Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.00 (0.00%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Thor to Develop Gold Operation at Spring Hill

24 Jun 2013 07:00

RNS Number : 6716H
Thor Mining PLC
24 June 2013
 

24 June 2013

THOR MINING PLC

 

THOR TO DEVELOP GOLD OPERATION - SPRING HILL PROJECT

 

The Directors of Thor Mining PLC ("Thor") (AIM, ASX: THR) are pleased to announce that it is preparing for mine development, commencing within 12 months, following positive results of a study to extract near surface oxide ore from the Spring Hilgold project south of Darwin in Australia's Northern Territory.

 

Since signing a Memorandum of Understanding (MOU) for the toll treatment of gold ore with Crocodile Gold Australian Operations Pty Ltd, a subsidiary of Toronto-listed Crocodile Cold Corporation (TSX "CRK") and announced on 10th April 2013, Thor, with co-venturer Western Desert Resources (WDR), has been developing a proposal to accelerate development at Spring Hill. An opportunity has been identified which may expedite early environmental and regulatory approval to mine shallow oxidised ore by constraining the initial mine plan to extract only near surface oxide material for processing off-site. Mining of deeper transition and primary ore will be subject of subsequent studies and approval applications.

 

Highlights:

·; Notice of Intent (NOI) lodged with the Northern Territory Department of Mines and Energy.

·; Initial ore extraction from near surface oxide portion of the resource.

·; Plan for up to 900,000 tonnes of ore yielding between 40,000 and 45,000 ounces of gold over a 2 - 3 year period.

·; Ore to be delivered to Crocodile Gold Union Reefs processing plant for treatment.

·; Capital cost estimate below A$5million.

·; Economic studies and permitting for mining deeper primary ore will continue.

 

A pit optimisation study by independent consultants AVCS Pty Ltd has determined that 900,000 tonnes of ore from the upper portions of the resource are economic based upon criteria outlined in Table 1. below.

This represents a portion of the resource predominantly in the zone of oxidation, which is selected on economic criteria, and also because the environmental approvals process may reduce if waste material mined (along with the ore) and stored in nearby waste dumps, does not contain primary (potentially acid forming) material.

It is intended that economic studies and permitting will continue for the subsequent mining of the deeper transition and primary ore.

Further drilling is also planned to delineate additional, low cost near surface mineralisation

 

Table 1: Key Operating and Financial Assumptions (base case)

Mining

Ore mined

880,000

tonnes

Ore cut-off grade

0.8

grams / tonne

Diluted ore grade mined

1.56

grams / tonne

Waste mined

1,970,000

tonnes

Stripping ratio

2.2 : 1

Processing

Ore transported to Union Reefs & processed

880,000

tonnes

Feed grade

1.56

grams / tonne

Metallurgical recovery

90%

Ounces recovered

41,300

Financial Assumptions / Outcomes

US$ Gold price

US$1,400

per ounce

A$ / US$ exchange rate

0.95

A$ Gold price

A$1,473

per ounce

Mining costs (ore and waste)

A$4:00

per tonne

Processing costs

A$33:00

per tonne

Total Operating costs

A$1,170

per ounce

Capital Cost

Less than A$5 million

 

The capital estimate of less than A$5 million has not been subject to detailed engineering, however the project does not require the construction and provision of processing plant and camp facilities, as these are included in operating estimates for toll treatment and contract supply estimates. The principal capital expenditure requirements are the establishment of a waste dump, some minor pads, the establishment of a road from the pit to existing tracks (approximately 1 kilometre) and the upgrading of those tracks (approximately 3.5 kilometres) to the point where they meet existing public roads.

 

A Notice of Intent (NOI) has been prepared and lodged with the Northern Territory Department of Mines and Energy in respect of the proposed development at Spring Hill. Assessment of the NOI will determine the level of environmental and other regulatory compliance required, and therefore, an estimate of approval timing. While this process should not be underestimated, it is anticipated that a proposed mining operation which does not require a processing plant, has no requirement for a tailings storage facility, and is not expected to generate acidic liquor from waste dumps will face comparatively fewer environmental hurdles.

 

About the Spring Hill Gold Project

The Spring Hill project is located approximately 150 km south of Darwin in Australia's Northern Territory. The location is served by all-weather access and is in close proximity to the sealed arterial Stuart Highway, and other local infrastructure.

 

Thor holds a 51% equity interest in the Spring Hill project, and is exercising rights to increase that interest to 80%.

 

Table 2: Undiluted Resource Estimate(6.9 million tonnes @ 1.74g/t gold Cutoff grade 0.7 g/t)

Category

Measured

Indicated

Inferred

--------- Total --------

Tonnes (Mt)

Grade g/t

 Au

Tonnes (Mt)

Grade g/t

Au

Tonnes (Mt)

Grade g/t

Au

Tonnes (Mt)

Grade g/t

Au

Contained Gold

(K oz)

Zone of Oxidation

-

-

3.14

1.59

-

-

3.14

1.59

161

Transition Zone

-

-

0.87

1.78

-

-

0.87

1.78

50

Unweathered Zone

-

-

2.94

1.89

-

-

2.94

1.89

178

Total

-

-

6.95

1.74

-

-

6.95

1.74

389

Thor Mining PLC holds equity rights to 80% of this resource, including current 51% project ownership.

Estimate: McDonald Speijers, November 2012

 

Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said:

 

"This is an opportunity to achieve an attractive early return from a very modest investment in Spring Hill, with plenty of scope to further exploit this resource in the future. This does not detract from our work at Molyhil which remains a key project for Thor, and where optimisation work is continuing. We are also pleased to note a 25% increase in tungsten prices so far this year and the recent weakening of the Australian dollar against the US currency, both of which are positive for the economic outcomes for Molyhil"

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Colin Aaronson/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters

 

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

Competent Persons Statements

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The information in this report that relates to the Spring Hill Mineral Resource is based on information compiled by Diederik Speijers who is a Fellow of The Australasian Institute of Mining and Metallurgy and published on 20 November 2012. Mr Speijers is the principal of consulting firm McDonald Speijers. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Diederik Speijers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFIMATMBATMMJ
Date   Source Headline
6th Nov 20175:20 pmRNSAppendix 3B
3rd Nov 20173:59 pmRNSDirector/PDMR Shareholding
3rd Nov 201712:55 pmRNSDirector/PDMR Shareholding
2nd Nov 20172:36 pmRNSDirector/PDMR Shareholding
2nd Nov 20179:50 amRNSDirector Option Exercise Raising £125,000
1st Nov 20177:00 amRNSQUARTERLY REPORT JULY TO SEPTEMBER 2017
30th Oct 20177:10 amRNSIMPROVED ORE SORT RESULTS BOOST MOLYHIL
20th Oct 20171:44 pmRNSFINANCING AND STRATEGIC UPDATE
12th Oct 20171:36 pmRNSAMENDED ANNOUNCEMENT - DRILLING AT PILOT MOUNTAIN
6th Oct 20179:44 amRNSDRILLING SUCCESS AT PILOT MOUNTAIN PROJECT
29th Sep 201710:35 amRNSFinal Results
20th Sep 20177:00 amRNSCorporate Presentation Update
19th Sep 20179:29 amRNSCOMPLETION OF DRILLING AT PILOT MOUNTAIN - NEVADA
13th Sep 201712:23 pmRNSDEVELOPMENT ASSESSMENT PLAN-KAPUNDA COPPER PROJECT
31st Aug 201711:57 amRNSINITIAL ROYALTY PAYMENT - SPRING HILL PROJECT
30th Aug 20177:00 amRNSTUNGSTEN & COPPER INTERCEPTS AT DESERT SCHEELITE
17th Aug 20179:22 amRNSTUNGSTEN COPPER AND ZINC INTERSECTED AT GOOD HOPE
14th Aug 201710:00 amRNSTUNGSTEN EXPANSION DRILLING - SUPPLEMENTARY ADVICE
10th Aug 20178:22 amRNSTUNGSTEN EXPANSION DRILLING - PILOT MOUNTAIN
3rd Aug 201710:16 amRNSDirector/PDMR Shareholding
1st Aug 20179:23 amRNSAGREEMENT TO CO-INVEST IN COPPER PROJECT
1st Aug 20177:25 amRNSQUARTERLY REPORT APRIL TO JUNE 2017
31st Jul 20177:00 amRNSUS LITHIUM OPTION - PROGRESS UPDATE
28th Jul 201710:30 amRNSDirector/PDMR Shareholding
28th Jul 201710:20 amRNSAppendix 3B
27th Jul 201710:00 amRNSResult of General Meeting
13th Jul 201712:29 pmRNSUPDATE ON 25% STAKE IN US LITHIUM PROJECTS
7th Jul 201710:53 amRNSNOTICE OF GENERAL MEETING
7th Jul 20177:06 amRNSSTRATEGIC OUTLOOK UPDATE
4th Jul 20177:00 amRNSGRANTING OF ADDITIONAL EXPLORATION LICENCE AREA
27th Jun 20171:06 pmRNSDirector/PDMR Shareholding
27th Jun 201711:55 amRNSAppendix 3B - Grant of Warrants
26th Jun 201711:43 amRNSDirector/PDMR Shareholding
20th Jun 20172:00 pmRNSPLACEMENT TO FUND EXPLORATION PROGRAMS
19th Jun 201711:56 amRNSDundas Gold Project - Completion of Drill Program
14th Jun 20172:30 pmRNSSigning of the Share Purchase Agreement
14th Jun 20172:30 pmRNSAgreement to Aquire 25% of US Lithium Explorer
14th Jun 201711:03 amRNSDundas Gold Project- Commencement of Drill Program
5th Jun 20177:00 amRNSDirector/PDMR Shareholding
24th May 20174:06 pmRNSDirector/PDMR Shareholding
23rd May 201712:30 pmRNSDirector/PDMR Shareholding
22nd May 20172:45 pmRNSDirector/PDMR Shareholding
22nd May 20177:00 amRNSTungsten Resource Increase at Pilot Mountain
4th May 20179:32 amRNSDirector/PDMR Shareholding
28th Apr 20177:00 amRNSQUARTERLY REPORT JANUARY TO MARCH 2017
21st Apr 20179:38 amRNSDRILL ASSAY RESULTS
11th Apr 20178:03 amRNSExercise of warrants
31st Mar 201710:16 amRNSProject Q & A Discussion
31st Mar 20177:00 amRNSDirector Appointment and Option Awards
20th Mar 20179:12 amRNSAppendix 3B

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.