Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Drilling and Testwork Update

20 Jul 2011 07:00

RNS Number : 6418K
Tertiary Minerals PLC
20 July 2011
 



 

 

www.tertiaryminerals.com

("Tertiary" or "the Company")

20 July 2011

 

DRILLING & TESTWORK UPDATE

 SWEDISH & NORWEGIAN FLUORSPAR PROJECTS

 

Tertiary Minerals plc, a diversified mineral explorer and developer building a significant strategic position in the fluorspar sector, is pleased to provide the following updates on its Storuman (Sweden) and Lassedalen (Norway) fluorspar projects.

 

Highlights

 

§ Drill programme to commence at Storuman this week with objective to test:

 

Ø immediate extensions to recently announced Mineral Resource, and

Ø more speculative distal extensions to fluorspar mineralisation.

 

Secondary objective is to sterilise potential plant and tailings sites.

 

§ Metallurgical testwork programme at Lassedalen awarded to Wardell Armstrong aims to produce acid grade fluorspar from drill samples and provide data for preliminary economic evaluation.

 

 

Storuman Fluorspar Project, Sweden

 

The Storuman drill programme will commence this week and is planned to comprise ten holes.

 

Five holes will be drilled along a north-west to south-east traverse some 400m south-west of the current limit of drilling where the mineralisation remains open. This drill traverse, if successful, is close enough to the defined resource for the results to be included in future JORC Mineral Resource upgrades and could deliver additional shallow mineralisation for early-year mine planning.

 

A further five holes will be drilled at distances up to 2.7km away from the currently defined resource boundary. These five, more speculative, holes are designed to give more regional information on the distribution and depth of the fluorspar-hosting geological sequence, to find further extensions to mineralisation and also to sterilise a potential process plant and tailings site.

 

Lassedalen Fluorspar Project, Norway

 

Following the receipt of positive sampling results from archive drill core reported in May this year, a programme of metallurgical testwork has now been awarded to Wardell Armstrong in Cornwall.

 

The objective of the testwork programme, now started, is to confirm that acid grade fluorspar can be produced from Lassedalen as indicated by 1970s testwork reports. The new testwork programme will also provide critical information for incorporation into a preliminary economic evaluation scheduled for the Lassedalen project.

 

The testwork programme is expected to take 6 months to complete and significant results will be reported on an interim basis.

 

 

ENQUIRIES

 

Tertiary Minerals plc Tel: +44 (0)845 868 4580

Patrick Cheetham, Executive Chairman www.tertiaryminerals.com

Seymour Pierce Limited Tel: +44 (0)20 7107 8000

Stewart Dickson (Corporate Finance)

Jeremy Stephenson (Corporate Broking)

 

Yellow Jersey PR Limited Tel: +44 (0)7768 537 739

Dominic Barretto

 

Notes:

 

1. The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

2. Reference to dates or timetables for exploration programmes and the receipt of results are based on the Company's expectations held at the date of this release. Such timetables often depend on outside contractors, weather conditions and permitting issues beyond the Company's control and are therefore subject to change.

 

 

NOTES TO EDITORS

 

Background to the Company

 

Tertiary Minerals plc is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries and Tertiary controls an estimated four million tonnes of fluorspar across its two Scandinavian projects (Storuman in Sweden and Lassedalen in Norway).

 

A European Commission report recently named fluorspar as one of its 14 'critical mineral raw materials' for which a possible supply shortage would represent a substantial economic threat. Fluorspar prices have been rising rapidly on the back of long term structural shortages of supply from China.

 

In mid-2010 the Company completed an economic scoping study for development of its Storuman fluorspar project in Sweden that demonstrated attractive project returns at an ex-port (FOB) China price equivalent to just US$287/tonne.

 

Recently the Company published its maiden open-pit mine constrained Minerals Resource for Storuman of 28 million tonnes grading 10.2% fluorspar containing 2.8 million tonnes of fluorspar mineral and spot prices for fluorspar have been reported as high as US$600/tonne ex-port (FOB) China.

 

The Company also has interests in exploration and development of Gold, Iron, Tantalum, Niobium and Rare-earths in Finland and Saudi Arabia. Shares in the Company trade on AIM and also on PLUS Markets (ticker symbol 'TYM').

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKKLBFFDFEBBV
Date   Source Headline
21st Aug 201412:38 pmRNSDirectors Share Holding - Correction Announcement
20th Aug 20145:57 pmRNSDirectors Share Issue and Total Voting Rights
30th Jul 20147:00 amRNSChange of Auditor
11th Jul 20147:00 amRNSPlacing & Issue of Equity
2nd Jul 20147:00 amRNS"Exploitation Permit Application"
19th May 20147:00 amRNSHalf Yearly Report
24th Apr 20147:00 amRNSStmnt re Share Price Movement
16th Apr 20147:00 amRNSMaiden JORC Compliant Mineral Resource Estimate
15th Apr 20148:14 amRNSDraw Down of Funds and Issue of Equity
19th Mar 201412:38 pmRNSHolding(s) in Company
10th Mar 20147:00 amRNSDrilling Results and Contract Award
25th Feb 20149:01 amRNSIssue of Equity
20th Feb 20147:00 amRNSResult of AGM
19th Feb 20147:00 amRNSUpdate of Corporate Presentation
17th Jan 20147:00 amRNSPosting of Annual Report and Notice of AGM
15th Jan 201411:58 amRNSIssue of Warrants
14th Jan 20149:40 amRNSExercise of Options - Issue of Equity and TVR
13th Jan 20147:00 amRNSMB Fluorspar Project Drilling Results
18th Dec 20137:00 amRNSMB Fluorspar Project - Drill Results
12th Dec 20133:45 pmRNSAudited Results for the year to 30 September 2013
13th Nov 20133:00 pmRNSHolding(s) in Company
13th Nov 201311:55 amRNSHolding(s) in Company
12th Nov 20137:01 amRNSDirectorate Change
12th Nov 20137:00 amRNSClose of Equity Swap Agreement
11th Sep 20137:00 amRNSMB Fluorspar Project Update
20th Aug 20132:58 pmRNSUpdated Company Presentation
20th Aug 20137:00 amRNSProject Update
14th Aug 20137:00 amRNSAppointment of Joint Broker
10th Jul 20137:00 amRNSMB Project Update
27th Jun 20133:22 pmRNSHolding(s) in Company
27th Jun 20133:21 pmRNSHolding(s) in Company
18th Jun 20137:00 amRNSDirector/PDMR Shareholding
30th May 201310:35 amRNSCorporate interview available online
24th May 20137:00 amRNSSubscription for Ordinary Shares and Equity Swap
14th May 20137:00 amRNSHalf Yearly Report
9th May 20137:00 amRNSMB Fluorspar Project - Update
22nd Mar 201311:25 amRNSDirector/PDMR Shareholding
18th Mar 20137:00 amRNSExercise of Options - Issue of Equity & TVR
8th Mar 20139:39 amRNSIssue of Equity and Total Voting Rights
6th Mar 20137:00 amRNSDraw Down of Funds & Issue of Equity
5th Mar 20137:00 amRNSChange of Adviser
19th Feb 20134:17 pmRNSResult of AGM
12th Feb 20137:00 amRNSMB Project Tonnage Grade Estimate
31st Jan 201311:13 amRNSUpdate - MB Fluorspar Project, Nevada USA
11th Jan 20137:00 amRNSIssue of Warrants / Director Shareholding
21st Dec 201211:37 amRNSDraw Down of Funds and Issue of Equity
14th Dec 20127:00 amRNSContract for Tonnage-Grade Estimate
13th Dec 20127:00 amRNSFinal Results
30th Nov 20127:00 amRNSPublication of Presentation
29th Nov 20127:00 amRNSMB Project Review Defines Fluorspar Deposit

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.