Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Batch Drilling of Two Wells Underway, Cameroon

28 Nov 2016 07:00

RNS Number : 2359Q
Victoria Oil & Gas PLC
28 November 2016
 

 

 

28 November 2016

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

 

Batch Drilling of Two Wells Underway, Cameroon

 

Gaz du Cameroun S.A. (GDC), the Company's Cameroon gas producing and distributing subsidiary, announces that following spudding of well La-107 on November 1 2016, it has successfully drilled, cased and cemented the uppermost, 18⅝" section of the well to a depth of 400 metres. Operations on La-107 were then suspended as planned and the rig was skidded a distance of 10 metres along the rail system to the La-108 well location. The 1500 HP Komako 1 drilling rig, owned and operated by Savannah Oil Services Cameroon S.A., is a rail-mounted drilling rig and can skid between the two wells in a matter of hours.

 

Well La-108 was spudded on the 12th November 2016 and has been drilled and cased to a depth of 400 metres. Currently, Savannah is drilling the 17½" hole section on La-108, after which the rig will be skidded back to the La-107 well to drill its 17½" hole section.

 

The gas bearing target horizons, from which it is anticipated both new wells will produce, are in the Upper Cretaceous (Campanian and Santonian) Logbaba Formation, which is a thick sequence of interbedded sands and shales found at depths between 1,700m and 3,200m below the surface.

 

Rig Skidding and Batch Drilling

 

The 2016/17 drilling campaign at Logbaba is designed as a 'batch drilling' operation. As a well is drilled, the equipment, drilling fluids, drilling services and specialist personnel required vary for each hole section. In a batch drilling operation, the rig is moved back and forth between the wells, progressing through all the hole sections until the wells have reached target depth. The Komako 1 rail mounted drilling rig is designed for this type of operation.

 

Significant cost saving and efficiencies are realised from a batch drilling programme, as materials and services are mobilised to the site, employed on both wells for each hole section and then demobilised when no longer required. In a conventional back-to-back two well drilling campaign the equipment and materials are all mobilised as required for the first well and then all equipment remains on standby rental until it is required again on the second well, three or four months later. With batch drilling the Company avoids having significant amounts of equipment and services on standby for 3 or 4 months between wells.

 

This announcement contains inside information.

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Kevin Foo/Laurence Read Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited

Rory Murphy / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy / Toby Gibbs (corporate finance) Tel: +44 (0) 207 408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright/David van Erp Tel: +44 (0) 207 448 0200

 

Bell Pottinger

Daniel Thöle / Charles Stewart / Zara de Belder Tel: +44 (0) 20 3 772 2499

 

Notes to Editors

 

About Victoria Oil & Gas Plc

 

Victoria Oil & Gas (VOG.L) is a gas producing and distributing company.

 

The Company's subsidiary, Gaz du Cameroun S.A. ("GDC") owns a 60% participating interest and operates the onshore Logbaba Gas Project. The Logbaba Gas Project supplies cost effective, clean and reliable natural gas to industries in the Douala region of Cameroon. RSM Production Corporation, an affiliate of Grynberg Petroleum Company of Denver, Colorado holds the remaining 40% participating interest. In addition, VOG has recently been assigned a 75% participating interest in the Matanda block, which neighbours the Logbaba block. The remaining 25% participating interest is held by AFEX.

 

VOG also holds 100% of the West Medvezhye oil and gas exploration project near Nadym, Russia. Given the challenging economic environment in Russia, the Group has fully impaired the West Medvezhye assets.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIALTLDFIR
Date   Source Headline
6th May 20104:35 pmRNSPrice Monitoring Extension
5th May 20107:00 amRNSLetter to Shareholders
28th Apr 20104:35 pmRNSPrice Monitoring Extension
23rd Apr 20107:00 amRNSNotice of General Meeting
21st Apr 20107:00 amRNSLogbaba Update
23rd Mar 20109:19 amRNSDirectorate Change
9th Mar 20107:00 amRNSTest Results
1st Mar 20107:00 amRNSPlacing and Directors' share interests
26th Feb 20103:05 pmRNSHalf Yearly Report
17th Feb 20107:00 amRNSLetter to Shareholders
10th Feb 20107:00 amRNSAdditional Listing
9th Feb 20107:00 amRNSLogbaba Update
4th Feb 20107:00 amRNSResults at Logbaba Natural Gas Project, Cameroon
19th Jan 20107:00 amRNSUpdate on Logbaba Natural Gas Project, Cameroon
6th Jan 20107:00 amRNSLogbaba Update
31st Dec 200912:40 pmRNSSecond Price Monitoring Extn
31st Dec 200912:35 pmRNSPrice Monitoring Extension
18th Dec 20091:01 pmRNSResult of AGM
18th Dec 20098:00 amRNSOperations update
25th Nov 20097:00 amRNSFinal Results
24th Nov 20092:29 pmRNSAdditional Listing
16th Nov 20097:00 amRNSLogbaba Update
30th Oct 20091:24 pmRNSResignation of Director
26th Oct 20099:26 amRNSLetter to Shareholders
26th Oct 20097:00 amRNSExercise of Warrants
15th Oct 20095:45 pmRNSChange of Name of Nominated Adviser
1st Oct 200910:09 amRNSAdditional Listing & Director Shareholding
1st Oct 200910:04 amRNSDirectorate Change
1st Sep 200910:30 amRNSOperational Update
28th Aug 20097:00 amRNSPlacing of New Shares
26th Aug 20097:00 amRNSAdditional Listing and Exercise of Warrants
25th Aug 200911:13 amRNSHolding(s) in Company
19th Aug 20097:00 amRNSOperational Update
17th Aug 20091:16 pmRNSAdditional Listing
6th Aug 20097:00 amRNSAdditional Listing
28th Jul 20098:46 amRNSWest Medvezhye Project Update
24th Jul 20097:00 amRNSCompletion of Placing, Issue of New Shares
20th Jul 200910:15 amRNSProject Update
16th Jul 20097:00 amRNSHoldings in Company
15th Jul 20099:50 amRNSLetter to Shareholders
13th Jul 20091:38 pmRNSResult of EGM
9th Jul 20097:00 amRNSDrilling Contracts and Funding Package
29th Jun 20092:43 pmRNSHolding(s) in Company
19th Jun 20099:41 amRNSHolding(s) in Company
17th Jun 20097:00 amRNSFunding Package and EGM
12th Jun 20092:40 pmRNSResponse to press speculation
12th Jun 200912:35 pmRNSAdditional Listing
3rd Jun 20097:00 amRNSPassive Seismic Survey
27th May 200910:49 amRNSAdditional Listing
12th May 20097:00 amRNSAdditional Listing & Amendment to Shareholder Loan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.