Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Batch Drilling of Two Wells Underway, Cameroon

28 Nov 2016 07:00

RNS Number : 2359Q
Victoria Oil & Gas PLC
28 November 2016
 

 

 

28 November 2016

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

 

Batch Drilling of Two Wells Underway, Cameroon

 

Gaz du Cameroun S.A. (GDC), the Company's Cameroon gas producing and distributing subsidiary, announces that following spudding of well La-107 on November 1 2016, it has successfully drilled, cased and cemented the uppermost, 18⅝" section of the well to a depth of 400 metres. Operations on La-107 were then suspended as planned and the rig was skidded a distance of 10 metres along the rail system to the La-108 well location. The 1500 HP Komako 1 drilling rig, owned and operated by Savannah Oil Services Cameroon S.A., is a rail-mounted drilling rig and can skid between the two wells in a matter of hours.

 

Well La-108 was spudded on the 12th November 2016 and has been drilled and cased to a depth of 400 metres. Currently, Savannah is drilling the 17½" hole section on La-108, after which the rig will be skidded back to the La-107 well to drill its 17½" hole section.

 

The gas bearing target horizons, from which it is anticipated both new wells will produce, are in the Upper Cretaceous (Campanian and Santonian) Logbaba Formation, which is a thick sequence of interbedded sands and shales found at depths between 1,700m and 3,200m below the surface.

 

Rig Skidding and Batch Drilling

 

The 2016/17 drilling campaign at Logbaba is designed as a 'batch drilling' operation. As a well is drilled, the equipment, drilling fluids, drilling services and specialist personnel required vary for each hole section. In a batch drilling operation, the rig is moved back and forth between the wells, progressing through all the hole sections until the wells have reached target depth. The Komako 1 rail mounted drilling rig is designed for this type of operation.

 

Significant cost saving and efficiencies are realised from a batch drilling programme, as materials and services are mobilised to the site, employed on both wells for each hole section and then demobilised when no longer required. In a conventional back-to-back two well drilling campaign the equipment and materials are all mobilised as required for the first well and then all equipment remains on standby rental until it is required again on the second well, three or four months later. With batch drilling the Company avoids having significant amounts of equipment and services on standby for 3 or 4 months between wells.

 

This announcement contains inside information.

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Kevin Foo/Laurence Read Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited

Rory Murphy / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy / Toby Gibbs (corporate finance) Tel: +44 (0) 207 408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright/David van Erp Tel: +44 (0) 207 448 0200

 

Bell Pottinger

Daniel Thöle / Charles Stewart / Zara de Belder Tel: +44 (0) 20 3 772 2499

 

Notes to Editors

 

About Victoria Oil & Gas Plc

 

Victoria Oil & Gas (VOG.L) is a gas producing and distributing company.

 

The Company's subsidiary, Gaz du Cameroun S.A. ("GDC") owns a 60% participating interest and operates the onshore Logbaba Gas Project. The Logbaba Gas Project supplies cost effective, clean and reliable natural gas to industries in the Douala region of Cameroon. RSM Production Corporation, an affiliate of Grynberg Petroleum Company of Denver, Colorado holds the remaining 40% participating interest. In addition, VOG has recently been assigned a 75% participating interest in the Matanda block, which neighbours the Logbaba block. The remaining 25% participating interest is held by AFEX.

 

VOG also holds 100% of the West Medvezhye oil and gas exploration project near Nadym, Russia. Given the challenging economic environment in Russia, the Group has fully impaired the West Medvezhye assets.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIALTLDFIR
Date   Source Headline
16th Dec 20227:00 amRNSCancellation - Victoria Oil & Gas Plc
27th Oct 20225:30 pmRNSSuspended Companies Notice – Deletions
26th Oct 20227:00 amRNSUpdate on Settlement of The ICC Award to RSM
5th Oct 20229:15 amRNSOperational & Corporate Update
25th Jul 20227:30 amRNSAddendum to ICC Partial Final Award
22nd Jul 20227:00 amRNSQ2 2022 Operational & Corporate Update
30th Jun 20221:45 pmRNSResult of Annual General Meeting
30th Jun 20227:00 amRNSAnnual Report and Accounts & Trading Update
27th Jun 20227:00 amRNSChange of Registered Office
14th Jun 20229:45 amRNSHolding(s) in Company
14th Jun 20229:45 amRNSHolding(s) in Company
31st May 20226:00 pmRNSNotice of AGM
19th May 20227:00 amRNSQ1 2022 Operational & Corporate Update
4th Apr 20227:30 amRNSSuspension - Victoria Oil & Gas plc
4th Apr 20227:00 amRNSTemporary Suspension of Trading
2nd Mar 20227:00 amRNSLoan Note Issue
2nd Feb 20227:00 amRNSQ4 2021 Operational Update
18th Jan 20222:05 pmRNSSecond Price Monitoring Extn
18th Jan 20222:00 pmRNSPrice Monitoring Extension
7th Jan 20222:06 pmRNSSecond Price Monitoring Extn
7th Jan 20222:01 pmRNSPrice Monitoring Extension
7th Jan 202211:06 amRNSSecond Price Monitoring Extn
7th Jan 202211:00 amRNSPrice Monitoring Extension
23rd Dec 20217:00 amRNSMinisterial Approval on Matanda Licence Extension
16th Nov 20214:41 pmRNSSecond Price Monitoring Extn
16th Nov 20214:36 pmRNSPrice Monitoring Extension
16th Nov 20212:05 pmRNSSecond Price Monitoring Extn
16th Nov 20212:00 pmRNSPrice Monitoring Extension
16th Nov 202111:05 amRNSSecond Price Monitoring Extn
16th Nov 202111:00 amRNSPrice Monitoring Extension
16th Nov 20217:00 amRNSUpdate to Logbaba well La-108
1st Nov 20218:42 amRNSReplacement: Interim Results
1st Nov 20217:00 amRNSAnnual Financial Report
1st Oct 202112:00 pmRNSConvertible Loan Note Draw Down
29th Sep 20217:00 amRNSUNCITRAL Arbitration Update
23rd Sep 20212:15 pmRNSInterim Results Extension
10th Sep 20213:22 pmRNSResult of General Meeting
26th Aug 20217:00 amRNSPublication of Circular and Notice of GM
12th Aug 202112:28 pmRNSResult of General Meeting (“GM”)
4th Aug 20217:00 amRNSQ2 2021 Operational Update
16th Jul 20211:02 pmRNSGrant of Options, Issue of Shares and TVR
16th Jul 20217:00 amRNSNotice of General Meeting to receive Annual Report
13th Jul 20212:06 pmRNSSecond Price Monitoring Extn
13th Jul 20212:00 pmRNSPrice Monitoring Extension
13th Jul 202111:05 amRNSSecond Price Monitoring Extn
13th Jul 202111:00 amRNSPrice Monitoring Extension
13th Jul 20217:00 amRNSAudited Results for the year ended 31 Dec 2020
30th Jun 20211:38 pmRNSResult of Annual General Meeting
30th Jun 20217:20 amRNSAnnual Report and Accounts & Trading update
24th Jun 202111:13 amRNSAnnual General Meeting 2021 Update on Arrangements

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.