Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.00 (0.00%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

RC Drilling Program Commences at Ragged Range

21 Jun 2022 07:00

RNS Number : 6053P
Thor Mining PLC
21 June 2022
 

21 June 2022

 

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR

 

 

Thor Mining PLC

 

("Thor" or the "Company")

 

Ragged Range Project, WA

3,000m RC Drilling Program Commences

 

The directors of Thor Mining Plc ("Thor") (AIM, ASX: THR, OTCQB: THORF) are pleased to announce the commencement of a drilling program at the Company's 100% owned Ragged Range Project, located in Eastern Pilbara, Western Australia.

Project highlights:

§ Approximately 3,000m reverse circulation ("RC") drilling program commences.

§ Drilling is designed to test both structural and geochemical targets along the Sterling Prospect 13km gold corridor, defined by robust soil and stream anomalies, following the first phase of drilling completed in December 2021.

§ Drilling is targeting interpreted dilational zones associated with faulting and folding along the regional thrust faulted contact between the mafic and ultramafic units (Figure 1).

§ Drilling program also includes 1-3 drillholes at the Krona Prospect to test electromagnetic ("EM") conductor recently identified beneath the nickel gossan (AIM:THR 17 June 2022).

§ Concurrent to the drilling program, regional geochemical sampling and mapping will continue over the Kelly's copper-gold area in the northeast of tenure (E46/1393).

 

Photo Plate 1: Drilling rig tramming to site, Sterling prospect, Ragged Range may be viewed via the following link:

http://www.thormining.com/sites/thormining/media/banners/photo-djc-rig.jpg

 

Nicole Galloway Warland, Managing Director of Thor Mining, commented:

"It's exciting to be commencing our second phase of RC drilling at the Sterling Prospect, Ragged Range, including drill testing the recently identified EM conductor beneath the nickel gossan, at the Krona Prospect.

"These are robust geochemical targets associated with key structural features defined by Thor, associated with the regional thrust faulted mafic -ultramafic contact within the Kelly Greenstone Belt.

"We look forward to updating the market as results come through."

Figure 1 : Sterling and Krona prospects highlighting drilling traverses may be viewed via the following link: http://www.thormining.com/sites/thormining/media/maps/rr_proprc_fig.png

Figure 2: Tenement and Prospect Location Plan may be viewed via the following link: http://www.thormining.com/sites/thormining/media/maps/20-004-1B-Ragged-Range-Location.jpg

 

Figure 3: Tenement Location Plan overlying GSWA 1:500k geology showing the gossan position, Krona Prospect adjacent to the Sterling prospect 13km gold trend may be viewed by the following link: http://www.thormining.com/sites/thormining/media/maps/tenure_krona-prospect.jpg

 

RC Drilling Program

A follow up RC drilling program at Sterling Prospect, Ragged Range has commenced (Figure 2 and Figure 3).

This second phase of drilling is designed to test dilational zones (potential trap sites for mineralisation and the interpreted source of the gold anomalies found in stream and soil samples). Surface anomalism is associated with a series of faults and folds, subparallel or at a high angle to the regional thrust faulted contact (Norman Cairns Fault) between the Euro Basalt and the Dalton Suite ultramafics along the Sterling Prospect 13km gold corridor (Figure 1, 2 and 3).

Approximately 40 drillholes for 3,000m are designed to cover these key structures and gold anomalies, with drill holes generally angled -60 degrees toward the west, near perpendicular to the structural controls of the dominant faulted contact between the Euro Basalt and the Dalton Suite ultramafics (Figure 1 and Figure 3). Drill depths will range from approximately 60-120m.

Figure 3 shows the planned drill traverses. Two drill traverses (labelled 1 and 5) will test the major thrust contact, mapped by the GSWA as the Norman Cairns Fault. Traverses 3 and 4 are designed to cross a major anticlinal axis and intense partly recumbent shearing and faulting in the Euro Basalt, close to the contact. Photograph 2 shows one of these faults in the field.

 

Photo Plate 2: Fault splay at Sterling North may be viewed via the following link:

http://www.thormining.com/sites/thormining/media/maps/photo-fault-splay.jpg

 

Traverses 6 and 7 will test structural contacts of the Euro Basalt. These are distinctive zones with both quartz veining and iron oxide seen at surface. Traverse 2 will test a dilation zone located in "the kink" where sinistral strike slip movement has led to multiple quartz veining, and surficial magnesite in a highly altered basalt unit. Traverses 8 and 9 target a significant fault splay that can been traced for many kilometres to the East. This fault is ironrich with anomalous arsenic (As) up to 1,000ppm. Stream sediment gold anomalies can be sourced to this area.

As part of the drilling program, one to three drill holes are planned to drill test the FLEM conductor identified below the nickel gossan at Krona Prospect (Figure 1 and Figure 2).

DJC Drilling Pty Ltd has been contracted to complete the RC drilling program. The 3,000m program is anticipated to take four weeks, with samples being freighted to Bureau Veritas laboratory in Adelaide, SA, for analysis.

 

Next Steps

Concurrent with the drilling program, mapping and geological sampling will be undertaken around the copper-gold Kelly/Ryan's prospect areas (Figure 2), focusing along strike of high-grade copper-gold historic workings.

Airborne magnetic/radiometric survey to be flown over the eastern portion of the tenure, including E46/1340 and E46/1393.

 

Sterling Prospect

Since acquiring the Ragged Range project in late 2019, Thor has completed a series of systematic stream sediment programs over the tenure and an airborne magnetic survey, defining a 13km structurally controlled gold corridor - the Sterling Prospect (Figure 2). High-grade gold stream results, including up to 2.2g/t Au, were reported from sampling in 2019 and 2020 (THR:AIM announcement 23/06/2021).

https://www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210623-ragged-range-exploration-update.pdf

As a follow up, two soil programs were completed over Sterling Central and Sterling South areas with BLEG soil values up to 348ppb and 153ppb Au (21RRS777 and 21RRS437 respectively), significantly above a background of approximately 5ppb Au (Figure 3 and Figure 4). To validate these high gold soil anomalies, a 74.1g/t Au (Samples 21RRST016) approximately 100m down slope, in a small creek from soil sample 21RRS777 (AIM:THR 7 October 2021).

https://www.thormining.com/sites/thormining/media/pdf/asx-announcements/20211007-asx-ragged-range-infill-soil-results-.pdf

The surface gold anomalism generally strikes slightly oblique to the Euro Basalt and Dalton Suite contact suggesting that gold mineralisation is controlled by faults and structures that splay off this major structure.

 

This announcement is authorised for release to the market by the Board of Directors.

 

For further information, please contact:

 

Thor Mining PLC 

Nicole Galloway Warland, Managing Director

Ray Ridge, CFO / Company Secretary

Tel: +61 (8) 7324 1935

Tel: +61 (8) 7324 1935

WH Ireland Limited (Nominated Adviser and Joint Broker)

Tel: +44 (0) 207 220 1666

Jessica Cave / Darshan Patel / Megan Liddell

SI Capital Limited (Joint Broker)

Tel: +44 (0) 1483 413 500

Nick Emerson

 

Yellow Jersey (Financial PR)

thor@yellowjerseypr.com

Sarah Hollins / Henry Wilkinson

Tel: +44 (0) 20 3004 9512

 

 

Competent Persons Report

The information in this report that relates to Geophysical Exploration Results is based on information compiled by Kim Frankcombe, a Competent Person who is a Member of The Australian Institute of Geoscientists. Mr Frankcombe is employed as a Consultant to the Company through geophysical consultancy. Mr Frankcombe has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Frankcombe consents to the inclusion in the report of the matters based on his information and the form and context in which it appears.

 

The information in this report that relates to Geological interpretation and Exploration Results is based on information compiled by Nicole Galloway Warland, who holds a BSc Applied geology (HONS) and who is a Member of The Australian Institute of Geoscientists. Ms Galloway Warland is an employee of Thor Mining PLC. She has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Nicole Galloway Warland consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

 

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's Twitter page @ThorMining.

 

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's Twitter page @ThorMining

 

About Thor Mining PLC

Thor Mining PLC (AIM, ASX: THR; OTCQB: THORF) is a diversified resource company quoted on the AIM Market of the London Stock Exchange, ASX in Australia and OTCQB Market in the United States.

The Company is advancing its diversified portfolio of precious, base, energy and strategic metal projects across the USA and Australia. Its focus is on progressing its copper, gold, uranium and vanadium projects, while seeking investment/JV opportunities to develop its tungsten/molybdenum assets.

Thor owns 100% of the Ragged Range Project, comprising 92 km2 of exploration licences with highly encouraging early-stage gold and nickel results in the Pilbara region of Western Australia, with follow up drilling planned for 2022.

At Alford East in South Australia, Thor is earning an 80% interest in copper deposits considered amenable to extraction via In Situ Recovery techniques (ISR). In January 2021, Thor announced an Inferred Mineral Resource Estimate of 177,000 tonnes contained copper & 71,000 oz gold¹.

Thor also holds a 30% interest in Australian copper development company EnviroCopper Limited, which in turn holds rights to earn up to a 75% interest in the mineral rights and claims over the resource on the portion of the historic Kapunda copper mine and the Alford West copper project, both situated in South Australia, and both considered amenable to recovery by way of ISR.²³

Thor holds 100% interest in two private companies with mineral claims in the US states of Colorado and Utah with historical high-grade uranium and vanadium drilling and production results.

Thor holds 100% of the advanced Molyhil tungsten project, including measured, indicated and inferred resources⁴, in the Northern Territory of Australia, which was awarded Major Project Status by the Northern Territory government in July 2020. Drilling in November December 2021 intersected strike extensions to the main ore zone.

Adjacent to Molyhil, at Bonya, Thor holds a 40% interest in deposits of tungsten, copper, and vanadium, including Inferred resource estimates for the Bonya copper deposit and the White Violet and Samarkand tungsten deposits.

Notes

1 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210127-maiden-copper.gold-estimate-alford-east-sa.pdf

2 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20172018/20180222-clarification-kapunda-copper-resource-estimate.pdf

³ www.thormining.com/sites/thormining/media/aim-report/20190815-initial-copper-resource-estimate---moonta-project---rns---london-stock-exchange.pdf

 4 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210408-molyhil-mineral-resource-estimate-updated.pdf  

5 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20200129-mineral-resource-estimates---bonya-tungsten--copper.pdf

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFBMATMTATMBT
Date   Source Headline
1st Nov 201910:26 amRNSNotice of AGM
31st Oct 20197:00 amRNSQUARTERLY REPORT JULY TO SEPTEMBER 2019
31st Oct 20197:00 amRNSAPPENDIX 5B JULY TO SEPTEMBER 2019
29th Oct 20198:13 amRNSAppendix 3B
22nd Oct 20192:05 pmRNSSecond Price Monitoring Extn
22nd Oct 20192:00 pmRNSPrice Monitoring Extension
22nd Oct 20197:00 amRNSPlacing and Subscription
17th Oct 20195:33 pmRNSStatement re Share Price Movement
14th Oct 20197:00 amRNSReceipt of Additional Vendor Shares in Hawkstone
14th Oct 20197:00 amRNSCommencement of Drilling - Bonya Tungsten
10th Oct 20197:00 amRNSMolyhill Mineral Resource Estimate Enhanced
30th Sep 20191:05 pmRNSFinal Results
30th Sep 20197:00 amRNSHawkstone - Maiden Mineral Resource Estimate
27th Aug 20197:00 amRNSDirector Appointment
19th Aug 20199:34 amRNSLithium Results at Big Sandy - Hawkstone Mining
15th Aug 20197:00 amRNSInitial Copper Resource Estimate - Moonta Project
14th Aug 20197:49 amRNSReceipt of R&D Grant
12th Aug 20198:01 amRNSFurther High Grade Bulk Sample Assays - Molyhil
5th Aug 20197:00 amRNSASX query and response
30th Jul 20197:00 amRNSQUARTERLY REPORT APRIL TO JUNE 2019
30th Jul 20197:00 amRNSAPPENDIX 5B APRIL TO JUNE 2019
23rd Jul 201910:28 amRNSFurther Lithium Results - Hawkstone's Big Sandy
8th Jul 20197:00 amRNSAppointment of Joint Broker
5th Jul 20197:40 amRNSAppendix 3B
3rd Jul 20197:00 amRNSJervois Vanadium Project
1st Jul 20197:00 amRNSIssue of Equity
28th Jun 20199:18 amRNSFurther Lithium Results - Hawkstone's Big Sandy
28th Jun 20199:08 amRNSBonya - High Grade Tungsten Confirmed - Addendum
25th Jun 20197:00 amRNSPilot Mountain Gold Sampling
24th Jun 20197:00 amRNSBonya - High grade tungsten results confirmed
14th Jun 20199:27 amRNSPilot Mountain initial gold finding clarification
13th Jun 20197:00 amRNSResponse to ASX Price Query
10th Jun 201912:00 pmRNSPilot Mountain process sample initial gold finding
6th Jun 20197:00 amRNSHigh Grade Molyhil bulk sample assay results
28th May 20197:00 amRNSInvestor Presentation
23rd May 20199:35 amRNSResult of General Meeting
23rd May 20199:35 amRNSAppendix 3B
15th May 201912:16 pmRNSLithium Results at Hawkstone's Big Sandy Deposit
7th May 20197:00 amRNSFurther Interim Tungsten & Copper Results - Bonya
30th Apr 20198:55 amRNSNotice of GM
30th Apr 20198:29 amRNSInterim Drill Results - Bonya Tungsten
29th Apr 20197:00 amRNSQUARTERLY REPORT JANUARY TO MARCH 2019
29th Apr 20197:00 amRNSAPPENDIX 5B JANUARY TO MARCH 2019
23rd Apr 20197:00 amRNSResource Estimate Commissioned - Moonta Copper
16th Apr 20197:00 amRNSCommencement of Drilling - Bonya Tungsten
10th Apr 20199:43 amRNSAppendix 3B
2nd Apr 20198:41 amRNSKapunda Gold Recovery
27th Mar 20199:06 amRNSStrategic Australian Acquisitions and Financing
25th Mar 20191:27 pmRNSClearance for Drilling - Bonya Tungsten
8th Mar 20197:00 amRNSCopper Project Q & A - March 2019

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.