Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining Starts at La Parrilla with First Mine Blast

27 Jul 2016 07:00

RNS Number : 3229F
W Resources PLC
27 July 2016
 

 

 

 

 

 

 

27 July 2016

 

 

W Resources Plc

("W" or the "Company")

 

 

Mining Commences at La Parrilla with First Mine Blast

 

W Resources Plc (AIM:WRES), the tungsten, copper and gold exploration and development company with assets in Spain and Portugal, is pleased to announce that hard rock mining at its La Parrilla Tungsten project in Spain started yesterday with the first blast at the mine shot successfully at 14.00 CET.

The explosive blast covered the first two 10 metre benches in the Fast Track Mine area and open up directly accessible ore to the mine operation.

 

RC drilling of 20 holes on the South and North lateral extensions of the pit have been completed and sample preparation for assays is now underway at the new La Parrilla lab facilities. Visual geological estimation under UV light of the t grid of RC holes and mine blast holes has added significant additional definition to the target mining area.

 

Michael Masterman, Chairman of W Resources said: "The first mine blast at La Parrilla is a significant event for W Resources and kicks off the commencement of hard rock mining operations. The explosive blast was completed successfully with the highest level of safety and supervision. Preparation for blasting with RC drilling and blast hole drilling has reconfirmed our high level of confidence with regard to a large lateral extension of the La Parrilla ore body to the South at potentially higher grades, based on site analysis with an XRF"

 

The next steps involve completion of grade control assays and mine planning and mine ore preparation. Process plant upgrades are planned to commence in September with concentrate production remaining on track for Q4 2016.

 

 

Enquiries:

W Resources Plc

Michael Masterman

T: +44 (0) 20 7193 7463

www.wresources.co.uk

Grant Thornton UK LLP

Colin Aaronson / Jen Clarke / Harrison Clarke

T: +44 (0) 20 7383 5100

 

SI Capital - Joint Broker

Andy Thacker / Nick Emerson

T: +44 (0) 1483 413500

www.sicapital.co.uk

 

Gable Communications

Justine James

T: +44 (0) 20 7193 7463

M: +44 (0) 7525 324431

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site has exceptional infrastructure in place, which is accessed directly from the highway along a 3 km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The mineral resource estimated by Golder in February 2016 at 0.04% WO3 cut-off grade is 51 million tonnes at 0.096% WO3 and 0.108 Sn, making it one of the largest tungsten deposits in the western world.

Technical information in this report and on the W website has been prepared in accordance with the JORC Code and approved for inclusion by Mr Fernando de la Fuente, is a 'qualified person' in respect of the AIM Rules for Companies with over 41 years' experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and an MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBQLLLQDFFBBD
Date   Source Headline
13th May 20143:05 pmRNSPlacing
24th Apr 20149:40 amRNSFinal Results for the Year Ended 31 December 2013
17th Apr 20149:49 amRNSEncouraging Gold and Copper Values in Portalegre
14th Apr 20147:00 amRNSFirst production from La Parrilla
6th Mar 20147:00 amRNSDrilling starts at high grade Tarouca Project
28th Feb 20147:01 amRNSLa Parrilla Tailings Update
26th Feb 201412:45 pmRNSResignation of Director
22nd Jan 20147:00 amRNSLa Parrilla Grades exceed expectations
13th Jan 20147:00 amRNSCommissioning of Pre-Concentration Plant
10th Dec 20134:45 pmRNSPlacing
24th Oct 20139:39 amRNSTrenching at Tarouca continues to deliver
26th Sep 201310:25 amRNSInterim Results
13th Sep 201311:45 amRNS3.5km Gold Anomaly Identified at Portalegre
30th Aug 20138:37 amRNSLa Parrilla Mine Acquisition
19th Jul 201310:12 amRNSDirector dealing
17th Jul 20139:05 amRNSPlacing
28th Jun 201312:40 pmRNSResult of AGM
18th Jun 201311:30 amRNSLa Parilla JORC Resource Increase of 30%
4th Jun 20134:15 pmRNSNotice of AGM
9th May 20139:35 amRNSW Resources commences construction of facility
24th Apr 201312:11 pmRNSAnnual Financial Report
18th Apr 201310:45 amRNSPlacing
19th Mar 20139:05 amRNSTarouca Early Exploration Success
8th Mar 201312:56 pmRNSHolding(s) in Company
25th Feb 20137:00 amRNSLa Parrilla Extension Drilling Completed
20th Feb 201310:09 amRNSPlacing
8th Feb 201310:00 amRNSDirector dealing
30th Jan 201310:27 amRNSW Resources completes Placing
28th Jan 20137:00 amRNSDrilling Update
22nd Jan 20137:00 amRNSLa Parrilla Tailings Project Approved
28th Nov 20129:56 amRNSHolding(s) in Company
16th Nov 20127:00 amRNSLa Parrilla Tailings Environmental Authorisation
8th Nov 20122:00 pmRNSW Resources Completes Placing
31st Oct 20127:00 amRNSPortalegre drilling update
30th Oct 20123:37 pmRNSHolding(s) in Company
29th Oct 20127:00 amRNSLa Parrilla Tailings Project Update
18th Oct 20127:00 amRNSCompany Presentation
4th Oct 20125:17 pmRNSJORC resources at Regua increase 30%
27th Sep 20127:00 amRNSInterim Results
10th Sep 20127:00 amRNSHigh Grade Assay Results Continue at La Parrilla
20th Aug 20127:00 amRNSHigh Grade Assay Results Continue at La Parrilla
13th Jul 201210:10 amRNSIssue of Equity
11th Jul 20124:20 pmRNSChange of Company Name
26th Jun 20124:15 pmRNSCaspian announces Placing
26th Jun 20122:05 pmRNSFirst assay results from Portalegre
22nd Jun 201211:48 amRNSResult of AGM
25th May 201210:00 amRNSCaspian to Acquire Assets in Portugal
16th May 20129:14 amRNSHigh Grade Assay Results
27th Apr 20129:45 amRNSFinal Results for the Year End 31 December 2011
16th Apr 20127:00 amRNSDrilling update - La Parrilla

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.