Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling at La Parrilla results

7 Dec 2015 07:00

RNS Number : 1282I
W Resources PLC
07 December 2015
 

 

 

 

 

 

 

7 December 2015

 

 

 

W Resources Plc

("W" or the "Company")

 

 

Drilling at La Parrilla Yields High Grade Intersections

from Surface - 40m @ 0.32% WO3

 

W Resources Plc (AIM:WRES), the tungsten, copper and gold mining, exploration, development and production company with assets located in Spain and Portugal, has received exceptional assay results from the latest phase of its drilling campaign at La Parrilla Fast Track Mine ('FTM') in Spain.

The RC and Diamond Core drilling programme at the FTM mining area, which received mine development approval in November, has returned some exceptionally strong assay results located near surface including: 40m at 0.32% WO3 from surface in Hole IRC1-40, 56.20m at 0.21% WO3 from 47.5m in Hole IP-21 and 19m at 0.2% WO3 from 21m in Hole IRC1-33. These are thick intersections at materially higher grade than the rest of the orebody and further indicate the mineralisation is open to the South East and at depth.

Drilling at La Parrilla West has also delivered solid results with new Hole IP-25 reporting 28.40m at 0.25% WO3 from 43.2m.

Commenting on the results Michael Masterman, Chairman of W Resources said: "We are delighted with the latest drilling results at La Parrilla which highlight high grades in the South East of the FTM area as well as at La Parrilla West. The thick, high grade results in the FTM area are at the edge of what was previously considered the southern extent of the orebody - this is now open with significant grade and tonnage potential.These results enable us to better delineate the areas for mine planning next year and are higher than initially expected.

"The project continues to make good progress, with metallurgical and process design work advancing well, and updated geological modelling underway for the updated JORC compliant mineral resource estimate. The resource update will be completed in Q1 2016 and will form the base of revised mine plan and design. We remain on track for production and cash flow generation from the Fast Track Mine in late 2016."

A summary of key results is shown in the following table:

TYPE

HOLE

FROM

(m)

TO

(m)

INTERSECTION

(m)

TRUE THICKNESS (m)

WO3

ppm

WO3

%

Sn

ppm

Sn

%

CORE

IP-13

48.40

82.80

34.40

29.79

871

0.087

477

0.048

CORE

IP-15

66.00

89.30

23.30

20.18

1018

0.102

139

0.014

CORE

IP-16

74.50

92.30

17.80

15.41

952

0.095

599

0.060

CORE

IP-16

98.55

117.60

19.05

16.50

1211

0.121

130

0.013

CORE

IP-17

10.20

76.50

66.30

57.42

1531

0.153

320

0.032

CORE

IP-17

85.45

106.30

20.85

18.06

849

0.085

356

0.036

CORE

IP-19

20.45

35.65

15.20

13.16

995

0.100

170

0.017

CORE

IP-19

85.30

100.30

15.00

12.99

1331

0.133

48

0.005

CORE

IP-21

47.50

103.70

56.20

48.67

2113

0.211

84

0.008

CORE

IP-22

11.00

46.15

35.15

30.44

1296

0.130

195

0.020

CORE

IP-25

43.20

71.60

28.40

24.59

2533

0.253

49

0.005

RC

IRC1-02

6.00

36.00

30.00

25.98

1675

0.168

91

0.009

RC

IRC1-03

9.00

40.00

31.00

26.85

844

0.084

1449

0.145

RC

IRC1-06

0.00

15.00

15.00

12.99

1178

0.118

37

0.004

RC

IRC1-06

29.00

40.00

11.00

9.53

1617

0.162

217

0.022

RC

IRC1-10

33.00

40.00

7.00

6.06

1059

0.106

95

0.010

RC

IRC1-22

0.00

22.00

22.00

19.05

493

0.049

1035

0.104

RC

IRC1-32

20.00

30.00

10.00

8.66

792

0.079

577

0.058

RC

IRC1-33

21.00

40.00

19.00

15.75

2010

0.201

283

0.028

RC

IRC1-40

0.00

40.00

40.00

33.16

3185

0.319

779

0.078

 

 

Enquiries:

W Resources Plc

Michael Masterman

T: +44 (0) 20 7193 7463

www.wresources.co.uk

Grant Thornton UK LLP

Colin Aaronson / Jen Clarke / Harrison Clarke

T: +44 (0) 20 7383 5100

SI Capital - Joint Broker

Andy Thacker / Nick Emerson

T: +44 (0) 1483 413500

www.sicapital.co.uk

Gable Communications

Justine James

T: +44 (0) 20 7193 7463

M: +44 (0) 7525 324431

Northland Capital Partners - Joint Broker

John Howes / Abigail Wayne (Corporate Broking)

T: +44 (0) 20 7382 1100

www.northlandcp.co.uk

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site has exceptional infrastructure in place, which is accessed directly from the highway along a 3 km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The mine resource estimated by Golder in June 2013 is 46.92 million tonnes at 0.09% WO3, making it one of the largest tungsten deposits in the western world.

 

 

 

 

 

 

JORC Code, 2012 Edition - Table 1 report

Section 1 - Sampling Techniques and Data

 

Criteria

JORC Code explanation

Commentary

Sampling techniques

· Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

· Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

· Aspects of the determination of mineralisation that are Material to the Public Report.

· In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

· Core drilling was used to obtain core samples.

· All core was sampled in 1.4 - 3.6 m intervals. Sampling is mainly carried out over three metres intervals.

· All core samples were packed on thick plastic bags with sample reference indicated both in the outside and inside with permanent ink marker pens in the outside and inside.

· For transport the plastic bags were packed in thick plastic containers with sample reference indicated in the outside with permanent ink marker.

· RC drilling was used to obtain RC rock chip samples.

· RC chips were sampled in 1 m intervals.

· All RC samples were packed on thick plastic bags with sample reference indicated both in the outside and inside with permanent ink marker pens in the outside and inside.

· For transport the plastic bags were packed in big-bags containers.

Drilling techniques

· Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

· Core drilling was undertaken with a track mounted ROLATEC RL-600 drill rig.

· PQ wireline core (85 mm recovered Æ) was used for insuring better recovery in the weathered or fractured surficial rock mass, while otherwise HQ (63.5 mm recovered Æ) was used.

· All core drill holes have been subject to downhole surveying, to record variations from the original inclination.

· RC drilling was undertaken with a track mounted RGC-2500 drill rig.

· The rig was equipped with 140 mm Æ drill bits (136 mm recovered Æ).

· The RC rock chips were collected in a cyclone and then in thick plastic sample bags.

· All core and RC drill holes were surveyed at the collar surface by high-resolution topographic survey. Data for Eastings, Northings and RL were recorded on UTM grid, Zone 29, datum ED50.

Drill sample recovery

· Method of recording and assessing core and chip sample recoveries and results assessed.

· Measures taken to maximise sample recovery and ensure representative nature of the samples.

· Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

· Core sample recovery was measured, recorded onto a logging sheet, photographed and inserted in an Excel spreadsheet.

· RC sample recovery was estimated by weight and recorded onto a logging sheet in an Excel spreadsheet.

 

Logging

· Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

· Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

· The total length and percentage of the relevant intersections logged.

· Core logging was performed after core fragment reconstruction in the core trays, and a line was marked along the core axis.

· Geotechnical core logging was systematically done. Data collection (recovery, RQD, joint orientation, spacing, roughness and weathering) was recorded onto a log sheet and inserted in an Excel spreadsheet.

· Geological core logging was systematically done. Data collection (lithology, alteration, structural data mineralisation and sampling intervals) was recorded onto a log sheet and inserted in an Excel spreadsheet.

· All drill holes have been systematically logged both descriptive and stringer-coded for digital processing and output with specific software.

· RC holes logging was performed. A representative subsample was taken for binocular and under UV lamp examinations.

Sub-sampling techniques and sample preparation

· If core, whether cut or sawn and whether quarter, half or all core taken.

· If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

· For all sample types, the nature, quality and appropriateness of the sample preparation technique.

· Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

· Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

· Whether sample sizes are appropriate to the grain size of the material being sampled.

· The core was cut with a diamond saw along a line marked in the centre of the core, splitting the core into two equal halves. One half of the PQ-HQ core sample intervals was sent for analysis and the remaining half was kept in wooden core boxes for storage and future reference.

· All half-core samples are sent for preparation to ALS Minerals facility in Seville (Spain).

· At ALS facilities, samples were dried, crushed (80%mm) to produce a representative sub-sample for analysis.

· The RC samples were dried and crushed at the mine laboratory to 80%ALS Minerals facility in Seville (Spain) to be pulverized (85%mm) to produce a representative sub-sample for analysis.

· The resulting pulps are shipped to ALS Minerals laboratory in Loughrea (Ireland) for assay using the ME-MS81 method (30 elements by lithium borate fusion and ICP-MS). Samples exceeding the upper detection limit (10,000 ppm W) are re-assayed by the lithium borate fusion and XRF determination ME-XRF10 method at ALS Minerals laboratory in Vancouver (Canada). Tungsten assays are reported by ALS Minerals as W and converted to WO3 using a factor of 1.26108.

· For the RC samples, assays using ME-4ACD81 method (12 elements by four acid digestion and ICP-AES) were also performed.

· The following elements were included in the core samples analysis: W, Sn, Ba, Ce, Cr, Cs, Dy, Er, Eu, Ga, Gd, Hf, Ho, La, Lu, Nb, Nd, Pr, Rb, Sm, Sr, Ta, Tb, Th, Tm, U, V, Y, Yb, Zr.

· The following elements were included in the RC samples analysis: W, Sn, Ba, Ce, Cr, Cs, Dy, Er, Eu, Ga, Gd, Hf, Ho, La, Lu, Nb, Nd, Pr, Rb, Sm, Sr, Ta, Tb, Th, Tm, U, V, Y, Yb, Zr, Ag, As, Cd, Co, Cu, Li, Mo, Ni, Pb, Sc, Tl, Zn.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDGBDDBSGBGUL
Date   Source Headline
20th Nov 20187:00 amRNSLa Parrilla Commences Tungsten Tin Production
12th Nov 20184:40 pmRNSSecond Price Monitoring Extn
12th Nov 20184:35 pmRNSPrice Monitoring Extension
15th Oct 20187:53 amRNSNew Website
1st Oct 201811:30 amRNSHansource Investments Reinstated
18th Sep 20187:00 amRNSHigh Grade Tungsten Intersections at Regua
17th Sep 20187:00 amRNSNon-Executive Director Appointments
13th Sep 20187:00 amRNSLa Parrilla Project Update
10th Sep 20187:00 amRNSHalf-year Report to 30 June 2018
5th Sep 20187:00 amRNSRio Tinto & Lundin Mining Execs Strengthen Team
8th Aug 20185:33 pmRNSDirector/PDMR Shareholding
31st Jul 20187:06 amRNSDirector/PDMR Shareholding
13th Jul 20187:00 amRNSThick Gold intersections and high grades
29th Jun 201811:30 amRNSResult of AGM
27th Jun 20187:00 amRNSSteelwork & Equipment Deliveries at La Parrilla
7th Jun 20187:00 amRNSHigh-grade Tungsten at Tarouca
1st Jun 20187:00 amRNSNotice of AGM
1st Jun 20187:00 amRNSFinal Results for the Year Ended 31 December 2017
31st May 201811:30 amRNSReplacement: Final Draw Down Completes US$35m
30th May 20187:00 amRNSFinal Draw Down Completes US$35m BlackRock Funding
17th May 20187:00 amRNSUpdated Presentation - May 2018
3rd May 201812:26 pmRNSHansource Investments Limited
1st May 20187:13 amRNSS?o Martinho Drilling Programme Commences
26th Apr 20187:00 amRNSCompletion of Tarouca RC Drilling Programme
18th Apr 20187:00 amRNSInvestor Presentation - 14 May
17th Apr 20188:46 amRNSTungsten, Copper and Gold Update
5th Apr 20188:52 amRNSPlacing to Raise £1.5 million
3rd Apr 20187:44 amRNSEarthworks Commence at La Parrilla
28th Mar 20187:00 amRNSEUR5.3m Grant Awarded for Development- La Parrilla
27th Feb 20187:00 amRNSRegua Land Purchase Clears Last Hurdle for Develop
23rd Feb 20187:00 amRNSMajor Offtake Agreements
21st Feb 201811:29 amRNSExercise of Warrants
16th Feb 20187:00 amRNSUS$35m Loan Facility Finalised with BlackRock
1st Feb 20187:00 amRNSFinancing update - La Parrilla term loan
17th Jan 20182:30 pmRNSHolding(s) in Company
10th Jan 20187:00 amRNSConcentrator Contract awarded
12th Dec 20177:00 amRNSFinancing Update: US$30m Term Loan
31st Oct 20177:00 amRNSHolding(s) in Company
6th Oct 20177:00 amRNSPlacing to Director to Raise an Additional £100k
5th Oct 20178:13 amRNSEquity fundraising
27th Sep 201712:25 pmRNSHalf Year Results for the Six Months Ended 30 June
27th Sep 20178:57 amRNSIssue of Shares
20th Sep 20177:00 amRNSTarouca Exploration Licence Extension Approved
14th Sep 20174:08 pmRNSHolding(s) in Company
12th Sep 20177:00 amRNSInvestor Event - 19 September 2017
25th Aug 20175:35 pmRNSFinancial Investment Decision Report and Presentat
25th Aug 201711:01 amRNSFinancial Investment Decision Report & Debt Update
7th Aug 20177:00 amRNSCrusher Contract Awarded to Metso
21st Jul 20179:54 amRNSChange of Registered Office Address
26th Jun 201712:58 pmRNSResults of Annual General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.