Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUK Oil & Gas Regulatory News (UKOG)

Share Price Information for UK Oil & Gas (UKOG)

Share Price is delayed by 15 minutes
Get Live Data
0.0105    0.00 (0.00%)
Bid:
0.01
Ask:
0.011
Spread: 0.001 (10.00%)
Market Cap: £3.05m
UKOG Live PriceLast checked at - London Stock Exchange

Intraday UK Oil & Gas Share Chart

Update - Horse Hill

8 Sep 2017 07:00

RNS Number : 2017Q
UK Oil & Gas Investments PLC
08 September 2017
 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Flow Testing, Oil Storage and Further Drilling Permits Granted by Environment Agency ,

Horse Hill Oil Discovery, Weald Basin, UK

 

UK Oil & Gas Investments PLC (London AIM and ISDX: UKOG) is pleased to announce that it has been informed by Horse Hill Developments Limited ("HHDL") the operator of Horse Hill Licences PEDL 137 and PEDL 246, containing the Horse Hill-1 ("HH-1") oil discovery, that the Environment Agency has granted the necessary permits to enable HHDL to carry out extended flow tests at HH-1, store any produced oil, drill and test both a side-track from the existing HH-1 well and new borehole HH-2. The Company has a 32.435% interest in the Licences.

 

As previously reported, an application for long term production testing and further appraisal drilling was submitted to Surrey County Council in October 2016 and is now confirmed to be decided at the Council's planning committee meeting on October 18th, 2017. Members of the planning committee completed a scheduled visit to the Horse Hill site yesterday, 7 September, in preparation for the October meeting.

 

The Company therefore envisages that these operations will commence in the fourth quarter of 2017 upon grant of the necessary remaining regulatory permissions.

 

HH-1 Oil Discovery (UKOG interest 32.435%)

 

The HH-1 Kimmeridge Limestone and Portland oil discovery well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin, 3 km north of Gatwick Airport. As previously reported in February and March 2016, two naturally-fractured limestone members within the Kimmeridge section, known as KL3 and KL4, flowed dry, 40-degree API oil, at an aggregate stabilised natural flow rate of 1,365 barrels per day ("bopd") with no clear indication of depletion.

The overlying Portland flowed dry, 35-degree API gravity oil at a stable pumped rate of 323 bopd. The Portland oil was produced at the rod-pump's maximum achievable rate and thus flow was constrained by the pump's mechanical capacity.

Stephen Sanderson, UKOG's Executive Chairman, commented:

"We look forward to a successful planning outcome and the resumption of operations at Horse Hill."

Qualified Person's Statement

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

UK Oil & Gas Investments PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Bavister Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Nick Tulloch / Neil McDonald Tel: 0131 220 6939

 

BPA Media/Square 1 Consulting (Public Relations)

Brian Alexander / David Bick Tel: 01483 243450

 

 Glossary:

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

naturally fractured reservoir

a fractured reservoir contains open and usually connected cracks or fissures within the rock matrix; fractures can enhance permeability of rocks greatly by connecting pore-spaces together; naturally fractured reservoirs have been created over geological time by nature, not man-made via hydraulic fracturing

sidetrack

re-entry of a well from the well's surface location with drilling equipment for the purpose of deviating from the existing well bore to achieve production or well data from an alternative zone or bottom hole location, or to remedy an engineering problem encountered in the existing well bore

 

UKOG Licence Interests

 

The Company has interests in the following ten UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Appraisal/development well planned; licence extended to 2018

Broadford Bridge 3

PEDL234

100%

Kimmeridge Oil & Gas Limited 4

Kimmeridge Oil & Gas Limited 4

300.0

BB-1 flow testing underway

Holmwood 3

PEDL143

30%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Holmwood-1 exploration well planned in 2017/18

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

32.435%

Horse Hill Developments Ltd ⁶

Horse Hill Developments Ltd ⁶

99.3

Submitted planning application for long term production tests and drilling of two wells

Horse Hill 5

PEDL246

32.435%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Offshore) 3

P1916

100%

UKOG Solent Limited

UKOG Solent Limited

46.7

Preparing drilling planning submission

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

TBA

200.0

Preparing drilling planning submission

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Submitted planning application for appraisal and field development

 

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. Contains the extension of the Godley Bridge Portland gas discovery and the site of the Broadford Bridge-1 and 1z well.

4. UKOG has a 100% interest in Kimmeridge Oil & Gas Limited, which has a 100% interest in PEDL234.

5. Oil discovery with recently completed flow testing.

6. UKOG has a direct 49.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEASNPESSXEEF
Date   Source Headline
16th Jan 20197:00 amRNSKimmeridge Oil Production Continues at HH-1
12th Dec 20187:00 amRNSAcquisition of Interest in Arreton Oil Discovery
15th Nov 20187:00 amRNSEWT Update, Portland & Kimmeridge Oil Discovery
18th Oct 20187:00 amRNSPortland Declared Commercially Viable
15th Oct 201811:35 amRNSHolding(s) in Company
10th Oct 20181:55 pmRNSEWT Update: Horse Hill-1
8th Oct 20189:57 amRNSHolding(s) in Company
8th Oct 20189:55 amRNSHolding(s) in Company
5th Oct 201811:30 amRNSExtended Well Test and Regulatory Update
25th Sep 20187:00 amRNSCompletion of Disposal of Interest in HHDL to UKOG
25th Sep 20187:00 amRNSCompletion of Disposal of Interest in HHDL to UKOG
25th Sep 20187:00 amRNSCompletion of Further Interest in HHDL
11th Sep 20184:24 pmRNS18-month Planning Extension Approved
10th Sep 201812:30 pmRNSEWT Updates, Portland & Kimmeridge Oil Discovery
6th Sep 20186:03 pmRNSExercise of Warrants
4th Sep 201811:22 amRNSUpdate - Holmwood Licence (PEDL 143)
3rd Sep 201812:24 pmRNSHigh Court Grants Interim Injunction
30th Aug 20187:00 amRNSAcquisition of Further Interest in Horse Hill
29th Aug 20189:05 amRNSSecond Price Monitoring Extn
29th Aug 20189:00 amRNSPrice Monitoring Extension
24th Aug 20184:40 pmRNSSecond Price Monitoring Extn
24th Aug 20184:35 pmRNSPrice Monitoring Extension
20th Aug 20187:00 amRNSAcquisition of Further Interest in HHDL
13th Aug 20182:00 pmRNSExercise of Warrants
3rd Aug 201811:30 amRNSPortland high-rate flow test successfully complete
31st Jul 20182:00 pmRNSSchedule 1 Update - UK Oil & Gas Plc
31st Jul 201812:34 pmRNSResult of General Meeting
18th Jul 20182:00 pmRNSPortland Extended Flow Test ("EWT")
13th Jul 201812:36 pmRNSCorporate Update & Notice of GM
12th Jul 20184:00 pmRNSSchedule 1 - UK Oil & Gas Plc
9th Jul 20182:05 pmRNSSecond Price Monitoring Extn
9th Jul 20182:00 pmRNSPrice Monitoring Extension
9th Jul 201811:05 amRNSSecond Price Monitoring Extn
9th Jul 201811:00 amRNSPrice Monitoring Extension
9th Jul 20187:00 amRNSCorporate Update: Change of AIM Trading Status
4th Jul 20187:00 amRNSSuccessful Placing to Raise £2m
3rd Jul 20182:00 pmRNSPrice Monitoring Extension
2nd Jul 20184:40 pmRNSSecond Price Monitoring Extn
2nd Jul 20184:35 pmRNSPrice Monitoring Extension
2nd Jul 20184:18 pmRNSCompletion of £5 million Institutional Placing
2nd Jul 20183:41 pmRNSConversion of Outstanding Loan Notes
2nd Jul 20182:05 pmRNSSecond Price Monitoring Extn
2nd Jul 20182:00 pmRNSPrice Monitoring Extension
2nd Jul 20189:05 amRNSSecond Price Monitoring Extn
2nd Jul 20189:00 amRNSPrice Monitoring Extension
29th Jun 201811:05 amRNSSecond Price Monitoring Extn
29th Jun 201811:00 amRNSPrice Monitoring Extension
29th Jun 20189:05 amRNSSecond Price Monitoring Extn
29th Jun 20189:00 amRNSPrice Monitoring Extension
29th Jun 20187:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.