George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Turkey: Basur-3 drilling update

1 Jul 2021 07:00

RNS Number : 7539D
UK Oil & Gas PLC
01 July 2021
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Turkey: Basur-3 drilling update #2

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that following completion of the Basur-3 appraisal well's initial 17½ inch diameter hole section, 13⅜ inch casing has now been set, successfully cemented down to a drilled depth of 367 m (1204 ft) below surface and pressure tested. Following setting of blow out preventers, drilling will then resume in 12¼ inch hole section, the base of which is planned to penetrate the Garzan limestone, the first of two target horizons.

 

The Basur-3 oil appraisal well is located within the north-western structural culmination of the 60 km² Basur-Resan geological anticlinal structure, approximately 1.2 km north of the 1964 Basur-1 oil discovery well which, as previously reported on 14 October 2020, 15 January 2021, 21 June 2021, flowed oil to surface at encouraging rates over a 6 hour test period.

 

Basur-3 is the first modern well designed to properly appraise and assess the extent and commercial viability of the Basur-Resan oil pool discovered in the 1950s-1960s.

 

UKOG Turkey Ltd holds a 50% non-operated interest in B-3 and the surrounding 305 km² Resan M47-b1,b2 licence.

 

A selection of the latest site photographs are available on the Company's website:

https://www.ukogplc.com

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has 38 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582#

 

W H Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Communications

Brian Alexander Tel: 01483 900582

 

 

 

Glossary

 

anticline

a domed shape geological structure. Often the anticline's geological expression can be seen at surface where it is expressed as a surface anticline. This is the case at Basur-Resan.

discovery

a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

limestone

sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate or lime) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones

oil field

a subsurface oil accumulation existing within a single or multiple geological reservoir unit from which oil is recovered to surface. Note that an oil field can consist of one or more oil pools or distinct reservoirs.

oil pool

a subsurface oil accumulation existing within a single geological reservoir unit.

 

 

UKOG Licence Interests

The Company has interests in the following UK and international licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill ¹, ⁵

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Field in stable production

Horse Hill ¹, ⁵

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

Field in stable production

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field temporarily shut in

Resan Turkey 2, 3, 8

M-47-b1, b2

50%

UKOG Turkey Ltd

Aladdin Middle East

305

Appraisal of Basur-Resan oil discovery plus further expl. prospects. Drilling planned in Summer 2021

Loxley 2, 3, 7

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300

Loxley/Godley Bridge gas discovery, BB-1/1z oil discovery

Isle of Wight 2, 3

PEDL331

95%

UKOG

UKOG

200

Planning application submitted for Arreton oil appraisal well

 

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Loxley Portland gas accumulation, the Broadford Bridge-1/1z Kimmeridge oil discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge oil field with productive and commercially viable zones, HH-1 in stable oil production, production planning consent granted in September 2019, long-term production consent granted in March 2020.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

8. High-impact oil appraisal project with an upside OIP range of 150-500 mmbbl gross with expected recovery factors of 10-20% of OIP

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEAFKEDSAFEAA
Date   Source Headline
20th Mar 202011:00 amRNSPrice Monitoring Extension
19th Mar 20204:54 pmRNSLoan Balance Reduction
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:00 pmRNSPrice Monitoring Extension
13th Mar 20207:00 amRNSHorse Hill Granted Long-Term Production Consent
12th Mar 20204:44 pmRNSSecond Price Monitoring Extn
12th Mar 20204:37 pmRNSPrice Monitoring Extension
9th Mar 202010:00 amRNSDry Oil Flows to Surface- Water Shut-Off Programme
5th Mar 20207:49 amRNSLoan Balance Reduction
26th Feb 20203:19 pmRNSLoan Balance Reduction
19th Feb 202012:30 pmRNSHH-2z Water Shut Off Intervention Commences
17th Feb 20207:00 amRNSLoan Balance Reduction
12th Feb 202012:57 pmRNSResult of General Meeting & Loan Update
3rd Feb 20204:25 pmRNSLoan Balance Reduction
31st Jan 20204:40 pmRNSSecond Price Monitoring Extn
31st Jan 20204:35 pmRNSPrice Monitoring Extension
28th Jan 20207:00 amRNSHorse Hill & Loxley Update - Notice of GM
13th Jan 20203:25 pmRNSLoan Balance Reduction
7th Jan 202011:09 amRNSHolding(s) in Company
2nd Jan 20203:55 pmRNSIssue of Shares
30th Dec 201912:47 pmRNSLoan Balance Reduction
23rd Dec 20197:00 amRNSHH-1 and HH-2z Extended Well Test Update
2nd Dec 20197:00 amRNSResult of Placing
29th Nov 20193:35 pmRNSLoan Balance Reduction
27th Nov 20197:00 amRNSHH-2z Completed - Horse Hill
22nd Nov 20194:36 pmRNSLoan Balance Reduction
15th Nov 20191:04 pmRNSLoan Balance Reduction
12th Nov 20197:00 amRNSHH-2z Horizontal Drilling Completed
7th Nov 20194:33 pmRNSLoan Balance Reduction
4th Nov 20197:00 amRNSHorse Hill Oil Field: HH-2z Horizontal Update
22nd Oct 20197:00 amRNSHH-2 Pilot Completed & HH-2z Horizontal Underway
15th Oct 20199:00 amRNSSuccessful Completion of HH-2 Coring Operations
11th Oct 20198:56 amRNSCoring Operations Underway at Horse Hill
9th Oct 20194:05 pmRNSFurther Loan Balance Reduction
9th Oct 20197:31 amRNSHorse Hill-1 Kimmeridge "Sim-Ops" Flow Test Update
8th Oct 20197:00 amRNSDrilling Update - Horse Hill
30th Sep 20197:01 amRNSHH-2/2z Drilling Commences ("Spud") at Horse Hill
30th Sep 20197:00 amRNSGrant of Options and Share Incentive Plan
27th Sep 20193:58 pmRNSLoan Conversion
24th Sep 20197:00 amRNSRig Arrival at Horse Hill
16th Sep 201911:33 amRNSLoan Conversion
12th Sep 20197:00 amRNSDrilling and Testing Update
11th Sep 201912:36 pmRNSHorse Hill Granted Long-term Production Consent
11th Sep 20197:00 amRNSCompletion of Acquisition in Horse Hill
20th Aug 20197:00 amRNSLicence Extensions on PEDL331 and PEDL143
9th Aug 20194:41 pmRNSSecond Price Monitoring Extn
9th Aug 20194:36 pmRNSPrice Monitoring Extension
7th Aug 20197:00 amRNSAcquisition of Further Interest in Horse Hill
1st Aug 20197:00 amRNSHorse Hill-1 Production Test Update
28th Jun 20197:00 amRNSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.