Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.12
Bid: 0.11
Ask: 0.13
Change: 0.00 (0.00%)
Spread: 0.02 (18.182%)
Open: 0.12
High: 0.12
Low: 0.12
Prev. Close: 0.12
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MB Fluorspar Project Update

11 Sep 2013 07:00

RNS Number : 6275N
Tertiary Minerals PLC
11 September 2013
 



 

Tertiary Minerals plc

("the Company")

11 September 2013

 

MB FLUORSPAR PROJECT - PHASE 1 DRILLING RESULTS

 

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to announce the results of analysis from Phase 1 of the current drilling programme and the start of Phase 2 for the Company's MB Fluorspar Project in Nevada, USA.

 

Highlights:

 

· Southern (Base) Area: Hole 13MBRC001

 

42.67m grading 12.4% 1Fluorspar (CaF2) from 4.57m depth including:

4.57m grading 26.1% CaF2 from 6.10m depth, and

12.19m grading 16.5% CaF2 from 25.91m depth.

 

· Central Area: Hole 13MBRC002

 

28.96m grading 10.5% CaF2 from 28.96m depth including:

9.14m grading 14.56% CaF2 from 30.48m depth.

 

· Drill holes also contain intersections of zinc, tungsten and beryllium mineralisation of possible economic interest.

 

Commenting today, Operations Director Richard Clemmey said: "It is very pleasing to be able to report that the Phase 1 RC drilling results are in line with expectations based on historical work on the project and we look forward to reporting the results of Phase 2 as they become available."

 

For further information please contact:

 

Tertiary Minerals plc

Tel: +44 (0)845 868 4580

Patrick Cheetham, Executive Chairman

Richard Clemmey, Operations Director

Cantor Fitzgerald Europe

Tel: +44 (0)20 7894 7000

Stewart Dickson/Julian Erleigh (Corporate Finance)

Jeremy Stephenson (Corporate Broking)

Beaufort Securities Limited

Tel: +44 (0)20 7382 8300

Christopher Rourke (Corporate Finance)

Guy Wheatley (Corporate Broking)

Yellow Jersey PR Limited

Tel: +44 (0)20 3664 4087

Dominic Barretto/Anna Legge

 

Detailed Information

 

The objective of Phase 1 of the drilling programme was to evaluate the most cost-effective drilling technique for the MB Project, test suitable analytical techniques for fluorine, and to collect diamond drill core for use in preliminary metallurgical testing.

 

The Phase 1 drilling programme comprised a short drilling programme twinning a diamond drill (DD) hole and a lower-cost Reverse Circulation (RC) percussion drill hole at two separate locations.

 

Holes 13TMBRC001 and 13TMBDD003 were drilled in the southern part of the known area of mineralisation whilst holes 13TMBRC002 and 13TMBDD004 were drilled in the west-central area.

 

Samples were collected at 5 foot intervals in all holes with samples being analysed for 1fluorine by the Ion Specific Electrode method (ISE). A rigorous programme of quality control and sample type evaluation was carried out including check assays at a second laboratory using an alternative analytical technique.

 

RC drilling appears to have been successful with no notable loss of fluorspar fines to the circulation water. Such loss was a theoretical concern prior to the start of drilling. Diamond drilling, however, suffered from unacceptable core recovery (average 84% recovery) and returned lower analytical values for fluorine. This is interpreted as due to breakage of core along fluorspar bearing veins and loss of fluorite to the drilling mud.

 

Significant intervals of zinc (Zn) tungsten (reported as oxide WO3) and beryllium (reported as oxide BeO) mineralisation were encountered during the drilling with a best result from diamond drill hole 13TMBDD004:

 

3.05m from 55 m depth grading 7.8% Zinc, 0.40% WO3 and .22% BeO and 16.6%CaF2.

 

It should be noted that, in this case, the corresponding interval in the twin RC hole returned lower, but still highly significant metal values, and consequently the above result needs to be viewed with some caution. It does, however, highlight the multi-element potential of the large MB mineralised system and a large surface zinc geochemical anomaly delineated by Union Carbide in the 1960s, 500m to the east of hole 13TMBDD004, now warrants testing.

 

The Company has now committed to Phase 2 of the drilling programme which will be carried out using the more cost effective RC drilling method. The RC drill rig will mobilise back to site in the next two weeks.

 

The objectives of Phase 2 drilling will be to:

 

1. Define, on the south side of the 1known fluorspar deposit, a 2JORC compliant Mineral Resource of sufficient size to support planning of a mine-starter pit for up to the first ten years of production.

 

2. Indicate the extent of potentially higher grade areas in the centre of the known deposit.

 

3. Test, on the north side of the known deposit, an alternative site for a mine-starter pit.

 

The Phase 2 drill programme is expected to last for two months.

 

 

 

Notes to Editors:

 

Tertiary Minerals plc (AIM - EPIC: 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. Tertiary controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and the strategically significant MB project in Nevada USA where it recently announced a 3tonnage-grade estimate of 85-105 million tonnes grading 9-11% fluorspar (CaF2) at an 8% CaF2 cut-off (12 February 2013).

 

 

Foot Notes

 

1. Values being reported for fluorspar (reported by its chemical composition CaF2) are calculated from the elemental analysis of fluorine and by making the assumption that all fluorine in the sample is present in the form of fluorspar. This is considered a valid assumption based on the current knowledge of the deposit.

 

2. JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

3. The nature and extent of the known mineralisation on the MB Project has been described in previous announcements and its estimated tonnage-grade range is classified as an Exploration Target under the JORC Code as more particularly set out in the announcement dated 12 February 2013.

 

4. The information in this release has been compiled and reviewed by Mr Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFSIARIILIV
Date   Source Headline
14th May 20207:00 amRNSPyramid Gold Project – Provisional Drill Results
14th May 20207:00 amRNSIssue of Equity
29th Apr 20207:00 amRNSIssue of Equity
24th Apr 202011:00 amRNSPrice Monitoring Extension
20th Apr 202010:53 amRNSPyramid Gold Project –Initial Drill Hole Completed
7th Apr 202011:05 amRNSSecond Price Monitoring Extn
7th Apr 202011:00 amRNSPrice Monitoring Extension
7th Apr 20208:47 amRNSPyramid Gold Project Update
2nd Apr 20209:05 amRNSSecond Price Monitoring Extn
2nd Apr 20209:00 amRNSPrice Monitoring Extension
2nd Apr 20207:00 amRNS£600,000 Placing
31st Mar 20207:00 amRNSTotal Voting Rights
25th Mar 20207:00 amRNSNotice of Resignation of Managing Director
19th Mar 20202:48 pmRNSResult of AGM
18th Mar 20204:43 pmRNSSecond Price Monitoring Extn
18th Mar 20204:38 pmRNSPrice Monitoring Extension
16th Mar 202010:30 amRNSHolding(s) in Company
13th Mar 20207:00 amRNSStatement re: Annual General Meeting
6th Mar 20209:35 amRNSHolding(s) in Company
3rd Mar 20203:05 pmRNSHolding(s) in Company
3rd Mar 20202:05 pmRNSSecond Price Monitoring Extn
3rd Mar 20202:00 pmRNSPrice Monitoring Extension
28th Feb 20203:58 pmRNSGrant of Warrants
28th Feb 202010:18 amRNSDirector Dealing, Issue of Equity and TVR
28th Feb 20209:33 amRNSHolding(s) in Company
28th Feb 20207:00 amRNSTotal Voting Rights
25th Feb 202010:58 amRNSPublication of Report & Accounts / Notice of AGM
25th Feb 202010:11 amRNSPlacing to Raise £275,000
24th Feb 20207:00 amRNSHolding(s) in Company
21st Feb 20201:24 pmRNSHolding(s) in Company
19th Feb 202012:53 pmRNSAudited Results for the year to 30 September 2019
19th Feb 202011:05 amRNSSecond Price Monitoring Extn
19th Feb 202011:00 amRNSPrice Monitoring Extension
19th Feb 20209:05 amRNSSecond Price Monitoring Extn
19th Feb 20209:00 amRNSPrice Monitoring Extension
19th Feb 20207:00 amRNSExercise of Conversion Rights
18th Feb 20207:00 amRNSPyramid Gold Project - Update
31st Dec 20197:00 amRNSTotal Voting Rights
3rd Dec 201912:14 pmRNSDirector Dealing, Issue of Equity and TVR
29th Nov 20197:00 amRNSTotal Voting Rights
28th Nov 20199:25 amRNSHolding(s) in Company
26th Nov 20193:48 pmRNSIssue of Convertible Security
20th Nov 20197:00 amRNSUp to £622,000 Investment by way of Convertibles
14th Oct 20192:05 pmRNSSecond Price Monitoring Extn
14th Oct 20192:00 pmRNSPrice Monitoring Extension
14th Oct 201911:05 amRNSSecond Price Monitoring Extn
14th Oct 201911:00 amRNSPrice Monitoring Extension
27th Aug 201912:56 pmRNSHolding(s) in Company
14th Aug 20194:01 pmRNSHolding(s) in Company
6th Aug 20199:46 amRNSUpdate on Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.