The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update to Logbaba well La-108

16 Nov 2021 07:00

RNS Number : 4553S
Victoria Oil & Gas PLC
16 November 2021
 

 

16 November 2021

Victoria Oil & Gas Plc

("VOG" or the "Company")

 

Additional Perforations added to the Upper Logbaba Formation in Well La-108

 

Victoria Oil & Gas Plc, whose wholly owned subsidiary, Gaz du Cameroun S.A. ("GDC"), is the onshore gas producer and distributor with operations located in the port city of Douala, Cameroon, is pleased to provide an update on Logbaba well La-108.

 

· Perforations have been successfully added to well La-108 safely and under budget

 

· As a result, an additional 42m of net pay has been added in the Upper Logbaba Formation in the well

 

· In the first few days of production, the well has supplied up to 5.7 MMscf/d of production (all that has been needed), with a flowing wellhead pressure of over 200 barg (a unit of pressure)

 

Additional perforations have been successfully added to well La-108, with operations carried out safely and under budget, despite several periods of thunderstorms with nearby lightening strikes, during which operations were suspended. Because of the depth and pressure difference between the upper and lower sands of the Logbaba Formation, it is traditional to perforate the Logbaba wells in two or more stages to avoid excessive differential pressures in the wellbore. A further 42m of net pay has been added in the Upper Logbaba Formation in well La-108 as a result of the recent perforations, adding to the 30m of net pay that was perforated in November 2020 and put on production in February, 2021.

 

Well La-108 was shut in on 9 June 2021 to perform a pressure build-up ("PBU"), and the shut--in wellhead pressure ("SIWHP") had built up to 229 barg at the commencement of the perforating operation, and indeed was continuing to build up. This compares to an initial SIWHP of 177 barg on 10 June, a day after the well was shut in for the PBU.

The perforating operations were performed using a managed underbalance system to provide optimal downhole conditions on reservoirs with pressures up to 350 barg and was performed without a drilling rig using electric wireline and through-tubing perforating guns. The whole project was completed in 6 days and has come in some 38% under budget.

Well La-108 was returned to production on 5 November, and is being used to meet the majority of demand for the time being, so that we can observe the well's performance. In the first few days of production, the well has supplied up to 5.7 MMscf/d of production (all that has been needed), with a flowing wellhead pressure of over 200 barg, and little or no water production (as expected). For comparison, recent flowing wellhead pressures for wells La-105 and La-107 were in the range 21 to 46 barg, depending on flowrate.

The gas currently being produced from well La-108 has a Calorific Value (CV) that is about 4% higher than the Logbaba Field average, and the condensate is slightly lighter than the field average. In the short-term we expect that only these new upper perforations will flow until there is pressure equalisation with the lower perforations. It will take some time to acquire sufficient data to determine how the well will perform over the long term, and we will provide further updates when we have a better understanding of the reservoir as a whole.

 

Roy Kelly, CEO of VOG said:

"I am absolutely delighted with this result, delivered safely and efficiently by our excellent team of staff and contractors, which included a local oilfield services company providing the wireline services. We saved time, money and any environmental risks by omitting any testing to flare, and the well was handed over to the production department straight after the perforating phase.

 

Only now do we have all sands in the development wells perforated, which will eventually allow us to gain a clearer understanding of deliverability and reserves from the current well stock. This takes time but is necessary to ensure we get supply-side forecasts right going forward; as we have seen, there is huge variability in the performance of the wells."

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Roy Kelly / Rob Collins Tel: +44 (0) 20 7921 8820

Strand Hanson Limited (Nominated and Financial Adviser)

Rory Murphy / James Dance Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Broker)

Mark Percy / Toby Gibbs (corporate advisory) Tel: +44 (0) 20 7408 4090

Jerry Keen (corporate broking)

 

Sam Metcalfe, the Company's Subsurface Manager has reviewed and approved the technical information contained in this announcement in his capacity as a qualified person under the AIM Rules. Sam has over 30 years of industry experience, and has an MSc in Petroleum Engineering from The University of Texas at Austin.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLGPGPWGUPGPUA
Date   Source Headline
16th Dec 20227:00 amRNSCancellation - Victoria Oil & Gas Plc
27th Oct 20225:30 pmRNSSuspended Companies Notice – Deletions
26th Oct 20227:00 amRNSUpdate on Settlement of The ICC Award to RSM
5th Oct 20229:15 amRNSOperational & Corporate Update
25th Jul 20227:30 amRNSAddendum to ICC Partial Final Award
22nd Jul 20227:00 amRNSQ2 2022 Operational & Corporate Update
30th Jun 20221:45 pmRNSResult of Annual General Meeting
30th Jun 20227:00 amRNSAnnual Report and Accounts & Trading Update
27th Jun 20227:00 amRNSChange of Registered Office
14th Jun 20229:45 amRNSHolding(s) in Company
14th Jun 20229:45 amRNSHolding(s) in Company
31st May 20226:00 pmRNSNotice of AGM
19th May 20227:00 amRNSQ1 2022 Operational & Corporate Update
4th Apr 20227:30 amRNSSuspension - Victoria Oil & Gas plc
4th Apr 20227:00 amRNSTemporary Suspension of Trading
2nd Mar 20227:00 amRNSLoan Note Issue
2nd Feb 20227:00 amRNSQ4 2021 Operational Update
18th Jan 20222:05 pmRNSSecond Price Monitoring Extn
18th Jan 20222:00 pmRNSPrice Monitoring Extension
7th Jan 20222:06 pmRNSSecond Price Monitoring Extn
7th Jan 20222:01 pmRNSPrice Monitoring Extension
7th Jan 202211:06 amRNSSecond Price Monitoring Extn
7th Jan 202211:00 amRNSPrice Monitoring Extension
23rd Dec 20217:00 amRNSMinisterial Approval on Matanda Licence Extension
16th Nov 20214:41 pmRNSSecond Price Monitoring Extn
16th Nov 20214:36 pmRNSPrice Monitoring Extension
16th Nov 20212:05 pmRNSSecond Price Monitoring Extn
16th Nov 20212:00 pmRNSPrice Monitoring Extension
16th Nov 202111:05 amRNSSecond Price Monitoring Extn
16th Nov 202111:00 amRNSPrice Monitoring Extension
16th Nov 20217:00 amRNSUpdate to Logbaba well La-108
1st Nov 20218:42 amRNSReplacement: Interim Results
1st Nov 20217:00 amRNSAnnual Financial Report
1st Oct 202112:00 pmRNSConvertible Loan Note Draw Down
29th Sep 20217:00 amRNSUNCITRAL Arbitration Update
23rd Sep 20212:15 pmRNSInterim Results Extension
10th Sep 20213:22 pmRNSResult of General Meeting
26th Aug 20217:00 amRNSPublication of Circular and Notice of GM
12th Aug 202112:28 pmRNSResult of General Meeting (“GM”)
4th Aug 20217:00 amRNSQ2 2021 Operational Update
16th Jul 20211:02 pmRNSGrant of Options, Issue of Shares and TVR
16th Jul 20217:00 amRNSNotice of General Meeting to receive Annual Report
13th Jul 20212:06 pmRNSSecond Price Monitoring Extn
13th Jul 20212:00 pmRNSPrice Monitoring Extension
13th Jul 202111:05 amRNSSecond Price Monitoring Extn
13th Jul 202111:00 amRNSPrice Monitoring Extension
13th Jul 20217:00 amRNSAudited Results for the year ended 31 Dec 2020
30th Jun 20211:38 pmRNSResult of Annual General Meeting
30th Jun 20217:20 amRNSAnnual Report and Accounts & Trading update
24th Jun 202111:13 amRNSAnnual General Meeting 2021 Update on Arrangements

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.