tel: +44 (0)20 3657 0050

 

 

Tel: +44 (0)20 7523 8000

 

 

 

Tel: +44 (0) 20 7770 6424

 

 

Qualified Person

 

Dr Gregor Maxwell, BSc Hons. Geology and Petroleum Geology, PhD, Technical Adviser to the Board of Zephyr Energy plc, who meets the criteria of a qualified person under the AIM Note for Mining and Oil & Gas Companies - June 2009, has reviewed and approved the technical information contained within this announcement.

 

Notes to Editors

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF) is a technology-led oil and gas company focused on responsible resource development from carbon-neutral operations in the Rocky Mountain region of the United States. The Company's mission is rooted in two core values: to be responsible stewards of its investors' capital, and to be responsible stewards of the environment in which it works.

Zephyr's flagship asset is an operated 46,000-acre leaseholding located in the Paradox Basin, Utah, 25,000 acres of which has been assessed to hold, net to Zephyr, 2P reserves of 2.6 million barrels of oil equivalent ("mmboe"), 2C resources of 34 mmboe and 2U resources 270 mmboe.

 

In addition to its operated assets, the Company owns working interests in a broad portfolio of non-operated producing wells across the Williston Basin in North Dakota and Montana. Cash flow from the Williston production will be used to fund the planned Paradox Basin development. In addition, the Board will consider further opportunistic value-accretive acquisitions. 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFFFIVEVIRIIE
Date   Source Headline
9th Jun 20267:00 amRNSParadox project update
21st May 20267:00 amRNSFurther divestment of undeveloped acreage
9th Apr 20267:00 amRNSCybersecurity incident
24th Mar 20267:00 amRNSOperations Update
19th Feb 202611:00 amRNSHolding(s) in Company
20th Jan 20267:00 amRNSDirector/PDMR Shareholding
30th Dec 20257:01 amRNSYear-end update
30th Dec 20257:01 amRNSYear-end update
20th Nov 20257:00 amRNSParadox project & Financing Update
9th Oct 20257:00 amRNSInitial investments under US$100m partnership
6th Oct 20257:00 amRNSParadox project Reserves & Resource Evaluation
30th Sep 20257:00 amRNSHalf-year Report
26th Aug 20257:00 amRNSCompletion of Acquisition & Divestment of Wells
19th Aug 202510:16 amRNSChange of Registered Office
31st Jul 20255:00 pmRNSTotal Voting Rights
30th Jul 202512:25 pmRNSResult of AGM
30th Jul 20257:00 amRNSAGM Statement and Acquisition Update
21st Jul 202511:32 amRNSHolding(s) in Company
17th Jul 20257:00 amRNSOperations update
14th Jul 202510:59 amRNSResult of General Meeting
30th Jun 20255:18 pmRNSTotal Voting Rights
30th Jun 20257:17 amRNSDirector Subscription to raise £0.7 million
30th Jun 20257:00 amRNSFinal Results
27th Jun 202512:34 pmRNSHolding(s) in Company
25th Jun 20257:00 amRNSResult of Oversubscribed Bookbuild & Notice of GM
24th Jun 20254:57 pmRNSProposed equity fundraising via ABB
29th May 20257:00 amRNSOperations Update
13th May 202512:03 pmRNS-RNew Corporate Presentation
13th May 20257:00 amRNSNew strategic partnership to provide up to US$100m
7th May 20257:00 amRNSSuccessful initial results from production test
30th Apr 20257:00 amRNSParadox project update
8th Apr 20257:00 amRNSParadox project update
11th Mar 20257:00 amRNSQ4 24 Williston Basin results & Paradox update
20th Feb 20257:00 amRNSSuccessful conclusion of drilling operations
20th Jan 20257:00 amRNSCommencement of drilling operations
9th Jan 20257:00 amRNSRig mobilisation underway
31st Dec 20247:00 amRNSReceipt of US$7.5 million drilling funds
23rd Dec 20247:00 amRNSAward of rig contract
18th Dec 20247:00 amRNSParadox project update - extended lateral funding
3rd Dec 20247:00 amRNSQ3 24 Williston Basin results & warrants extension
14th Nov 20247:00 amRNSParadox project update & joint broker appointment
16th Oct 20247:00 amRNSSemi-annual redetermination update
10th Oct 20247:00 amRNSParadox project update
26th Sep 20247:00 amRNSHalf-year Report
17th Sep 20247:00 amRNSResponse to market speculation
6th Sep 20247:00 amRNSSuccessful State 36-2R well production test result
29th Aug 20247:00 amRNSUpdate on helium project & State 36-2R well test
14th Aug 20247:00 amRNSQ2 2024 results from the Williston Basin portfolio
31st Jul 202411:48 amRNSResult of AGM
31st Jul 20247:00 amRNSAGM Statement and Salt Wash helium project update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.