We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZephyr Energy Regulatory News (ZPHR)

Share Price Information for Zephyr Energy (ZPHR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.35
Bid: 4.20
Ask: 4.50
Change: -0.20 (-4.40%)
Spread: 0.30 (7.143%)
Open: 4.55
High: 4.55
Low: 4.30
Prev. Close: 4.55
ZPHR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Paradox project update

8 Mar 2023 07:00

RNS Number : 2219S
Zephyr Energy PLC
08 March 2023
 

 

Prior to publication, the information contained within this announcement was deemed by the Company to constitute inside information as stipulated under the UK Market Abuse Regulation. With the publication of this announcement, this information is now considered to be in the public domain.

 

8 March 2023

Zephyr Energy plc

(the "Company" or "Zephyr")

 

 Paradox project update

 

Zephyr Energy plc (AIM: ZPHR), the Rocky Mountain oil and gas company focused on responsible resource development and carbon-neutral operations, is pleased to provide an update on operations on the State 36-2 LNW-CC well (the "State 36-2 well") and the State 16-2 LN-CC well (the "State 16-2 well") at the Company's flagship project in the Paradox Basin, Utah, U.S (the "Paradox project").  

 

State 36-2 well update

 

As reported on 19 January 2023, the State 36-2 well intersected a major natural fracture network in the Cane Creek reservoir which led to a significant influx of hydrocarbons into the wellbore. This influx was managed and safely controlled, which subsequently allowed for the drilling of an additional 132 feet in the fractured and productive Cane Creek reservoir. The Company then elected to run production casing down to the total-depth of the well.

 

The Company has now finalised its planning for the completion and production testing of the well's fractured reservoir interval. All services have been procured, with operations expected to start in the next two weeks when a service rig will be mobilised to site. Workover operations and production testing are expected to take four to six weeks to complete. The production test will be paid for from the Company's existing cash resources and any oil and/or condensate produced during the test is expected to be sold via existing marketing partners.

 

Production test results from the well, along with results from the production test on the State 16-2 well, will be integrated into Zephyr's overall reservoir model and will help define the next steps for the Paradox project development, including the sizing of related gas infrastructure and the associated capital expenditure.

 

State 16-2 well update

 

The first phase of the extended production testing on the well has now concluded within the flare consent limit set by the regulatory bodies, and the Company now plans to further test the well (subject to regulatory approval and during warmer weather months) in order to gather more data.

 

As previously announced, the State 16-2 well test was hampered by severe weather and surface facility commissioning issues which resulted in delays to the programme and, at times, intermittent operational activity.

 

During the most recent testing, the Company's efforts were primarily focused on surface facility issues, and once these issues had been successfully resolved, the well was initially brought online at choked-back, moderate rates in order to test for flow assurance at varying levels of production. At a controlled rate of 2 million square cubic feet of gas per day and 100 barrels of oil per day (an average of 433 barrels of oil equivalent per day) the well flowed continuously and surface flow assurance efforts proved successful.

 

As flow rates were increased above those levels, well performance became limited by fresh water pumping capacity and was subsequently impacted by the formation of down hole salt precipitate, an issue not uncommon with this type of completion. The precipitate, which blocked and subsequently cleared multiple times, impacted the well's flow capacity to achieve extended higher rates. The Company was in early stages of testing higher rates when its mandated flaring limits were reached. 

 

The Company is now assessing whether the precipitate issue is a function of continued flow back of injected completion fluids or a function of normal flowing conditions. If it is a result of normal flowing conditions, a series of mitigation solutions that have been successful in the past can be applied, and the Company will likely test these solutions in the coming months (subject to regulatory approvals) in order to fully determine the potential of the reservoir. 

 

In relation to the State 36-2 well production test, precipitate formation is not expected to pose an issue as the well is testing the natural fracture network. In addition, the well has not been hydraulically stimulated and will therefore not flow back large volumes of completion fluid (water).

 

Colin Harrington, Zephyr's Chief Executive, said:

"We're excited to production test the State 36-2 well, an operation which will commence shortly and which (due to the fact we're testing a natural fracture) is anticipated to take significantly less time than the State 16-2 well production test, which is still in the late flow back phase to clean up all injected completion fluids.

"In respect of the State 16-2 well test, the Company deliberately limited the well from a production perspective in order to first test flow assurance and uptime at a measured set of rates. The long ramp-up ultimately demonstrated success with stable constrained flows and solid uptime, but it also resulted in the utilisation of most of our approved gas flaring allotment during the ramp up phase.

"When constraints were relaxed to test the upper bounds of production rates, flow was impacted by downhole salt precipitation, but once the root cause is diagnosed, I'm confident our team will devise appropriate mitigation measures as needed, and our plan will be to seek additional authority for continued testing as we seek a greater understanding of the potential upside of the well. It's important to remember that the Paradox is an emerging play and one in which we are breaking new ground, and while start-up issues are not unexpected, our goal is to learn and improve with each subsequent phase of operations.

"We look forward to updating investors on the results from the State 36-2 production test and once the results from the test are analysed, we expect to be in a position to announce our plans for future drilling and infrastructure plans on the Paradox project."

 

Contacts

 

Zephyr Energy plc

Colin Harrington (CEO)

Chris Eadie (CFO)

 

 Tel: +44 (0)20 7225 4590

Allenby Capital Limited - AIM Nominated Adviser

Jeremy Porter / Vivek Bhardwaj

 

 Tel: +44 (0)20 3328 5656

 

Turner Pope Investments - Joint Broker

James Pope / Andy Thacker 

 

Panmure Gordon (UK) Limited - Joint Broker

John Prior / Hugh Rich / James Sinclair-Ford

 

Celicourt Communications - PR

Mark Antelme / Felicity Winkles

 Tel: +44 (0)20 3657 0050

 

 

Tel: +44 (0)20 7886 2500

 

 

 

Tel: +44 (0) 20 8434 2643

 

 

Qualified Person

 

Dr Gregor Maxwell, BSc Hons. Geology and Petroleum Geology, PhD, Technical Adviser to the Board of Zephyr Energy plc, who meets the criteria of a qualified person under the AIM Note for Mining and Oil & Gas Companies - June 2009, has reviewed and approved the technical information contained within this announcement.

 

Notes to Editors

 

Zephyr Energy plc (AIM: ZPHR) (OTCQB: ZPHRF) is a technology-led oil and gas company focused on responsible resource development from carbon-neutral operations in the Rocky Mountain region of the United States. The Company's mission is rooted in two core values: to be responsible stewards of its investors' capital, and to be responsible stewards of the environment in which it works.

 

Zephyr's flagship asset is an operated 45,000-acre leaseholding located in the Paradox Basin, Utah, 25,000 acres of which has been assessed to hold, net to Zephyr, 2P reserves of 2.6 million barrels of oil equivalent ("mmboe"), 2C resources of 34 mmboe and 2U resources 240 mmboe.

 

In addition to its operated assets, the Company owns working interests in a broad portfolio of non-operated producing wells across the Williston Basin in North Dakota and Montana. 

 

The Williston portfolio currently consists of working-interests in over 200 modern horizontal wells which are expected to provide production of 1,550 - 1,750 barrels of oil equivalent per day, net to Zephyr, in 2023. Cash flow from the Williston production will be used to fund the planned Paradox Basin development. In addition, the Board will consider further opportunistic value-accretive acquisitions. 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEADDXEDLDEAA
Date   Source Headline
25th Apr 20247:00 amRNSStart of well drilling operations
17th Apr 20247:00 amRNSState 36-2R well drilling operations update
10th Apr 20247:00 amRNSGrant of share options and issue of warrants
28th Mar 20247:00 amRNSAdditions to senior management team
27th Mar 20241:02 pmRNSSalt Wash helium project update - replacement
27th Mar 20247:00 amRNSSalt Wash helium project update
22nd Mar 20247:00 amRNSCommencement of Initial Drilling Operations
15th Mar 20247:00 amRNSAward of rig contract to Helmerich & Payne
11th Mar 20247:00 amRNSParadox project update
29th Feb 20247:00 amRNSQ4 2023 results from Williston Basin portfolio
14th Feb 20247:00 amRNSState 36-2R Drilling Permit Sundry Notice Approval
8th Feb 20247:00 amRNSOperations update
15th Dec 20237:00 amRNSOperational update
15th Nov 20237:00 amRNSQ3 2023 results from Williston Basin portfolio
1st Nov 20237:00 amRNSWilliston Basin Update
25th Oct 20237:00 amRNSInvestor Webinar Registration
18th Oct 202312:38 pmRNSInvestor Webinar
18th Oct 20237:00 amRNSParadox project update
29th Sep 20237:00 amRNSHalf-year Report
20th Sep 20237:00 amRNSStatement Re Market Speculation
15th Aug 20237:00 amRNSQ2 Williston Basin & State 36-2 LNW-CC Update
26th Jul 202311:39 amRNSResult of AGM
26th Jul 20237:00 amRNSAGM Statement
10th Jul 20237:00 amRNSParadox project update
30th Jun 20235:00 pmRNSTotal Voting Rights
26th Jun 20237:00 amRNSFinal Results
6th Jun 20237:00 amRNSPlacing & Subscription & Project Update
16th May 20237:00 amRNSQ1 Williston Basin & State 36-2 LNW-CC Update
2nd May 20237:00 amRNSHedging programme update
20th Apr 20236:15 pmRNSCorporate Presentation
13th Apr 20234:02 pmRNSInvestor Webinar
11th Apr 20237:00 amRNSState 36-2 LNW-CC well update
20th Mar 20237:00 amRNSState 36-2 LNW-CC well production test to commence
8th Mar 20237:00 amRNSParadox project update
28th Feb 20235:00 pmRNSTotal Voting Rights
15th Feb 20237:00 amRNSQ4 & FY 22 results from Williston Basin portfolio
14th Feb 20237:00 amRNSState 36-2 LNW-CC well update
10th Feb 20238:00 amRNSCompletion of Paradox project acquisition
1st Feb 20237:00 amRNSIssue of equity and change to total voting rights
31st Jan 20235:00 pmRNSTotal Voting Rights
19th Jan 20232:05 pmRNSSecond Price Monitoring Extn
19th Jan 20232:00 pmRNSPrice Monitoring Extension
19th Jan 20237:00 amRNSState 36-2 LNW-CC well update
29th Dec 20222:11 pmRNSWarrants exercise & Director/PDMR/PCA holdings
21st Dec 20227:00 amRNSAcquisitions and Operational Update
9th Dec 20227:00 amRNSAward of Grant Funding
1st Dec 20227:00 amRNSState 16-2 LN-CC well – Production test commenced
29th Nov 20227:00 amRNSCorporate Presentation
22nd Nov 20227:00 amRNSHolding(s) in Company
21st Nov 20227:00 amRNS36-2 LNW-CC well – Drilling Operations Commenced

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.