Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update to Logbaba well La-108

16 Nov 2021 07:00

RNS Number : 4553S
Victoria Oil & Gas PLC
16 November 2021
 

 

16 November 2021

Victoria Oil & Gas Plc

("VOG" or the "Company")

 

Additional Perforations added to the Upper Logbaba Formation in Well La-108

 

Victoria Oil & Gas Plc, whose wholly owned subsidiary, Gaz du Cameroun S.A. ("GDC"), is the onshore gas producer and distributor with operations located in the port city of Douala, Cameroon, is pleased to provide an update on Logbaba well La-108.

 

· Perforations have been successfully added to well La-108 safely and under budget

 

· As a result, an additional 42m of net pay has been added in the Upper Logbaba Formation in the well

 

· In the first few days of production, the well has supplied up to 5.7 MMscf/d of production (all that has been needed), with a flowing wellhead pressure of over 200 barg (a unit of pressure)

 

Additional perforations have been successfully added to well La-108, with operations carried out safely and under budget, despite several periods of thunderstorms with nearby lightening strikes, during which operations were suspended. Because of the depth and pressure difference between the upper and lower sands of the Logbaba Formation, it is traditional to perforate the Logbaba wells in two or more stages to avoid excessive differential pressures in the wellbore. A further 42m of net pay has been added in the Upper Logbaba Formation in well La-108 as a result of the recent perforations, adding to the 30m of net pay that was perforated in November 2020 and put on production in February, 2021.

 

Well La-108 was shut in on 9 June 2021 to perform a pressure build-up ("PBU"), and the shut--in wellhead pressure ("SIWHP") had built up to 229 barg at the commencement of the perforating operation, and indeed was continuing to build up. This compares to an initial SIWHP of 177 barg on 10 June, a day after the well was shut in for the PBU.

The perforating operations were performed using a managed underbalance system to provide optimal downhole conditions on reservoirs with pressures up to 350 barg and was performed without a drilling rig using electric wireline and through-tubing perforating guns. The whole project was completed in 6 days and has come in some 38% under budget.

Well La-108 was returned to production on 5 November, and is being used to meet the majority of demand for the time being, so that we can observe the well's performance. In the first few days of production, the well has supplied up to 5.7 MMscf/d of production (all that has been needed), with a flowing wellhead pressure of over 200 barg, and little or no water production (as expected). For comparison, recent flowing wellhead pressures for wells La-105 and La-107 were in the range 21 to 46 barg, depending on flowrate.

The gas currently being produced from well La-108 has a Calorific Value (CV) that is about 4% higher than the Logbaba Field average, and the condensate is slightly lighter than the field average. In the short-term we expect that only these new upper perforations will flow until there is pressure equalisation with the lower perforations. It will take some time to acquire sufficient data to determine how the well will perform over the long term, and we will provide further updates when we have a better understanding of the reservoir as a whole.

 

Roy Kelly, CEO of VOG said:

"I am absolutely delighted with this result, delivered safely and efficiently by our excellent team of staff and contractors, which included a local oilfield services company providing the wireline services. We saved time, money and any environmental risks by omitting any testing to flare, and the well was handed over to the production department straight after the perforating phase.

 

Only now do we have all sands in the development wells perforated, which will eventually allow us to gain a clearer understanding of deliverability and reserves from the current well stock. This takes time but is necessary to ensure we get supply-side forecasts right going forward; as we have seen, there is huge variability in the performance of the wells."

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Roy Kelly / Rob Collins Tel: +44 (0) 20 7921 8820

Strand Hanson Limited (Nominated and Financial Adviser)

Rory Murphy / James Dance Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Broker)

Mark Percy / Toby Gibbs (corporate advisory) Tel: +44 (0) 20 7408 4090

Jerry Keen (corporate broking)

 

Sam Metcalfe, the Company's Subsurface Manager has reviewed and approved the technical information contained in this announcement in his capacity as a qualified person under the AIM Rules. Sam has over 30 years of industry experience, and has an MSc in Petroleum Engineering from The University of Texas at Austin.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLGPGPWGUPGPUA
Date   Source Headline
25th Jan 201912:15 pmRNSChange of Registered Office Address
21st Jan 20197:00 amRNSProduction Update
17th Jan 20197:00 amRNSQ4 2018 Operations Update
2nd Jan 20197:00 amRNSPresidential Decree on Matanda Received
24th Dec 20187:00 amRNSRenewal of Long-Term Gas Supply Contract with ENEO
22nd Oct 20187:00 amRNSOperations Update & Non-Grid Business Developments
28th Sep 201812:00 pmRNSHalf-year Report
22nd Aug 201812:00 pmRNSHolding(s) in Company
22nd Aug 201812:00 pmRNSHolding(s) in Company
17th Aug 20187:00 amRNSQ2 2018 Operations Update
7th Aug 20181:23 pmRNSResult of General Meeting
2nd Aug 201810:41 amRNSHolding(s) in Company
10th Jul 20185:19 pmRNSNotice of GM
5th Jul 201811:00 amRNSIssue of Shares
28th Jun 20181:00 pmRNSResult of AGM
26th Jun 20187:00 amRNSAgreement on Exclusive CNG partnership
22nd Jun 20182:00 pmRNSAnnual Report & Accounts to 31 December 2017
22nd Jun 20187:00 amRNSPreliminary Results for the year ended 31 Dec 2017
14th Jun 20187:00 amRNSRestructure of the BGFI Debt Facility
5th Jun 201811:00 amRNSAIM Rule 17 Disclosure Schedule Two (g) Update
4th Jun 20187:00 amRNSNotice of AGM
4th Jun 20187:00 amRNSLogbaba Field Reserves Update
24th May 20187:00 amRNSQ1 2018 Operations and Outlook
3rd May 20181:30 pmRNSHolding(s) in Company
24th Apr 20187:00 amRNSNon-Executive Director Resignation
11th Apr 20184:40 pmRNSSecond Price Monitoring Extn
11th Apr 20184:35 pmRNSPrice Monitoring Extension
16th Feb 201812:00 pmRNSQ4 17 Operations Update & 2018 Outlook Replacement
16th Feb 20187:00 amRNSQ4 2017 Operations Update and 2018 Outlook
15th Jan 20187:00 amRNSHolding(s) in Company
5th Jan 20184:40 pmRNSSecond Price Monitoring Extn
5th Jan 20184:35 pmRNSPrice Monitoring Extension
5th Jan 20184:31 pmRNSGas Supply Contract with ENEO Not Extended
2nd Jan 20187:00 amRNSBomono Farm Out Extension
21st Dec 20177:00 amRNSYear End Customer Supply Update 2017
20th Dec 20177:00 amRNSLogbaba Drilling Update - La-108
1st Dec 20177:00 amRNSLogbaba Drilling Update - La-108 Well Completion
15th Nov 20177:00 amRNSDirector Subscription & PDMR Shareholdings
13th Nov 201711:50 amRNSResult of General Meeting ("GM")
8th Nov 20177:00 amRNSLogbaba Update - La-108 Reaches Target Depth
26th Oct 20177:00 amRNSPosting of Circular and Details of Open Offer
25th Oct 20173:30 pmRNSResults of Placing and Subscription
25th Oct 20177:00 amRNSProposed Placing, Subscription and Open Offer
28th Sep 20177:01 amRNSInterim Financial Report
28th Sep 20177:00 amRNSBomono Farm-out Extension
26th Sep 20177:00 amRNSSuccessful Flow Tests & First Production Gas
20th Sep 201711:00 amRNSHolding(s) in Company
17th Aug 20177:00 amRNSLogbaba Drilling Update
31st Jul 20177:00 amRNSQ2 2017 Operations Update
31st Jul 20177:00 amRNSConfirmation of Reduction of Capital

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.