The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0275
Bid: 0.025
Ask: 0.03
Change: 0.00 (0.00%)
Spread: 0.005 (20.00%)
Open: 0.0275
High: 0.0275
Low: 0.0275
Prev. Close: 0.0275
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Turkey: Operational Update & New Pinarova-1 well

11 Jan 2023 07:00

RNS Number : 3123M
UK Oil & Gas PLC
11 January 2023
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Turkey: Operational Update & New Pinarova-1 well

 

Further to the analysis of the Q3 2022 Phase 2 Seismic Programme UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that the Resan JV (UKOG 50% working interest) has identified and plans to drill in Q1 2023, a new potential shallow oil accumulation, Pinarova, of some 9 km² areal extent, located 6 km north of the Basur-1 oil discovery. The new Pinarova-1 well is designed to test a working hypothesis, supported by well and seismic data, that the active (41.7˚API) light oil seep found last summer in a seismic shot hole (see RNS of 30 June 2022) above the Pinarova structure, is directly fed by and connected to an underlying light oil accumulation within Eocene Hoya group limestones, 300-645m below surface.

The presence of movable oil within Pinarova is indicated by results of the 2018 Kezer-1 shallow geothermal well, located near the apex of the Pinarova geological feature. Kezer-1 reported strong oil shows throughout the Hoya and flowed heavily oil-cut fluids to surface on a short open-hole geothermal test. Kezer-1 was deemed unsuitable for geothermal purposes and abandoned. Both new and legacy seismic data also show a series of vertically stacked seismic amplitude anomalies within the core of Pinarova's Hoya structure, possibly directly indicating hydrocarbons and/or the development of good reservoir within the Hoya.

The Company and its joint partner Aladdin Middle East ("AME") consider Pinarova to offer similar potential success case outcomes to a Basur-4 appraisal well, but at a much lower drilling cost (c. $0.66 million gross versus c. $4.12 million gross) and with a shorter time to execution and delivery.

Pinarova-1 will, therefore, be designed to test if light oil is present in commercially viable saturations and quantities within the Hoya and, if successful, will be completed as a pumped oil production well. If successful, Pinarova-1 would likely be followed by a Pinarova-2 well and/or a Basur-4 appraisal well drilled from a new site west of Basur-1 (see below).

Basur oil discovery update

 

Analysis of the new Phase 2 seismic data also supports the directors' belief that the Basur structure extends more westwards than first mapped and can now be better appraised from a newly identified site, 1 km west of the Basur-1 oil discovery. The new site will enable the core of the Basur discovery to be reached and appraised with reduced horizontal deviation than from the Basur-3 site, and without the need to drill through the major NW-SE thrust fault zone immediately to the south. The new location thus removes the potential lost circulation, stuck pipe and significant cost overrun risks associated with drilling through the heavily fractured limestones within the thrust-fault zone. The new site will, however, require a new pad and longer access track to be constructed. 

Stephen Sanderson, Chief Executive, commented:

 

"Pinarova's prospectivity, potential success case volumes and modest drilling costs make it an attractive short-fuse project worth pursuing. We are actively supporting our operator AME to get Pinarova-1 drilled as soon as practicable in 2023 and, if successful, either Pinarova-2 and/or a Basur-4 appraisal well drilled from a new site 1 km west of the Basur-1 discovery."

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has 39 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

Glossary

°API

a measure of the density of crude oil, as defined by the American Petroleum Institute

discovery

a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

geothermal well

a well designed to harness geothermal heat within the earth by transferring heat from hot formation water at depth to surface via a borehole. The heat transfer to surface can be via direct circulation of formation water to surface (circulating loop) or via means of a heat pump within the borehole (closed loop).

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin.

lost circulation

occurs when drilling mud is lost into one or more geological formation due to the presence of faults, fractures, or highly permeable layers.

oil seep

a natural flow of crude oil at or close to the earth's surface whose origin is from a petroleum accumulation or oil source rock at depth.

seismic amplitude

a measure of the seismic reflection strength at a given subsurface interface

seismic amplitude anomaly

a seismic amplitude that is either higher or lower than the general amplitudes seen elsewhere at the same geological interface

shot hole

a shallow borehole in which a small amount of explosive is detonated in order to generate a seismic signal

stuck pipe

a situation where the drill string becomes stuck in the borehole requiring specialist equipment and techniques to recover it to surface or for a mechanical sidetrack to drill around the stuck pipe.

thrust fault

a type of fault that forms in areas where the earth's crust is under compression such as in orogenic (mountain) belts and where the upper block moves up and over the lower block.

 

For further information, please contact:

UK Oil & Gas PLC

 

Stephen Sanderson / Allen D Howard

 

Tel: 01483 941493

WH Ireland Ltd (Nominated Adviser and Broker)

 

James Joyce / Andrew de Andrade

Tel: 020 7220 1666

 

Communications

 

Brian Alexander

Tel: 01483 941493

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFFFVILIIILIV
Date   Source Headline
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed
30th Mar 20231:44 pmRNSHolding(s) in Company
28th Mar 20237:37 amRNSHorse Hill Farmout
23rd Mar 20237:00 amRNSHorndean Field Resource Report by D&M
13th Mar 202310:34 amRNSTurkey: Pinarova-1 Construction Commences
8th Mar 20239:13 amRNSHolding(s) in Company
6th Mar 20237:00 amRNSTurkey: Pinarova-1 drilling update
3rd Mar 20233:09 pmRNSLoxley update
1st Mar 20237:00 amRNSTurkey: Pinarova-1 well update
27th Feb 20237:00 amRNSHorse Hill Water Reinjection Update
21st Feb 202311:05 amRNSSecond Price Monitoring Extn
21st Feb 202311:00 amRNSPrice Monitoring Extension
21st Feb 20237:00 amRNSRPS Loxley Gas Discovery Report
10th Feb 202310:06 amRNSTurkey Earthquake
6th Feb 20237:00 amRNSPEDL234 Loxley gas discovery update
1st Feb 20237:00 amRNSPEDL234 Loxley gas discovery update
26th Jan 20237:00 amRNSMeeting with Energy Minister Rt Hon Graham Stuart
23rd Jan 20237:00 amRNSHolding(s) in Company
11th Jan 20237:00 amRNSTurkey: Operational Update & New Pinarova-1 well
19th Dec 202211:59 amRNSHolding(s) in Company
1st Dec 20229:06 amRNSDirector Share Purchase
24th Nov 20225:50 pmRNSHolding(s) in Company
23rd Nov 20222:05 pmRNSSecond Price Monitoring Extn
23rd Nov 20222:00 pmRNSPrice Monitoring Extension
8th Nov 20227:10 amRNSDirector Share Purchase
14th Oct 20227:09 amRNSHigh Court upholds Loxley planning consent
6th Oct 20227:00 amRNSDirector Share Purchase
16th Sep 20227:00 amRNSTurkey Phase 2 seismic completed
13th Sep 20226:16 pmRNSHolding(s) in Company
12th Sep 20229:05 amRNSSecond Price Monitoring Extn
12th Sep 20229:00 amRNSPrice Monitoring Extension
12th Sep 20227:00 amRNSSuccessful Placing and appointment of new CFO
8th Sep 20229:05 amRNSSecond Price Monitoring Extn
8th Sep 20229:00 amRNSPrice Monitoring Extension
6th Sep 20222:00 pmRNSPrice Monitoring Extension
5th Sep 20224:41 pmRNSSecond Price Monitoring Extn
5th Sep 20224:35 pmRNSPrice Monitoring Extension
30th Aug 202211:02 amRNSDirector/PDMR Shareholding
15th Aug 202211:59 amRNSHorse Hill Update
27th Jul 20224:41 pmRNSSecond Price Monitoring Extn
27th Jul 20224:35 pmRNSPrice Monitoring Extension
27th Jul 20222:00 pmRNSSuccessful Placing
25th Jul 20227:00 amRNSDirector/PDMR Shareholding
20th Jul 20227:00 amRNSOperational Update
30th Jun 20227:05 amRNSInterim Results
30th Jun 20227:00 amRNSTurkey operational update
28th Jun 20221:40 pmRNSResult of Annual General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.