Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWoodbois Regulatory News (WBI)

Share Price Information for Woodbois (WBI)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.475
Bid: 0.45
Ask: 0.50
Change: -0.02 (-4.04%)
Spread: 0.05 (11.111%)
Open: 0.495
High: 0.495
Low: 0.475
Prev. Close: 0.495
WBI Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bushveld Tin Project Update

13 Dec 2012 09:55

RNS Number : 4557T
Obtala Resources Limited
13 December 2012
 



 

 

13 December 2012

 

 

Obtala Resources Limited

("Obtala" or the "Company")

(AIM: OBT)

 Mokopane Tin Project Update

Initial Metallurgical Results from the Zaaiplaats and Groenfontein Targets

The Board of Obtala Resources Limited, the natural resources investment and development company, announces the following RNS made by Bushveld Minerals Ltd this morning:

Obtala Resources

Francesco Scolaro - ChairmanSimon Rollason - Managing Director

www.obtalaresources.com

 

+44 (0) 20 7099 1940

 

Macquarie Capital (Europe) Limited

(Nomad and Broker)

Steve Baldwin

+44 (0) 20 3037 2000

Nicholas Harland

 

 

Bushveld Minerals Ltd

("Bushveld" or the "Company")

Mokopane Tin Project Update

Initial Metallurgical Results from the Zaaiplaats and GroenfonteinTargets

Bushveld Minerals Limited (AIM: BMN), a mineral development Company focused on iron and tin projects in southern Africa is pleased to provide an update on metallurgical testwork relating to its Mokopane Tin Project.

Bushveld's Mokopane Tin Project consists of one licence covering 13,422 ha where several targets for open-castable disseminated tin resources have been identified. The license area covers the historic Zaaiplaats and Groenfontein mines that between them formed the second largest tin mining district in South Africa, where mining ceased in the late 1980's as a result of depressed tin prices.

 

The Company recently announced an update on 4 December 2012 of its drilling programme on the second of five targets in its license area. This drilling work is ongoing and expected to be completed within this calendar year, followed by modeling to determine the size of the resource in accordance with the JORC standard.

 

Bushveld has undertaken initial mineralogical and metallurgical testwork on bulk samples from the Groenfontein and Zaaiplaats tin targets. The objective of the testwork is to determine mineralogical characterization of the ore in terms of grain size and liberation characteristics.

 

Bulk samples from Groenfontein and Zaaiplaats targets were submitted to SGS South Africa for mineralogical characterization. The samples were crushed to 100% passing 2mm and various aliquots (representative sample of a larger sample) were extracted for mineralogical investigation. One aliquot was used for size by grade analysis involving seven different size fractions from 2000µm down to 38 µm. Another aliquot was screened into four size fractions (+1000µm, +212 µm, +75µm and -75µm) to produce transverse polished blocks of each size fraction. The blocks were then subjected to QEMSCAN analysis to determine mineral abundances, distributions per size fraction, mineral associations, liberation characteristics and grain size distributions in terms of the minerals of interest. The mineralogy results served as basis for devising preliminary process routes for the Groenfontein and Zaaiplaats ores.

 

The results are highlighted below:

·; Results from tests conducted in the well-known Zaaiplaats tin mining district are displaying similar characteristics to historical mining records, as well as significant potential for resource expansion

·; Good liberation of cassiterite through all size fractions on the Zaaiplaats ore, including significant liberation (>46%) above 1mm

·; Good liberation (>50%) of cassiterite above 212µm for the Groenfontein ore, with near-total liberation (

·; Potential processing routes outlined for both the Groenfontein and Zaaiplaats ores.

The next steps will entail mineral deportment characterization and densimetric profiling of the Groenfontein and Zaaiplaats ores. The results of these laboratory tests will serve to narrow down the metallurgical process route options and dictate the subsequent pilot plant test work regime to be followed. Final process design concerning the commercial plant will be based on the pilot plant test results.

Commenting on the results, Fortune Mojapelo, the Company's CEO, said "The initial metallurgical results demonstrate good liberation of the tin oxide (cassiterite) across different grinding size fractions. This is very encouraging as we seek to accelerate the development of the company's tin projects towards production in the short to medium term. The liberation characteristics shown by both Zaaiplaats and Groenfontein provide further confidence in our exploration programme which in the short term is focused on a) expanding the existing resource base by a combination of drilling on the existing targets and acquisition of additional brownfield projects in the Bushveld Complex, b) demonstrating the metallurgical treatability of the ore and c) advancing the projects towards production in the medium term."

Please refer to Appendix 1 for details on the testing methodology

 

Enquiries: info@bushveldminerals.com

Bushveld Minerals

Fortune Mojapelo

+27 (0) 11 268 6555

Fox Davies

Jonathan Evans

+44 (0) 20 3463 5000

Tavistock Communications

Jos Simson/ Jessica Fontaine

+44 (0) 20 7920 3150

Tielle Communications

StéphanieLeclercq

+27 (0) 83 307 7587

 

 

Appendix 1

 

1. Methodology:

Bulk samples of both the Groenfontein and Zaaiplaats ores (collected from old workings on each target) were crushed and processed into various size fractions at SGS, and sent for both grading analysis and QEMSCAN Particle Mineralogical Analysis (PMA), The analysis is designed to collect quantitative data on mineral abundances, distributions per size fraction, mineral associations, liberation characteristics, and grain size distributions for the minerals of interest.

 

2. Summary and Interpretation of SGS Results

2.1. Groenfontein Ore: This ore exhibits no liberation of the cassiterite above 1mm thus suggesting the presence of only fine-grained cassiterite in the ore. The best liberation is observed in the size fractions smaller than 212μm.

2.2. Zaaiplaats Ore: This ore exhibits good liberation of the cassiterite through all the size fractions studied with significant liberation (>46%) above 1mm. These results suggest the presence of a wide size distribution of cassiterite grains in the ore matrix that feature clearly defined grain boundaries.

 

3. Preliminary Metallurgical Process Routes

3.1. Beneficiation of the Groenfontein Ore - the following process route is suggested for this ore (Figure 1):

a) Crushing of the ore via a jaw crusher & cone crusher and screening to 100% passing 16mm (Dry crushing & screening plant).

b) Milling of the crushing plant product stream via rod mills and ball mills to 100% passing 1mm.

c) Screening of the milled ore via Derrick StackSizer screens to produce three size fractions:

i. -1mm +500µm

ii. -500µm +100µm

iii. -100µm

d) Recovery of the cassiterite in the 1mm +500μm size fraction via heavy mineral spirals (Spiral Battery No. 1).

e) Recovery of the cassiterite in the 500μm +100μm size fraction via heavy mineral spirals (Spiral Battery No. 2).

f) Re-grinding of the middlings fraction of Spiral Battery No. 1 via a ball mall operating in closed circuit with a 500μm screen:

i. Mill product stream passing to the Derrick Stack Sizer screens in paragraph (c) above.

g) Recovery of the cassiterite in the -100µm size fraction via a centrifugal concentrator (Falcon concentrator or Kelsey Centrifugal Jig).

h) Upgrading of the concentrates produced in (d), (e) and (g) above via shaking tables specifically selected for each size fraction.

i. Shaking table concentrates passed to smelter.

 

 

3.2. The following process route is suggested for the beneficiation of the Zaaiplaats ore (Figure 2):

a) Crushing of the ore via a jaw crusher & cone crushers (two stages) and screening to 100% passing 4mm (Wet crushing & screening plant).

b) Screening of the crushing plant product stream to produce two size fractions:

i. -4mm +1mm

ii. -1mm

c) Recovery of the cassiterite in the -4mm +1mm size fraction via dense medium separation (DMS):

i. The DMS concentrates passing to the smelter.

ii. The DMS tails passing to a ball mill operating in closed circuit with a 1mm screen.

d) Screening of the milled ore plus the 1mm size fraction ex paragraph (b)(ii) above via a Derrick StackSizer screen to produce two size fractions:

i. -1mm +150µm.

ii. -150µm.

e) Recovery of the cassiterite in the -1mm +150µm size fraction via heavy mineral spirals.

f) Recovery of the cassiterite in the -150µm size fraction via a centrifugal concentrator (Falcon concentrator or Kelsey Centrifugal Jig).

i. Upgrading of the concentrates produced in (e) and (f) above via shaking tables specifically selected for each size fraction:

ii. Shaking table concentrates passed to smelter.

 

This information is provided by RNS

The company news service from the London Stock Exchange

 

 - ENDS -

 

Notes to the editor

Bushveld Minerals Limited is a mineral development company focused on the Bushveld Iron Ore Project and the Mokopane Tin Project, both located on the northern limb of the Bushveld Complex, South Africa.

The Bushveld Iron Ore Project comprises two licenses covering 7,409 ha where a JORC compliant open-castable resource of 633 million tonnes (comprising 260 million tonnes Indicated and a further 373 million tonnes Inferred) has been established from a 4.5 km strike length. Further drilling along strike is expected to significantly add to the resource on the basis of identified strike extensions several kilometres long to the north and south of the project area with a target resource in excess of 1 billion tonnes planned. A scoping study on the project is underway for completion in Q1 2013.

The Mokopane Tin Project consists of one licence covering 13,422 ha where numerous targets for open-castable disseminated tin resources have been identified. The Company has explored and drilled one target (Groenfontein) and has short-term plans to explore a further four targets. The Company has established a JORC resource in excess of 5,000 tonnes of tin on the first target drilled, and is looking to expand the resource base by undertaking an exploration and drilling programme on other targets in the licence area as well as in areas currently under application. In the longer term, the Company intends to expand the resource base further by acquiring additional projects in the Bushveld Complex and elsewhere.

 

The Company was admitted to the AIM of the London Stock Exchange in March 2012.

The scientific and technical information contained within this announcement has been reviewed and approved by Joe van Niekerk, a metallurgical consultant to the company on tin projects. Joe is a consulting metallurgist with 33 years experience in extractive metallurgy with an emphasis on ore dressing including physical separation techniques across a broad range of minerals.

 

Figure 1. Groenfontein Block Flow Diagram

 

 

Figure 2.Zaaiplaats Block Flow Diagram

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKMMMZLFDGZZG
Date   Source Headline
6th Jul 20167:00 amRNSForestry Update
30th Jun 20163:05 pmRNSShare Option Awards
30th Jun 20163:00 pmRNSForestry Update
29th Jun 20167:01 amRNSBusiness Update & Directorate Changes
29th Jun 20167:00 amRNSFinal Results
2nd Jun 20167:00 amRNSProposed Change of Company Name
31st May 20167:00 amRNSForestry Update
27th May 20169:49 amRNSHolding(s) in Company
11th May 20164:26 pmRNSHolding(s) in Company
10th May 20163:32 pmRNSHolding(s) in Company
6th May 20162:30 pmRNSMove to SETSqx
29th Apr 20167:00 amRNSForestry Update
28th Apr 201610:32 amRNSHolding(s) in Company
27th Apr 20162:23 pmRNSHolding(s) in Company
27th Apr 201611:55 amRNSHolding(s) in Company
27th Apr 20167:00 amRNSStrategy Update
26th Apr 20164:08 pmRNSHolding(s) in Company
25th Apr 20161:00 pmRNSBoard Changes
4th Apr 20167:00 amRNSOperational Update - Q1 2016
1st Mar 20167:00 amRNSForestry Update
22nd Feb 20165:13 pmRNSHolding(s) in Company
19th Feb 20164:23 pmRNSHolding(s) in Company
17th Feb 20167:00 amRNSInvestment and Offtake Arrangements
1st Feb 20165:58 pmRNSHolding(s) in Company
2nd Dec 201512:54 pmRNSTimber Update
25th Nov 20157:00 amRNSAgriculture Update
6th Nov 20157:00 amRNSAgriculture Update
15th Oct 20157:00 amRNSProposed listing of the forestry division
29th Sep 20157:00 amRNSHalf Yearly Report
1st Sep 20157:03 amRNSMembership of the Social Stock Exchange
11th Aug 20151:47 pmRNSDirectorate Changes
11th Aug 201511:43 amRNSResult of AGM
31st Jul 20157:00 amRNSFarm Certification: Tanzania
30th Jun 20157:00 amRNSFinal Results
15th Jun 20157:00 amRNSTimber Strategy Update
27th May 20158:33 amRNSOperational Update
21st May 20159:58 amRNSHolding(s) in Company
16th Apr 20157:00 amRNSDirectorate Changes
9th Apr 201511:44 amRNSHolding(s) in Company
16th Mar 201512:45 pmRNSHolding(s) in Company
16th Mar 201512:45 pmRNSHolding(s) in Company
12th Mar 20157:00 amRNSNew Forestry Joint Venture Agreements and Update
10th Mar 20157:03 amRNSDirectorate Change
23rd Feb 201511:27 amRNSHolding(s) in Company
29th Jan 20157:00 amRNSAfrican Home Stores Introduces Apple to Lesotho
16th Dec 20147:00 amRNSOperational Update and Cancellation of Warrants
18th Nov 20142:49 pmRNSHolding(s) in Company
30th Oct 20142:00 pmRNSChange of Adviser
30th Oct 20147:00 amRNSAcquisition
13th Oct 20147:00 amRNSAdditional Farm Land

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.