Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining Starts at La Parrilla with First Mine Blast

27 Jul 2016 07:00

RNS Number : 3229F
W Resources PLC
27 July 2016
 

 

 

 

 

 

 

27 July 2016

 

 

W Resources Plc

("W" or the "Company")

 

 

Mining Commences at La Parrilla with First Mine Blast

 

W Resources Plc (AIM:WRES), the tungsten, copper and gold exploration and development company with assets in Spain and Portugal, is pleased to announce that hard rock mining at its La Parrilla Tungsten project in Spain started yesterday with the first blast at the mine shot successfully at 14.00 CET.

The explosive blast covered the first two 10 metre benches in the Fast Track Mine area and open up directly accessible ore to the mine operation.

 

RC drilling of 20 holes on the South and North lateral extensions of the pit have been completed and sample preparation for assays is now underway at the new La Parrilla lab facilities. Visual geological estimation under UV light of the t grid of RC holes and mine blast holes has added significant additional definition to the target mining area.

 

Michael Masterman, Chairman of W Resources said: "The first mine blast at La Parrilla is a significant event for W Resources and kicks off the commencement of hard rock mining operations. The explosive blast was completed successfully with the highest level of safety and supervision. Preparation for blasting with RC drilling and blast hole drilling has reconfirmed our high level of confidence with regard to a large lateral extension of the La Parrilla ore body to the South at potentially higher grades, based on site analysis with an XRF"

 

The next steps involve completion of grade control assays and mine planning and mine ore preparation. Process plant upgrades are planned to commence in September with concentrate production remaining on track for Q4 2016.

 

 

Enquiries:

W Resources Plc

Michael Masterman

T: +44 (0) 20 7193 7463

www.wresources.co.uk

Grant Thornton UK LLP

Colin Aaronson / Jen Clarke / Harrison Clarke

T: +44 (0) 20 7383 5100

 

SI Capital - Joint Broker

Andy Thacker / Nick Emerson

T: +44 (0) 1483 413500

www.sicapital.co.uk

 

Gable Communications

Justine James

T: +44 (0) 20 7193 7463

M: +44 (0) 7525 324431

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site has exceptional infrastructure in place, which is accessed directly from the highway along a 3 km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The mineral resource estimated by Golder in February 2016 at 0.04% WO3 cut-off grade is 51 million tonnes at 0.096% WO3 and 0.108 Sn, making it one of the largest tungsten deposits in the western world.

Technical information in this report and on the W website has been prepared in accordance with the JORC Code and approved for inclusion by Mr Fernando de la Fuente, is a 'qualified person' in respect of the AIM Rules for Companies with over 41 years' experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and an MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBQLLLQDFFBBD
Date   Source Headline
25th Mar 20204:36 pmRNSPrice Monitoring Extension
16th Mar 20208:30 amRNSOngoing Operations and Covid-19 Response
10th Mar 20207:00 amRNSRégua and La Parrilla Update. Director Retirement
10th Mar 20207:00 amRNS£756,000 Placing to Spanish Investors at 0.36p
18th Feb 20207:00 amRNSNew Loan Facility and Extremadura Grant Update
5th Feb 20209:55 amRNSRégua Commencement and Updated Régua JORC Resource
20th Jan 20207:00 amRNSConversion of Directors' Loans
9th Jan 20208:33 amRNSFirst Shipment from New Concentrator Plant
8th Jan 20207:00 amRNSNon-Executive Director Appointment
18th Dec 20197:00 amRNSAdditional $5 Million Facility. La Parrilla Update
5th Dec 20197:00 amRNSFinance Update
29th Nov 20192:48 pmRNSIssue of Shares and Financing Update
28th Nov 20197:00 amRNSLa Parrilla Production Update
15th Nov 20193:05 pmRNSLa Parrilla Ramp-Up Finance Update
8th Nov 20197:03 amRNSLa Parrilla First Concentrate and Financing Update
21st Oct 20197:00 amRNSFirst Ore Fed to La Parrilla Concentrator Plant
30th Sep 20198:00 amRNSHalf-year Report to 30 June 2019
16th Sep 20197:00 amRNSEUR1m placement to Spanish Investors
9th Sep 20194:14 pmRNSCorrection - Corporate and EUR 5.3 m Grant Update
9th Sep 201910:02 amRNSCorporate and EUR 5.3 m Grant Update
29th Aug 20197:00 amRNSLa Parrilla Concentrator Construction Complete
16th Aug 201911:39 amRNSDirector/PDMR Shareholding
14th Aug 20192:48 pmRNSDirector/PDMR Shareholding
7th Aug 20197:00 amRNSLa Parrilla Tungsten & Tin Mine Update
5th Aug 20195:12 pmRNSHolding(s) in Company
28th Jun 201912:42 pmRNSResult of AGM
28th Jun 20197:00 amRNSLa Parrilla Update
19th Jun 20197:01 amRNSHaulage and Crushing Contract Signed for Régua
19th Jun 20197:00 amRNSLa Parrilla and São Martinho Update
7th Jun 20197:00 amRNSLa Parrilla Mining Contract Awarded
3rd Jun 20192:46 pmRNSNotice of AGM and Annual Report
29th May 20198:12 amRNSJoint Broker Appointment
22nd May 20197:00 amRNSExercise of Warrants by Directors
21st May 20197:00 amRNSLa Parrilla Jig Commissioned with First Ore
9th May 20197:00 amRNSAdvance on 5.3m EUR Grant through Extremadura Bank
2nd May 20197:00 amRNSLa Parrilla Update and Mine Blast
30th Apr 201911:57 amRNSFinal Results for the Year Ended 31 December 2018
29th Apr 201912:15 pmRNSMajor Shareholding Notification
18th Apr 201911:00 amRNSPrice Monitoring Extension
18th Apr 20199:31 amRNSEarly Exercise of Warrants
16th Apr 20197:00 amRNSJig & Mill Plant Completed for Commissioning
1st Apr 20197:00 amRNSHigh Grade Tungsten Intersections at Régua
18th Mar 20197:00 amRNSUpdate on La Parrilla and on Portuguese assets
5th Feb 20197:00 amRNSLa Parilla Mine Update and Issue of Shares
20th Dec 20187:00 amRNSLa Parrilla Mine's First Crushed Ore
10th Dec 20187:00 amRNSMechanical Completion of La Parrilla Crusher Plant
3rd Dec 20187:00 amRNSFirst Tungsten Shipment from the La Parrilla Mine
27th Nov 201810:50 amRNSPlacing to Raise £1.5m
23rd Nov 20187:00 amRNSTPI Investor Evening - 10 December
20th Nov 20184:19 pmRNSGrant of Share Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.