The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Letter to Shareholders

26 Oct 2009 09:26

RNS Number : 3580B
Victoria Oil & Gas PLC
26 October 2009
 



Victoria Oil & Gas Plc

('VOG' or 'the Company')

(AIM: VOG)

Letter to Shareholders

The following letter to shareholders in the Company has been released today.

"Dear Shareholder,

It is my pleasure to report to you again on the progress of Victoria Oil and Gas (VOG) over the last three monthsDuring this period, the market has shown a great deal of resilience and an improved level of optimism on equity stocks has returned, with resources stocks once again gaining attentionWhile we hope that this trend will continue, our focus remains to achieve revenue generation as soon as possible and develop VOG from aexploration to a development and production company. Then and only then will our true potential receive significant value.

On the back of this positive sentiment, in August we seized the opportunity to raise further £6 million for the early commencement of the design and engineering of the gas processing unit and pipeline for our Logbaba gas project in Douala, Cameroon. The downstream element of the project, key to monetisation of a gas discovery, would typically be financed through debt after a successful well. This financing has allowed us to start preparations in advance of the first well being completed and should save us considerable time between our first successful drilling results and receiving first cash flows.

I also had the pleasure to welcome Austen Titford to the Board of VOG as Executive Director. Austen was our financial controller and has a wealth of experience in the natural resources sector with major companies such as BHP Billiton and LASMO and has worked in countries such as Iran and UzbekistanHis addition will augment the Board's financial and commercial expertise at this important point in VOG's development.

Logbaba, Cameroon

Attention is currently focused on our Logbaba gas project in Cameroon after the first new appraisal well, 105, was spudded on schedule at the end of August. The well, which is being drilled from our prepared site on the location of the old Well 104, will have a total depth of 10,000 feet (around 3,000 metres) and be deviated to twin Well 103, drilled by Elf in the 1950s. Well 103, which was drilled to a total depth of just over 9,000 feet, tested gas from the Campanian sands at almost 40 million cubic feet per day with no gas-water contact encountered. We are hoping for similar flows from Well 105.

We have successfully set 13 3/8 inch casing to a depth of around 4,250 feet and, in anticipation of an increase in pressure, have installed and tested a 10,000 psi blow-out preventer. Each of the wells drilled in the 1950s intersected high-pressured gas-bearing sands from depths of 5,500 feet and below and so as we drill the 12 ¼ inch hole section we are entering into the truly prospective zonesAs is usual for a new and untested drilling rig, there have been teething problems, but these have been remedied and we expect smooth progress through the rest of the well.

In event that we have a successful well, we will proceed immediately with testing while the rig is moved a short distance of 10 metres for spudding of the next well. The results of the well test will also be circulated to RPS Energy for a revision of their reserve estimate, which currently assigns 2P reserves of more than 100 billion cubic feet of gas to Logbaba. 

Due to our recent financing we have been able to commence work on the FEED (Front-End Engineering and Design) study for the gas processing facility and the 15 kilometre pipeline to carry the gas to our industrial clients, some of whom have already purchased the equipment necessary to convert their burners from liquid fuels to natural gas. Engineering consultants have been engaged to begin the work with our aim to produce a complete design package before the end of this year.

As well as stimulating the economic advancement of the country through the provision of cheaper energy to the industrial market, an initiative to grow Cameroon's power generation capacity has become a firm priority. In July, a $160 million deal was agreed between the State Electricity Company and Hyundai Engineering & Construction for a new 230 megawatt gas-fired power station to be located in Logbaba, with installation targeted by September 2010. Given that our Logbaba field is the only onshore gas discovery in the country, VOG is uniquely positioned to benefit from such a huge project. 

We have also submitted our own proposals for a much smaller-scale power plant to be located adjacent to our current drilling location, which could be capable of generating up to around 75 megawatts for transmission into the local grid. VOG would not operate this plant, but we have proposed to the Government that we can assist in its installation and provide the gas feedstock.

West Medvezhye, Russia (West Med)

The subsurface evaluation work at West Med continues to pay dividends. In August, the Russian Ministry of Natural Resources confirmed and approved the findings of local geological institute SibNats. As part of their study from the reinterpretation of the 2D seismic and drilling results from Well 103, SibNats have identified more than 30 potential hydrocarbon-bearing structures within the West Med licence area. Furthermore, SibNats calculated Russian category C3 resources for just three of the structures at over 170 million barrels of oil equivalent, including half a trillion cubic feet of gas. It should be stressed that these results are not based on the same methodology as the independent evaluation performed by DeGolyer and MacNaughton in August 2006, which calculated gross prospective resources for West Med of over 1.1 billion barrels of oil equivalent, including five trillion cubic feet of gas.

Our plan remains to continue with the exploration work to define as much of the subsurface as possible before we decide our next drilling locations. As well as the second passive seismic survey, which we are preparing to commission in the coming winter, we are also considering a further geochemical study to give us even more information. Both of these studies will be undertaken over a large part of the eastern section of the licence block, where our field rises up to join Gazprom's super-giant Medvezhye field. There is a good chance that part of the Medvezhye structure extends into our licence and stratigraphic traps may exist where the fields join.

Kemerkol, Kazakhstan

We continue to fight our corner in the Kazakhstan legal system on this project but its importance in the day to day business of VOG is minimal. We will continue to seek solutions within economic and legal limits.

Outlook

The next few months will be dominated by the results of the drilling in Cameroon and I look forward to sharing these with you as they become available. The drilling of Wells 105 and 106 is just the start of a process, which we hope will lead us to a significant revenue generation within 12 months of spudding. However, this will not distract us from the important activities on West Med or diminish our appetite for new projects to add further value to our Company.

Kevin Foo

Chairman"

A copy of this letter is available on the Company's website at www.victoriaoilandgas.com 

For further information, please contact:

Victoria Oil & Gas Plc

Tel: +44 (0) 20 7921 8820 

George Donne / Kevin Foo 

Strand Hanson Limited 

Tel: +44 (0) 20 7409 3494

Simon Raggett / Angela Peace

Fox-Davies Capital

Tel: +44 (0) 20 7936 5220

Daniel Fox-Davies / Oliver Stansfield

Conduit PR 

Tel: +44 (0) 20 7429 6607 

Jonathan Charles / Ed Portman 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMFBLTMMTTMIL
Date   Source Headline
16th Dec 20227:00 amRNSCancellation - Victoria Oil & Gas Plc
27th Oct 20225:30 pmRNSSuspended Companies Notice – Deletions
26th Oct 20227:00 amRNSUpdate on Settlement of The ICC Award to RSM
5th Oct 20229:15 amRNSOperational & Corporate Update
25th Jul 20227:30 amRNSAddendum to ICC Partial Final Award
22nd Jul 20227:00 amRNSQ2 2022 Operational & Corporate Update
30th Jun 20221:45 pmRNSResult of Annual General Meeting
30th Jun 20227:00 amRNSAnnual Report and Accounts & Trading Update
27th Jun 20227:00 amRNSChange of Registered Office
14th Jun 20229:45 amRNSHolding(s) in Company
14th Jun 20229:45 amRNSHolding(s) in Company
31st May 20226:00 pmRNSNotice of AGM
19th May 20227:00 amRNSQ1 2022 Operational & Corporate Update
4th Apr 20227:30 amRNSSuspension - Victoria Oil & Gas plc
4th Apr 20227:00 amRNSTemporary Suspension of Trading
2nd Mar 20227:00 amRNSLoan Note Issue
2nd Feb 20227:00 amRNSQ4 2021 Operational Update
18th Jan 20222:05 pmRNSSecond Price Monitoring Extn
18th Jan 20222:00 pmRNSPrice Monitoring Extension
7th Jan 20222:06 pmRNSSecond Price Monitoring Extn
7th Jan 20222:01 pmRNSPrice Monitoring Extension
7th Jan 202211:06 amRNSSecond Price Monitoring Extn
7th Jan 202211:00 amRNSPrice Monitoring Extension
23rd Dec 20217:00 amRNSMinisterial Approval on Matanda Licence Extension
16th Nov 20214:41 pmRNSSecond Price Monitoring Extn
16th Nov 20214:36 pmRNSPrice Monitoring Extension
16th Nov 20212:05 pmRNSSecond Price Monitoring Extn
16th Nov 20212:00 pmRNSPrice Monitoring Extension
16th Nov 202111:05 amRNSSecond Price Monitoring Extn
16th Nov 202111:00 amRNSPrice Monitoring Extension
16th Nov 20217:00 amRNSUpdate to Logbaba well La-108
1st Nov 20218:42 amRNSReplacement: Interim Results
1st Nov 20217:00 amRNSAnnual Financial Report
1st Oct 202112:00 pmRNSConvertible Loan Note Draw Down
29th Sep 20217:00 amRNSUNCITRAL Arbitration Update
23rd Sep 20212:15 pmRNSInterim Results Extension
10th Sep 20213:22 pmRNSResult of General Meeting
26th Aug 20217:00 amRNSPublication of Circular and Notice of GM
12th Aug 202112:28 pmRNSResult of General Meeting (“GM”)
4th Aug 20217:00 amRNSQ2 2021 Operational Update
16th Jul 20211:02 pmRNSGrant of Options, Issue of Shares and TVR
16th Jul 20217:00 amRNSNotice of General Meeting to receive Annual Report
13th Jul 20212:06 pmRNSSecond Price Monitoring Extn
13th Jul 20212:00 pmRNSPrice Monitoring Extension
13th Jul 202111:05 amRNSSecond Price Monitoring Extn
13th Jul 202111:00 amRNSPrice Monitoring Extension
13th Jul 20217:00 amRNSAudited Results for the year ended 31 Dec 2020
30th Jun 20211:38 pmRNSResult of Annual General Meeting
30th Jun 20217:20 amRNSAnnual Report and Accounts & Trading update
24th Jun 202111:13 amRNSAnnual General Meeting 2021 Update on Arrangements

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.