Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Batch Drilling of Two Wells Underway, Cameroon

28 Nov 2016 07:00

RNS Number : 2359Q
Victoria Oil & Gas PLC
28 November 2016
 

 

 

28 November 2016

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

 

Batch Drilling of Two Wells Underway, Cameroon

 

Gaz du Cameroun S.A. (GDC), the Company's Cameroon gas producing and distributing subsidiary, announces that following spudding of well La-107 on November 1 2016, it has successfully drilled, cased and cemented the uppermost, 18⅝" section of the well to a depth of 400 metres. Operations on La-107 were then suspended as planned and the rig was skidded a distance of 10 metres along the rail system to the La-108 well location. The 1500 HP Komako 1 drilling rig, owned and operated by Savannah Oil Services Cameroon S.A., is a rail-mounted drilling rig and can skid between the two wells in a matter of hours.

 

Well La-108 was spudded on the 12th November 2016 and has been drilled and cased to a depth of 400 metres. Currently, Savannah is drilling the 17½" hole section on La-108, after which the rig will be skidded back to the La-107 well to drill its 17½" hole section.

 

The gas bearing target horizons, from which it is anticipated both new wells will produce, are in the Upper Cretaceous (Campanian and Santonian) Logbaba Formation, which is a thick sequence of interbedded sands and shales found at depths between 1,700m and 3,200m below the surface.

 

Rig Skidding and Batch Drilling

 

The 2016/17 drilling campaign at Logbaba is designed as a 'batch drilling' operation. As a well is drilled, the equipment, drilling fluids, drilling services and specialist personnel required vary for each hole section. In a batch drilling operation, the rig is moved back and forth between the wells, progressing through all the hole sections until the wells have reached target depth. The Komako 1 rail mounted drilling rig is designed for this type of operation.

 

Significant cost saving and efficiencies are realised from a batch drilling programme, as materials and services are mobilised to the site, employed on both wells for each hole section and then demobilised when no longer required. In a conventional back-to-back two well drilling campaign the equipment and materials are all mobilised as required for the first well and then all equipment remains on standby rental until it is required again on the second well, three or four months later. With batch drilling the Company avoids having significant amounts of equipment and services on standby for 3 or 4 months between wells.

 

This announcement contains inside information.

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Kevin Foo/Laurence Read Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited

Rory Murphy / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy / Toby Gibbs (corporate finance) Tel: +44 (0) 207 408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright/David van Erp Tel: +44 (0) 207 448 0200

 

Bell Pottinger

Daniel Thöle / Charles Stewart / Zara de Belder Tel: +44 (0) 20 3 772 2499

 

Notes to Editors

 

About Victoria Oil & Gas Plc

 

Victoria Oil & Gas (VOG.L) is a gas producing and distributing company.

 

The Company's subsidiary, Gaz du Cameroun S.A. ("GDC") owns a 60% participating interest and operates the onshore Logbaba Gas Project. The Logbaba Gas Project supplies cost effective, clean and reliable natural gas to industries in the Douala region of Cameroon. RSM Production Corporation, an affiliate of Grynberg Petroleum Company of Denver, Colorado holds the remaining 40% participating interest. In addition, VOG has recently been assigned a 75% participating interest in the Matanda block, which neighbours the Logbaba block. The remaining 25% participating interest is held by AFEX.

 

VOG also holds 100% of the West Medvezhye oil and gas exploration project near Nadym, Russia. Given the challenging economic environment in Russia, the Group has fully impaired the West Medvezhye assets.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIALTLDFIR
Date   Source Headline
14th Jul 20177:00 amRNSDirector/PDMR Shareholding
10th Jul 20177:00 amRNSDirector/PDMR Shareholding
4th Jul 20177:00 amRNSUpdate on Logbaba Participation Agreement & Bomono
28th Jun 20171:45 pmRNSResult of Annual General Meeting
28th Jun 20177:00 amRNSLogbaba Drilling Update
26th Jun 20177:00 amRNSENEO Gas Supply Extension, Douala Cameroon
21st Jun 20177:00 amRNSUpdate re significant shareholder
8th Jun 20177:01 amRNSPDMR Shareholding & Deferred Shares Bonus Awards
8th Jun 20177:00 amRNSIssue of Shares in Lieu of Bonus
5th Jun 20177:00 amRNSAnnual Report & Accounts for year-ended 31 Dec 16
26th May 20177:00 amRNSPreliminary Results for the year ended 31 Dec 2016
27th Apr 20177:00 amRNSUpdate on ENEO Contract Renewal
18th Apr 20175:00 pmRNSHolding(s) in Company
18th Apr 20174:58 pmRNSHolding(s) in Company
18th Apr 201711:52 amRNSHolding(s) in Company
13th Apr 20177:00 amRNSQ1 2017 Operations Update
15th Mar 201711:30 amRNSBowleven General Meeting Result
6th Mar 20177:00 amRNSBomono farm-out agreed between BLVN and VOG
3rd Feb 20177:00 amRNSQ4 2016 Operations Update
23rd Dec 20167:00 amRNSCustomer Connections and Drilling Update, Cameroon
22nd Dec 20165:23 pmRNSHolding(s) in Company
20th Dec 201610:05 amRNSDirector/PDMR Dealing
28th Nov 20167:00 amRNSBatch Drilling of Two Wells Underway, Cameroon
2nd Nov 20167:00 amRNSLogbaba Development Wells Spudded
27th Oct 20167:00 amRNSQ3 2016 Operations Update
26th Sep 20167:00 amRNSInterim Financial Report
8th Sep 20167:00 amRNSReserve Bonus and Contingent Payment Extinguished
26th Aug 20167:00 amRNSRSM and VOG Arbitration
18th Aug 20167:13 amRNSLogbaba Field Reserves Report
8th Aug 20167:00 amRNSAppointment of Joint Broker
26th Jul 20167:00 amRNSQ2 2016 Operations Update
14th Jul 20167:00 amRNSDirectorate Changes
29th Jun 20162:15 pmRNSResult of AGM
29th Jun 20167:00 amRNSDrilling Rig Arrival at Douala Port, Cameroon
23rd Jun 20167:00 amRNSAppointment of Group Chief Executive Officer
7th Jun 20167:00 amRNSReport and Accounts to 31 December 2015
31st May 20167:00 amRNSDirectorate Changes
31st May 20167:00 amRNSFinal Results
28th Apr 20165:20 pmRNSUK Investor Show Attendance, London
22nd Apr 20167:00 amRNSAdoption of Financial Reporting Standard 101
19th Apr 20167:00 amRNSQ1 2016 Operations Update
13th Apr 20167:00 amRNSUS$26m Debt Facility Secured
7th Apr 20167:00 amRNSSecures Approval for 75% interest in Matanda Block
29th Feb 20167:00 amRNSInterim Financial Report
18th Feb 20167:00 amRNSInterest in Matanda Block in Cameroon
28th Jan 20167:00 amRNSOperations Outlook 2016
20th Jan 20167:00 amRNSOperations Update
17th Dec 20157:00 amRNSAppointment of Director
16th Dec 20154:53 pmRNSDirectors' Shareholdings
30th Nov 20152:20 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.