Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Kolari Update

3 Jan 2008 07:00

Tertiary Minerals PLC03 January 2008 TERTIARY MINERALS PLC www.tertiaryminerals.com 3 January 2008 DRILL ASSAY RESULTS CONFIRM WIDE INTERVALS OF IRON MINERALISATION AT KOLARI IRON ORE TARGET IN FINLAND • All Three Holes Confirm Potential For Near Surface Ore • Two Of Three Shallow Holes Start And End In Mineralisation_________________________________________________________________________ Tertiary Minerals plc ("Tertiary" or "the Company" - AIM: TYM) is pleased toannounce that assay results from initial sampling from its drilling programme inthe Kolari iron-ore district in northern Finland confirm that wide intervals ofmagnetite iron mineralisation are present on the Kolari claims over asignificant strike length. The drilling, on the Sivakkalehto target, comprised three 60 degree angled scoutholes at 200m intervals along the strike of the central part of a north-easttrending ground magnetic anomaly. The drill holes were between 101m and 126.5mlong. Sampling of the drill core for analysis was initially carried out to confirmvisual estimation of magnetite content and some of the mineralised intervalshave not yet been sampled. The following table summarises assay results andmineralised sections not yet assayed. Visual estimates correspond well with theassay results received and allow the additional comments on iron mineralisedintervals and grade to be included in the accompanying table of results. The 17-34% iron intervals reported in the table below represent magnetitecontents of approximately 25-50%. Normally, magnetite can be concentrated to asaleable product grading 67% iron or more. Tertiary's initial drill holes were shallow with only a single hole drilled oneach profile. Holes 07TS2 and 07TS3 both collared in bedrock mineralisation(beneath a cover of overburden) and also ended in mineralisation. This suggeststhat the mineralised units could be significantly wider than the intervalspenetrated by these holes. Hole 07TS1 also intersected a zone of weak coppermineralisation and gold values in all three holes were generally low. Based on these initial results the Company is now targeting a large body ofopen-pittable magnetite mineralisation with magnetite content in the 30-50%range. A similar such orebody - the Southdown Magnetite deposit in WesternAustralia - is currently being developed by Grange Resources(www.grangeresources.com.au) based on a resource of 400mt at 37% magnetite. Tertiary's Chairman Patrick Cheetham commented: "We are very pleased with theseresults. They indicate the possible presence of a large body of ironmineralisation at commercial grades." Further assaying of the core will now be undertaken and follow-up drilling isbeing planned. Further info: Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: +44 (0)1625-626203Ron Marshman/John Greenhalgh, City of London PR Limited. Tel: +44(0)20-7628-5518 Notes:The information in this release has been compiled and reviewed by Mr. PatrickCheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIMGuidance Note for Mining Oil & Gas Companies issued on March 16, 2006. MrCheetham is a Member of the Institute of Materials, Minerals & Mining and also amember of the Australasian Institute of Mining & Metallurgy.The mineralisation intersected by the holes being reported is believed to besub-vertical and so the true thickness of mineralisation intersected by the 60degree dipping drill holes will be approximately 50% of the down holeintersected thickness that are reported. Table of Drill Results - Kolari Iron Project Down Hole IntersectionHole Number From To Thickness Iron Copper Comment m m m % % 07TS1 0.00 22.70 22.70 Overburden 31.40 58.60 27.20 17.5 0.12 Bedrock collared in mineralisation inc. 51.35 56.50 5.15 24.6 0.19 86.00 103.00 17.00 ? ? Similar iron grade - not yet assayed 07TS2 0.00 33.50 33.50 Overburden 33.50 56.05 22.55 ? ? Lower iron grade - not yet assayed 56.05 109.45 53.40 19.3 0.03 inc. 72.15 109.45 37.30 22.4 0.03 Similar iron grade to end of hole 109.45 126.20 16.80 ? ? - not yet assayed 07TS3 0.00 35.50 35.50 Overburden 35.50 72.00 36.50 28.4 0.00 inc. 38.25 47.00 8.75 34.0 0.00 Similar iron grade to end of hole 72.00 101.00 29.00 ? ? - not yet assayed This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Jun 20254:37 pmRNSHolding(s) in Company
13th Jun 20252:33 pmRNSHolding(s) in Company
6th Jun 202511:34 amRNSPlacing of £350,000
14th May 20259:31 amRNS-RProject Focus: Mushima North, Zambia
9th May 20253:48 pmRNSGrant of Warrants
14th Apr 20257:00 amRNSDrilling Results, Mukai Copper Project
31st Mar 20252:40 pmRNSKonkola West Copper Project - Drilling Update
25th Mar 20257:00 amRNSNew Silver Mineralisation - Mushima North, Zambia
17th Mar 20257:00 amRNSNew Silver Results - Mushima North, Zambia
7th Mar 20252:45 pmRNSResult of AGM
6th Mar 202512:45 pmRNSResult of AGM
27th Feb 20257:00 amRNSBrunton Pass Project – Drilling Results
25th Feb 20257:00 amRNSAppointment of Managing Director
20th Feb 20258:20 amRNSUpdate on Konkola West Copper Project
7th Feb 202511:00 amRNSAnnual Report for the Year Ended 30 September 2024
28th Jan 20257:00 amRNSAudited Results for Year Ended 30 September 2024
20th Jan 20257:00 amRNSNew Silver Discovery at Mushima North
20th Dec 20247:00 amRNSOperational Update - Zambia
16th Dec 20248:59 amRNSBrunton Pass Project – Completion of Drilling
2nd Dec 20249:27 amRNSTotal Voting Rights
18th Nov 20242:08 pmRNSAdoption of Discretionary Executive Bonus Scheme
15th Nov 20248:29 amRNSBrunton Pass Copper-Gold Project - Drill Start
4th Nov 20247:00 amRNSMukai Copper Project - Commencement of Drilling
28th Oct 20247:00 amRNSCopper-Zinc Mineralisation found at Mushima North
16th Oct 20247:00 amRNSMushima North Drilling
30th Sep 20247:00 amRNSTotal Voting Rights
23rd Sep 20247:00 amRNSDrill Start & Exploration Update
16th Sep 20241:12 pmRNSHolding(s) in Company
13th Sep 20243:51 pmRNSHolding(s) in Company
12th Sep 20244:16 pmRNSHolding(s) in Company
29th Aug 20245:19 pmRNSStoruman Fluorspar Project, Sweden
28th Aug 20247:00 amRNSPlacing to raise £880,000
9th Aug 20248:50 amRNSCEO Interview - Company Presentation
7th Aug 20247:00 amRNSMukai Project - Agreement for Joint Venture
29th Jul 20247:00 amRNSMupala Copper Project, Soil Sampling Results
21st Jun 20248:53 amRNSDRILLING UPDATE, KONKOLA WEST COPPER PROJECT
10th Jun 20247:00 amRNSMupala Copper Project, Zambia
6th Jun 202410:53 amRNSUpdate – Agreement with Mwashia
29th May 202410:42 amRNSHalf-Yearly Report 2024
21st May 20247:00 amRNSDrilling Update, Konkola West Copper Project
9th May 20247:00 amRNSMupala Copper Project Update
2nd May 20247:00 amRNSExploration Update – Brunton Pass Project, Nevada
16th Apr 20242:00 pmRNSDrilling - Konkola West Copper Project, Zambia
9th Apr 20249:48 amRNSDrill Start - Konkola West Copper Project, Zambia
29th Feb 20247:00 amRNSTotal Voting Rights
26th Feb 20247:00 amRNSAgreement with Mwashia Resources
15th Feb 20242:31 pmRNSGrant of Warrants
15th Feb 20249:41 amRNSComplete Results of AGM
14th Feb 20242:19 pmRNSResult of AGM
6th Feb 20241:58 pmRNSUpdate: KoBold's New Mingomba Copper Discovery

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.