The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Batch Drilling of Two Wells Underway, Cameroon

28 Nov 2016 07:00

RNS Number : 2359Q
Victoria Oil & Gas PLC
28 November 2016
 

 

 

28 November 2016

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

 

Batch Drilling of Two Wells Underway, Cameroon

 

Gaz du Cameroun S.A. (GDC), the Company's Cameroon gas producing and distributing subsidiary, announces that following spudding of well La-107 on November 1 2016, it has successfully drilled, cased and cemented the uppermost, 18⅝" section of the well to a depth of 400 metres. Operations on La-107 were then suspended as planned and the rig was skidded a distance of 10 metres along the rail system to the La-108 well location. The 1500 HP Komako 1 drilling rig, owned and operated by Savannah Oil Services Cameroon S.A., is a rail-mounted drilling rig and can skid between the two wells in a matter of hours.

 

Well La-108 was spudded on the 12th November 2016 and has been drilled and cased to a depth of 400 metres. Currently, Savannah is drilling the 17½" hole section on La-108, after which the rig will be skidded back to the La-107 well to drill its 17½" hole section.

 

The gas bearing target horizons, from which it is anticipated both new wells will produce, are in the Upper Cretaceous (Campanian and Santonian) Logbaba Formation, which is a thick sequence of interbedded sands and shales found at depths between 1,700m and 3,200m below the surface.

 

Rig Skidding and Batch Drilling

 

The 2016/17 drilling campaign at Logbaba is designed as a 'batch drilling' operation. As a well is drilled, the equipment, drilling fluids, drilling services and specialist personnel required vary for each hole section. In a batch drilling operation, the rig is moved back and forth between the wells, progressing through all the hole sections until the wells have reached target depth. The Komako 1 rail mounted drilling rig is designed for this type of operation.

 

Significant cost saving and efficiencies are realised from a batch drilling programme, as materials and services are mobilised to the site, employed on both wells for each hole section and then demobilised when no longer required. In a conventional back-to-back two well drilling campaign the equipment and materials are all mobilised as required for the first well and then all equipment remains on standby rental until it is required again on the second well, three or four months later. With batch drilling the Company avoids having significant amounts of equipment and services on standby for 3 or 4 months between wells.

 

This announcement contains inside information.

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Kevin Foo/Laurence Read Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited

Rory Murphy / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy / Toby Gibbs (corporate finance) Tel: +44 (0) 207 408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright/David van Erp Tel: +44 (0) 207 448 0200

 

Bell Pottinger

Daniel Thöle / Charles Stewart / Zara de Belder Tel: +44 (0) 20 3 772 2499

 

Notes to Editors

 

About Victoria Oil & Gas Plc

 

Victoria Oil & Gas (VOG.L) is a gas producing and distributing company.

 

The Company's subsidiary, Gaz du Cameroun S.A. ("GDC") owns a 60% participating interest and operates the onshore Logbaba Gas Project. The Logbaba Gas Project supplies cost effective, clean and reliable natural gas to industries in the Douala region of Cameroon. RSM Production Corporation, an affiliate of Grynberg Petroleum Company of Denver, Colorado holds the remaining 40% participating interest. In addition, VOG has recently been assigned a 75% participating interest in the Matanda block, which neighbours the Logbaba block. The remaining 25% participating interest is held by AFEX.

 

VOG also holds 100% of the West Medvezhye oil and gas exploration project near Nadym, Russia. Given the challenging economic environment in Russia, the Group has fully impaired the West Medvezhye assets.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIALTLDFIR
Date   Source Headline
24th Apr 200911:46 amRNSUpdate on Kemerkol Legal Claim
22nd Apr 20094:40 pmRNSSecond Price Monitoring Extn
22nd Apr 20094:40 pmRNSSecond Price Monitoring Extn
22nd Apr 20094:35 pmRNSPrice Monitoring Extension
22nd Apr 20094:35 pmRNSPrice Monitoring Extension
20th Apr 20092:24 pmRNSAdditional Listing and Directors' Share Interests
7th Apr 200911:36 amRNSLetter to Shareholders
2nd Apr 20098:42 amRNSFunding Package
16th Mar 20099:13 amRNSUpdate on Kemerkol Legal Claim
27th Feb 20095:13 pmRNSInterim Results
16th Feb 20094:35 pmRNSPrice Monitoring Extension
10th Feb 20097:00 amRNSOperations Update & Change of Adviser
2nd Jan 20094:40 pmRNSSecond Price Monitoring Extn
2nd Jan 20094:35 pmRNSPrice Monitoring Extension
18th Dec 20085:41 pmRNSHolding(s) in Company
12th Dec 20084:57 pmRNSIssue of Equity
12th Dec 20082:38 pmRNSCourt Sanction
8th Dec 20084:40 pmRNSSecond Price Monitoring Extn
8th Dec 20084:35 pmRNSPrice Monitoring Extension
5th Dec 200811:58 amRNSResults of Court Meeting
5th Dec 20087:00 amRNSResult of AGM
3rd Dec 20084:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20084:35 pmRNSPrice Monitoring Extension
1st Dec 20084:40 pmRNSSecond Price Monitoring Extn
1st Dec 20084:35 pmRNSPrice Monitoring Extension
27th Nov 20084:42 pmRNSSecond Price Monitoring Extn
27th Nov 20084:35 pmRNSPrice Monitoring Extension
26th Nov 20084:43 pmRNSSecond Price Monitoring Extn
26th Nov 20084:38 pmRNSPrice Monitoring Extension
25th Nov 20084:38 pmRNSPrice Monitoring Extension
21st Nov 20084:50 pmRNSSecond Price Monitoring Extn
21st Nov 20084:38 pmRNSPrice Monitoring Extension
20th Nov 20084:43 pmRNSSecond Price Monitoring Extn
20th Nov 20084:39 pmRNSPrice Monitoring Extension
18th Nov 20084:44 pmRNSSecond Price Monitoring Extn
18th Nov 20084:39 pmRNSPrice Monitoring Extension
12th Nov 20087:57 amRNSOffer for Bramlin Limited
12th Nov 20087:01 amRNSOffer for Bramlin Limited
12th Nov 20087:00 amRNSFinal Results
10th Nov 20084:44 pmRNSSecond Price Monitoring Extn
10th Nov 20084:37 pmRNSPrice Monitoring Extension
6th Nov 20084:47 pmRNSSecond Price Monitoring Extn
6th Nov 20084:38 pmRNSPrice Monitoring Extension
5th Nov 20084:43 pmRNSSecond Price Monitoring Extn
5th Nov 20084:37 pmRNSPrice Monitoring Extension
31st Oct 20084:49 pmRNSSecond Price Monitoring Extn
31st Oct 20084:40 pmRNSPrice Monitoring Extension
29th Oct 20084:47 pmRNSSecond Price Monitoring Extn
29th Oct 20084:41 pmRNSPrice Monitoring Extension
28th Oct 20084:44 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.