Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Kolari Update

3 Jan 2008 07:00

Tertiary Minerals PLC03 January 2008 TERTIARY MINERALS PLC www.tertiaryminerals.com 3 January 2008 DRILL ASSAY RESULTS CONFIRM WIDE INTERVALS OF IRON MINERALISATION AT KOLARI IRON ORE TARGET IN FINLAND • All Three Holes Confirm Potential For Near Surface Ore • Two Of Three Shallow Holes Start And End In Mineralisation_________________________________________________________________________ Tertiary Minerals plc ("Tertiary" or "the Company" - AIM: TYM) is pleased toannounce that assay results from initial sampling from its drilling programme inthe Kolari iron-ore district in northern Finland confirm that wide intervals ofmagnetite iron mineralisation are present on the Kolari claims over asignificant strike length. The drilling, on the Sivakkalehto target, comprised three 60 degree angled scoutholes at 200m intervals along the strike of the central part of a north-easttrending ground magnetic anomaly. The drill holes were between 101m and 126.5mlong. Sampling of the drill core for analysis was initially carried out to confirmvisual estimation of magnetite content and some of the mineralised intervalshave not yet been sampled. The following table summarises assay results andmineralised sections not yet assayed. Visual estimates correspond well with theassay results received and allow the additional comments on iron mineralisedintervals and grade to be included in the accompanying table of results. The 17-34% iron intervals reported in the table below represent magnetitecontents of approximately 25-50%. Normally, magnetite can be concentrated to asaleable product grading 67% iron or more. Tertiary's initial drill holes were shallow with only a single hole drilled oneach profile. Holes 07TS2 and 07TS3 both collared in bedrock mineralisation(beneath a cover of overburden) and also ended in mineralisation. This suggeststhat the mineralised units could be significantly wider than the intervalspenetrated by these holes. Hole 07TS1 also intersected a zone of weak coppermineralisation and gold values in all three holes were generally low. Based on these initial results the Company is now targeting a large body ofopen-pittable magnetite mineralisation with magnetite content in the 30-50%range. A similar such orebody - the Southdown Magnetite deposit in WesternAustralia - is currently being developed by Grange Resources(www.grangeresources.com.au) based on a resource of 400mt at 37% magnetite. Tertiary's Chairman Patrick Cheetham commented: "We are very pleased with theseresults. They indicate the possible presence of a large body of ironmineralisation at commercial grades." Further assaying of the core will now be undertaken and follow-up drilling isbeing planned. Further info: Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: +44 (0)1625-626203Ron Marshman/John Greenhalgh, City of London PR Limited. Tel: +44(0)20-7628-5518 Notes:The information in this release has been compiled and reviewed by Mr. PatrickCheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIMGuidance Note for Mining Oil & Gas Companies issued on March 16, 2006. MrCheetham is a Member of the Institute of Materials, Minerals & Mining and also amember of the Australasian Institute of Mining & Metallurgy.The mineralisation intersected by the holes being reported is believed to besub-vertical and so the true thickness of mineralisation intersected by the 60degree dipping drill holes will be approximately 50% of the down holeintersected thickness that are reported. Table of Drill Results - Kolari Iron Project Down Hole IntersectionHole Number From To Thickness Iron Copper Comment m m m % % 07TS1 0.00 22.70 22.70 Overburden 31.40 58.60 27.20 17.5 0.12 Bedrock collared in mineralisation inc. 51.35 56.50 5.15 24.6 0.19 86.00 103.00 17.00 ? ? Similar iron grade - not yet assayed 07TS2 0.00 33.50 33.50 Overburden 33.50 56.05 22.55 ? ? Lower iron grade - not yet assayed 56.05 109.45 53.40 19.3 0.03 inc. 72.15 109.45 37.30 22.4 0.03 Similar iron grade to end of hole 109.45 126.20 16.80 ? ? - not yet assayed 07TS3 0.00 35.50 35.50 Overburden 35.50 72.00 36.50 28.4 0.00 inc. 38.25 47.00 8.75 34.0 0.00 Similar iron grade to end of hole 72.00 101.00 29.00 ? ? - not yet assayed This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20267:00 amRNSPlacing and Proposed Subscription for £1,000,000
15th May 20268:37 amRNSCorrection to Grant of Warrants RNS
5th May 20267:34 amRNSOperations Update, Zambia
20th Apr 20267:00 amRNS-RInvestor Presentation via Investor Meet Company
17th Apr 20261:50 pmRNSGrant of Warrants
17th Apr 202612:00 pmRNSHolding(s) in Company
30th Mar 20267:00 amRNSJORC Compliant Exploration Target - Mushima North
20th Mar 202611:46 amRNSResults of Annual General Meeting
19th Mar 202612:30 pmRNSResult of AGM
20th Feb 20263:32 pmRNSHolding(s) in Company
20th Feb 20267:00 amRNSAnnual Report for the Year Ended 30 September 2025
17th Feb 20267:00 amRNSAudited Results for Year Ended 30 September 2025
4th Feb 20267:00 amRNSHighest Grade Ag-Cu at Target A1, Mushima North
2nd Feb 202612:19 pmRNSHolding(s) in Company
6th Jan 20269:03 amRNSHolding(s) in Company
17th Dec 20257:00 amRNSBoard Change
16th Dec 20257:00 amRNSIntent to Produce Target for Cu-Ag, Mushima North
28th Nov 202510:08 amRNSTotal Voting Rights
13th Nov 20253:42 pmRNSDirector/PDMR Shareholding
13th Nov 20257:00 amRNSDrilling Update at Target A1, Mushima North
7th Nov 20252:11 pmRNSCLN Facility to Expand Exploration Programme
5th Nov 20259:37 amRNSDrilling Commences at Target A1
31st Oct 202511:04 amRNSTotal Voting Rights
31st Oct 20257:00 amRNSUpcoming Phase 3 Drill Programme at Target A1
30th Oct 20257:00 amRNSKobold to advance Konkola West Project Agreement
28th Oct 20257:00 amRNSAppointment of Corporate Broker
20th Oct 20257:00 amRNSPlacing to raise £100,000
9th Oct 20257:00 amRNS-RProject Focus: Target A1, Mushima North, Zambia
3rd Oct 20253:47 pmRNSHolding(s) in Company
2nd Oct 20254:07 pmRNSHolding(s) in Company
1st Oct 20257:21 amRNSHighest grade Ag-Cu at Target A1, Mushima North
24th Sep 20257:00 amRNSDrill holes show silver - Target A1, Mushima North
10th Sep 202512:29 pmRNSHolding(s) in Company
3rd Sep 20253:42 pmRNSHolding(s) in Company
2nd Sep 20257:00 amRNSPhase 2 Drilling Results: Target A1, Mushima North
11th Aug 20257:00 amRNSCompletion of Phase 2 at Target A1 - Mushima North
31st Jul 20251:42 pmRNSTotal Voting Rights
25th Jul 202510:09 amRNSHolding(s) in Company
25th Jul 20258:30 amRNSHolding(s) in Company
21st Jul 20257:00 amRNSDrilling Commences at Target A1 - Mushima North
8th Jul 20257:00 amRNSUpcoming Drill Programme - Mushima North, Zambia
4th Jul 20259:45 amRNSHolding(s) in Company
1st Jul 202511:31 amRNSDirectors’ Subscriptions
30th Jun 202510:13 amRNSTotal Voting Rights
27th Jun 20252:00 pmRNSHalf-Yearly Report 2025
25th Jun 20257:00 amRNSUpdate: Konkola West Copper Project, Zambia
23rd Jun 20258:53 amRNSHolding(s) in Company
19th Jun 20257:00 amRNS-RProject Focus: Jacks Copper Project, Zambia
17th Jun 20259:27 amRNSHolding(s) in Company
16th Jun 20253:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.