focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Carolusberg & O'Kiep Drilling Programme Completed

22 Sep 2015 07:00

RNS Number : 7387Z
Xtract Resources plc
22 September 2015
 



22 September 2015

 

Xtract Resources Plc

("Xtract" or "the Company")

 

Drilling and sampling programme completed ahead of schedule on the

Carolusberg and O'Kiep Sulphide Copper Tailings project

Xtract Resources Plc (AIM:XTR) is pleased to announce that it has completed Phase 1 of its drilling and sampling programme on the Carolusberg and O'Kiep sulphide copper tailings dams (the "Project") in the Northern Cape province of South Africa, located close to the town of Springbok (within a 30km radius). Phase 1 of the Project was undertaken to confirm the estimated grades, volume and recoveries of the copper and other associated base metals in the dumps and the commercial viability of the Project. The work programme was completed three weeks ahead of schedule.

The Project is estimated to contain 33.8Mt of sulphide tailings material on surface that was mined between 1980 and 2010 by O'Kiep Copper Company ("OCC"). The Carolusberg tailings dam represents 28Mt of material grading at 0.19% Cu and the O'Kiep tailings dam represents 5.8Mt of material grading at 0.23% Cu.

Whilst the original plan was to drill 2,500m on Phase 1 of the Project, the Company was encouraged by the fact that a total of just 342m of drilling was necessary in this phase to compile a preliminary economic assessment that will form the basis on which a decision can be made to take the Project to completion of a Bankable Feasibility Study ("BFS").

In Phase 1:

At O'Kiep

· from a total of 5 reverse circulation ("RC") holes drilled totalling 106m, 116 samples were taken

· the average thickness of the dump, from borehole information, is 19.4m

 

At Carolusberg

· from a total of 5 RC holes drilled totalling 236m, 265 samples were taken

· the average thickness of the dump, from borehole information, is 47.2m

 

A detailed survey was also undertaken on both tailings dams and the O'Kiep dump represents 4,877,711m3 and the Carolusberg dump 19,568,042m3. At an assumed specific gravity of 1.5 the total area of 24,445,753m3 would equate to 36.66Mt that is in excess of the estimate from historical data. All the samples from Phase 1 have been sent to an accredited laboratory in Johannesburg, South Africa. The laboratory is currently assaying the drill samples for base and precious metals as well as determining specific gravity of the material. Detailed metallurgical and mineralogical test work is also being completed.

 

Commenting on the completion of the programme, Jan Nelson, CEO, said: "The specific gravity results from the programme are due in the coming weeks which will provide us with the detailed information we are looking for in addition to the survey of the two tailings dumps, from which we have already confirmed that our volume estimates are correct. We will start to receive assay results within the next ten days and will report them to the market once confirmed. The results from the metallurgical test work will take approximately six weeks to complete.

 

"At Phase 1, we had originally planned to drill 2,500m on this project but it quickly became evident that we only needed to drill 342m in order to consider proceeding to BFS stage. This not only saves money but also speeds up the test result turn-around period. Phase 2 will be initiated once the results from Phase 1 are received and the total amount of drilling for phase 1 and 2 should not exceed 2,500m."

 

 

Enquiries:

Xtract Resources Plc

Jan Nelson, CEO

 

+44 (0)20 3416 6471

 

Cenkos Securities plc

Derrick Lee

Nick Tulloch

+44 (0)131 220 6939

Beaufort Securities

Jon Belliss

 

+44 (0)207 382 8300

St James's Corporate Services

Phil Dexter

 

+44 (0)20 7796 8647

+44 (0)7798 634398

Gable Communications

Justine James

xtract@gablecommunications.com

+44 (0)20 7193 7463

+44 (0) 7525 324431

 

Qualified Person

In accordance with AIM Guidelines, Peter Moir, B.Sc. Civil Engineering, M.Eng. Petroleum Engineering, UK Chartered Engineer and Director of Xtract Resources plc is the qualified person as defined in the Guidance Notes for Mining, Oil and Gas Companies, February 2010, of the London Stock Exchange, that has reviewed the technical information contained in this press release. Mr Moir has more than 30 years' experience in technical, operational and commercial aspects of the E&P business.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAENFAAESEAF
Date   Source Headline
30th Jun 20224:33 pmRNSFinal Results
22nd Jun 20229:06 amRNSProduction Update
31st May 202211:14 amRNSAscot Prospect Drill Results Summary
27th May 20223:03 pmRNSBushranger Project Assay Results
17th May 20229:14 amRNSBushranger Project Assay Results
10th May 20227:00 amRNSBushranger Project Assay Results
9th May 20225:27 pmRNSTotal Voting Rights
22nd Apr 20227:00 amRNSExercise of warrants
6th Apr 20227:00 amRNSBushranger Project Drilling Update
31st Mar 202212:19 pmRNSBushranger Project Assay Results
21st Mar 20226:12 pmRNSChange of auditor
21st Mar 20227:00 amRNSBushranger Project Assay Results
7th Mar 20227:00 amRNSBushranger Project Assay Results
2nd Mar 20227:00 amRNSBushranger Project drilling update
28th Feb 20224:40 pmRNSSecond Price Monitoring Extn
28th Feb 20224:36 pmRNSPrice Monitoring Extension
28th Feb 202212:56 pmRNSBushranger Project MIMDAS geophysical survey
10th Feb 20221:30 pmRNSBushranger Project Assay Results
3rd Feb 20222:30 pmRNSBushranger Project Assay Results
28th Jan 202212:04 pmRNSHolding(s) in Company
26th Jan 20227:00 amRNSMetallurgical test work planned at Bushranger
19th Jan 20223:45 pmRNSBushranger Project Assay Results
18th Jan 20227:00 amRNSManica Gold Update
6th Jan 202211:39 amRNSDirectorate Change
4th Jan 20224:41 pmRNSSecond Price Monitoring Extn
4th Jan 20224:36 pmRNSPrice Monitoring Extension
4th Jan 20222:06 pmRNSSecond Price Monitoring Extn
4th Jan 20222:00 pmRNSPrice Monitoring Extension
4th Jan 202211:05 amRNSSecond Price Monitoring Extn
4th Jan 202211:00 amRNSPrice Monitoring Extension
21st Dec 20217:00 amRNSBushranger Project Assay Results
17th Dec 20211:41 pmRNSBushranger Project Phase 2 Drilling Update
9th Dec 20212:53 pmRNSNew Porphyry Copper System at Bushranger Project
2nd Dec 20217:00 amRNSBushranger Project Drilling Update
24th Nov 20217:00 amRNSBushranger Project Assay Results
19th Nov 202111:42 amRNSBushranger assay results and drilling update
12th Nov 202110:25 amRNSBushranger Project Assay Results
9th Nov 202112:30 pmRNSBushranger Project Phase 2 Drilling Update
2nd Nov 20219:07 amRNSBushranger Project Phase 2 Drilling Update
29th Oct 20217:00 amRNSBushranger Project Further Assay Results
25th Oct 20215:29 pmRNSResult of AGM
21st Oct 20212:42 pmRNSBushranger Project Assay Results
20th Oct 20212:10 pmRNSBushranger Phase 2 Drilling Programme Update
14th Oct 20217:00 amRNSManica Gold Update
13th Oct 20217:00 amRNSBushranger drilling and licence update
7th Oct 20216:06 pmRNSBushranger Project Assay Results
7th Oct 202110:01 amRNSBushranger Phase 2 Drilling Programme Update
5th Oct 20217:00 amRNSManica Alluvial Gold Update Notice of AGM
1st Oct 202111:30 amRNSNotice of AGM
30th Sep 20212:50 pmRNSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.