Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTLOU ENERGY Regulatory News (TLOU)

Share Price Information for TLOU ENERGY (TLOU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 1.90
Ask: 2.20
Change: 0.05 (2.50%)
Spread: 0.30 (15.789%)
Open: 2.00
High: 2.05
Low: 2.00
Prev. Close: 2.00
TLOU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

6 Nov 2018 07:00

RNS Number : 4138G
Tlou Energy Ltd
06 November 2018
 

6 November 2018

 

Tlou Energy Limited

 

("Tlou" or "the Company")

 

Operations Update

 

 

Tlou Energy Limited, the ASX, AIM and BSE listed company focused on developing gas-to-power projects in southern Africa using coal bed methane ("CBM") natural gas from its gas field in Botswana, is pleased to provide an update on field operations at its Lesedi CBM project.

 

Key Points:

· Vertical well 'Lesedi 3P' has been drilled and reached a total depth of 575m

· Drilling has commenced at the second vertical well 'Lesedi 4P' which was spudded on 4 November 2018

· Program aims to provide gas flow data in the area where the initial project development is proposed

 

Update of Drilling operations

As previously announced Tlou Energy Limited commenced drilling operations at the Lesedi CBM Project ('Lesedi'), with the first well, 'Lesedi 3P' being spudded on 16 October 2018. This vertical production well has been drilled successfully and reached a total depth of 575m.

 

Wireline logs were acquired over the open hole interval of Lesedi 3P. The well intersected the Lower Morupule coal seam, which is the target seam for dual lateral wells, planned to be drilled for approximately 700m in-seam, which will then intersect with Lesedi 3P.

 

The rig was released from location on Friday 2 November and then set up at the Lesedi 4P location. Lesedi 4P was spudded on 4 November 2018. Operations at Lesedi 4P will follow the same program as for Lesedi 3P. The well is planned to be drilled to a proposed total depth of approximately 580m.

 

Background on Drilling program

Tlou will drill the Lesedi production wells as 'dual lateral pods', comprising a single vertical production well intersected by two lateral wells. This will be followed by production testing with the potential to ultimately convert a significant portion of the currently established gas resources to reserves and to deliver gas to a proposed central processing facility and power station located in close proximity.

 

The vertical wells along with the top-hole (vertical) sections of the lateral wells are being drilled first. Thereafter, the lateral sections of the wells will be drilled using specialist directional drilling equipment.

 

Once drilled, the wells will then be completed using a separate workover rig and surface facilities installed. Production start-up is targeted to commence in early 2019. The wells will be on production for an extended period of time to de-water and lower the pressure in the coal seam to achieve gas flow.

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

For further information regarding this announcement please contact:

 

Tlou Energy Limited

+61 7 3012 9793

Tony Gilby, Managing Director

Solomon Rowland, General Manager

Grant Thornton (Nominated Adviser)

+44 (0)20 7383 5100

Samantha Harrison, Colin Aaronson, Harrison Clarke

Shore Capital (Broker)

+44 (0) 207 408 4090

Jerry Keen, Toby Gibbs, Mark Percy

FlowComms Limited (Investor Relations)

+44 (0) 7891 677 441

Sasha Sethi

 

Company Information

Tlou Energy is focused on delivering Gas-to-Power solutions in Botswana and southern Africa to alleviate some of the chronic power shortage in the region. Tlou is developing projects using coal bed methane ("CBM") natural gas. Botswana has a significant energy shortage and generally relies on expensive imported power and diesel generation to fulfil its power requirements. As 100% owner of the most advanced gas project in the country, the Lesedi CBM Project, Tlou Energy provides investors with access to a compelling opportunity using domestic gas to produce power and displace expensive diesel and imported power.

 

The Company is listed on the Australian Securities Exchange, London's AIM market and the Botswana Stock Exchange and is led by an experienced Board, management and advisory team including individuals with successful track records in the CBM industry.

 

Since establishment, the Company has significantly de-risked the project in consideration of its goal to become a significant gas-to-power producer. The Company flared its first gas in 2014, holds a Mining Licence and nine Prospecting Licences, covering an area of ~8,300Km2 in total. The Lesedi and Mamba Projects already benefits from significant independently certified Contingent Gas Resources of ~3 trillion cubic feet (3C) and independently certified Gas Reserves of 41 billion cubic feet (2C) and ~426 billion cubic feet (3P).

 

The Company is planning an initial scalable gas-to-power project. Following successful implementation of this first scalable project, the Company looks forward to evaluating longer-term prospects for the delivery of electricity generated from CBM in Botswana to neighbouring countries.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFKPDNDBDBFDK
Date   Source Headline
31st Aug 20177:00 amRNSMining Licence Terms
24th Aug 20177:00 amRNSRequest for Proposal Submission Date Extended
21st Aug 20177:00 amRNSMining Licence Awarded
20th Jul 20173:06 pmRNSCorporate Presentation
19th Jul 20177:00 amRNSOPERATIONAL REPORT - QUARTER ENDING 30 JUNE 2017
13th Jul 20173:07 pmRNSTender Submission Closing Date confirmed
12th Jul 20177:00 amRNSDirector Appointment
3rd Jul 20177:00 amRNSMining licence application and RFP submission
22nd Jun 20177:00 amRNSDirector Appointment
20th Jun 20177:00 amRNSFirst gas to power generation
31st May 20177:00 amRNSUpdate on seismic survey
10th May 20177:00 amRNSNew Corporate Presentation
28th Apr 20177:00 amRNSOperational report quarter ending 31 March 2017
27th Apr 20177:01 amRNSChange of director interests
26th Apr 20177:00 amRNSFinal SPP and additional placement announcement
18th Apr 20177:00 amRNSShare Purchase Plan Offer Booklet
12th Apr 20172:17 pmRNSIPC Partnership with African Investment Management
11th Apr 20177:00 amRNSExtension to SPP announcement
4th Apr 20177:00 amRNSUpdate on earthquake in Botswana
3rd Apr 20177:00 amRNSLicence renewal
30th Mar 20172:50 pmRNSINTERVIEW WITH CEO OF IPC
29th Mar 20177:00 amRNSNew Corporate Presentation
24th Mar 20177:00 amRNSEquity Placement and Share Purchase Plan
9th Mar 20177:00 amRNSResults of SRK report
2nd Mar 201711:24 amRNSAppointment of Shore Capital as Joint Broker
27th Feb 201712:12 pmRNSDevelopment partner for CBM to Power Project
20th Feb 20177:00 amRNSInterim Results
15th Feb 20177:00 amRNSReserves Upgrade
10th Feb 20177:00 amRNSPerformance Rights Update
31st Jan 20177:00 amRNSOPERATIONAL REPORT QUARTER ENDING 31 DECEMBER 2016
10th Jan 20177:00 amRNSRequest for Proposal received
22nd Dec 20167:00 amRNSBOARD OF DIRECTORS UPDATE
5th Dec 20167:00 amRNSCORPORATE PRESENTATION
1st Dec 20167:00 amRNSProject Update
28th Nov 20167:00 amRNSCO-OPERATION AGREEMENT EXTENDED
10th Nov 20167:00 amRNSResults of Annual General Meeting
28th Oct 20167:00 amRNSOPERATIONAL REPORT - QUARTER ENDING 30 SEPTEMBER
20th Oct 20169:51 amRNSAppendix 4G
12th Oct 20167:24 amRNSInitial independent gas reserve certification
11th Oct 20167:54 amRNSAnnual Report
10th Oct 20167:00 amRNSNotice of Annual General Meeting
29th Sep 20167:00 amRNSEnvironmental Impact Statement Approved
22nd Sep 20167:00 amRNSTR-1: Notification of Major Interest in Shares
13th Sep 20164:40 pmRNSSecond Price Monitoring Extn
13th Sep 20164:35 pmRNSPrice Monitoring Extension
13th Sep 20163:30 pmRNSChange of Director Interests
13th Sep 20162:17 pmRNSFinal Results
8th Sep 20168:06 amRNSASX Appendix 3B and Section 708A Notice
5th Sep 20168:18 amRNSTR-1: Notification of Major Interest in Shares
31st Aug 20167:00 amRNSTlou completes oversubscribed equity placement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.