Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTower Resources Regulatory News (TRP)

Share Price Information for Tower Resources (TRP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0155
Bid: 0.015
Ask: 0.016
Change: 0.00 (0.00%)
Spread: 0.001 (6.667%)
Open: 0.0155
High: 0.0155
Low: 0.0155
Prev. Close: 0.0155
TRP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Uganda - Iti-1 well - revised conclusions

21 Sep 2009 14:52

RNS Number : 4022Z
Tower Resources PLC
21 September 2009
 

PRESS RELEASE

21 September 2009

Tower Resources revises Iti-1 conclusions

Tower Resources plc ("Tower" or the "Company")

Tower Resources is pleased to announce that it has concluded its detailed evaluation of information from the Iti-1 well. Analyses and interpretations have been carried out by independent experts and specialists using relevant laboratories in the UK. The overall findings of the re-evaluation is that the Iti-1 well found 15-20 metres of clean reservoir sands, with significant potential to contain oil just above basement between 540 and 575 meters. This conclusion would need to be verified by a well test, and given the high cost of re-entering the existing well it is likely that the company will instead drill another well on the Iti structure at a later date. However, the company's first priority, and commitment under its work programme, is to drill a second exploration well, and the company is still considering the best location for this second well in light of the information that the Iti-1 well has provided. The company hopes, subject to Government approval, to drill this second well in early 2010, with a target of February.

The following provides a summary of conclusions drawn to date from the re-assessment.

 

 

1. Independent inspections of the rock cuttings material by an expert sedimentologist and specialist laboratory analyses have confirmed the presence of clean reservoir sands, with good porosities and permeabilities, in the interval just above basement between 540 metres and 575 metres (“the basal reservoir”). Net sand thickness is estimated to be 15-20 metres. Basin modelling by the sedimentologist has also indicated that alluvial fans could be present at the Iti-1 location and could be analogous to the basin margin edge discoveries in Block EA2.
 

2. Detailed inspection of wireline pressure data, after undertaking quality control of the raw data and re-evaluation of wireline logs indicate that the basal reservoir could be oil bearing and is separated from the overlying sediments which are clearly sealing and water bearing.

 
3. Fluid samples taken by a wireline formation fluid sampler produced what had initially appeared to be samples containing only water. Subsequent inspection of the sample chambers showed oil traces, and small quantities of oil have been extracted from the rock samples. Analyses of these oil samples indicate that oil could be present above and within the basal reservoir although this could be consistent with residual non-producible oil in the formations. Further study is ongoing.
 
4. Detailed re-examination of seismic data, now calibrated by well data, is helping to better understand EA5 prospectivity and more work is currently underway for this purpose.

Detailed discussions with the Government of Uganda have commenced to jointly agree the significance of these updated results. The immediate work programme will focus on evaluating prospective well locations and planning for drilling a second exploration well early in 2010. A further update will be provided to shareholders once a firm forward programme has been agreed with the Government of Uganda, hopefully in the second half of October. A follow up well on the Iti structure will be considered in due course to confirm a working hydrocarbon system within the structure.

 

Peter Kingston commented; "We were surprised and disappointed at the initial findings of the Iti-1 well, which we originally reported in June, so we are naturally pleased that a much more comprehensive evaluation has indicated significant potential for hydrocarbons in the Iti structure. The outcome of the evaluation also provides us with great encouragement for the rest of Exploration Area 5."

In accordance with AIM guidelines, Peter Kingston, who is a petroleum reservoir engineer with over 40 years experience in technical, executive and advisory roles in the oil exploration and production industry, and is Executive Chairman of the Company, is the qualified person that has reviewed and approved the technical information contained in this announcement. 

Contacts:

Tower Resources plc

www.towerresources.co.uk 

Peter Kingston, Chairman

07802 804852

Astaire Securities (NOMAD and Broker)

Lindsay Mair/Jerry Keen

020 7448 4400

Aquila Financial Limited (PR)

www.aquila-financial.com 

Peter Reilly

0118 979 4100

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLBMJTMMITBPL
Date   Source Headline
21st Feb 20199:28 amRNSHolding(s) in Company
20th Feb 20199:43 amRNSHolding(s) in Company
13th Feb 201911:50 amRNSHolding(s) in Company
11th Feb 20199:34 amRNSHolding(s) in Company
8th Feb 20197:00 amRNSBrulpadda well statement and TRP resource update
6th Feb 201910:56 amRNSHolding(s) in Company
1st Feb 20195:02 pmRNSHolding(s) in Company
31st Jan 201910:40 amRNSHolding(s) in Company
31st Jan 20197:00 amRNSTotal Voting Rights
29th Jan 20197:00 amRNSOil Capital Conference Presentation
28th Jan 201911:15 amRNSTurner Pope Investor Evening
28th Jan 20199:46 amRNSHolding(s) in Company
25th Jan 20195:01 pmRNSHolding(s) in Company
25th Jan 201910:10 amRNSHolding(s) in Company
25th Jan 201910:10 amRNSHolding(s) in Company
24th Jan 20196:00 pmRNSClarification announcement
24th Jan 20197:30 amRNSCompletion of Placing and Director's Dealings
24th Jan 20197:00 amRNSProposed Placing and Subscription for £1.7 million
7th Dec 20187:00 amRNSCameroon Drilling Contract - proposed NJOM-3 well
23rd Nov 201811:19 amRNSHolding(s) in Company
8th Nov 20187:00 amRNSUpdated Corporate Presentation
7th Nov 20181:30 pmRNSAfrica Oil Week: Prospect Forum Presentation
7th Nov 20187:00 amRNSNew Namibia Petroleum Agreement
6th Nov 20188:58 amRNSHolding(s) in Company
1st Nov 20187:00 amRNSCameroon Reserves Report and Operational Update
22nd Oct 20189:43 amRNSHolding(s) in Company
15th Oct 20189:31 amRNSHolding(s) in Company
12th Oct 20189:20 amRNSHolding(s) in Company
11th Oct 201812:33 pmRNSHolding(s) in Company
1st Oct 20187:00 amRNSIssue of Warrants to Directors
28th Sep 20187:00 amRNSInterim Results to 30 June 2018
21st Sep 20187:00 amRNSSouth Africa Update - Farm-out Process
17th Sep 20187:00 amRNSCameroon Operational Update
6th Sep 201810:41 amRNSHolding(s) in Company
4th Sep 201812:00 pmRNSOil Capital Conference: Corporate Presentation
20th Aug 20187:00 amRNSCameroon Operational Update
13th Aug 20189:09 amRNSHolding(s) in Company
9th Aug 20189:16 amRNSHolding(s) in Company
8th Aug 20189:08 amRNSHolding(s) in Company
7th Aug 20189:36 amRNSHolding(s) in Company
27th Jul 20182:10 pmRNSHolding(s) in Company
2nd Jul 20187:00 amRNSIssue of Warrants to Directors
29th Jun 201812:22 pmRNSResult of AGM
26th Jun 20186:18 pmRNSHolding(s) in Company
26th Jun 20189:01 amRNSHolding(s) in Company
21st Jun 20188:18 amRNSHolding(s) in Company
7th Jun 20184:35 pmRNSPosting of Annual Report, Accounts and AGM Notice
6th Jun 20189:29 amRNSHolding(s) in Company
1st Jun 20187:00 amRNSProactive Investors Forum: Corporate Presentation
31st May 20187:00 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.