Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.20
Bid: 1.10
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.20 (18.182%)
Open: 1.20
High: 1.20
Low: 1.20
Prev. Close: 1.20
THR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Jervois Vanadium Project

3 Jul 2019 07:00

RNS Number : 3195E
Thor Mining PLC
03 July 2019
 

3 July 2019

 

JERVOIS VANADIUM PROJECT

DEVELOPMENT PLAN

The Board of Thor Mining Plc ("Thor") (AIM, ASX: THR) is pleased to advise a plan to further advance exploration of and assess potential development options for the Jervois Vanadium Project in the Northern Territory of Australia.

The project is held in joint venture (JV) between Arafura (60%) and Thor (40%) with Thor acting as manager. The plan outlined below has been agreed by both parties to the JV.

Highlights

· Substantial exploration history including 60 RC (reverse circulation) holes drilled between 2006 and 2008 intersecting extensive potentially economic grades of vanadium and titanium.

· Selected samples from 14 holes only, assayed for gold and platinum group elements (PGEs), returned up to 1.59 ppm (grams/tonne) combined gold, plus platinum and palladium.

· Exploration Target range of 90 to 110 million tonnes @ 0.3% - 0.8% V₂O₅, and 4% - 8% TiO₂ determined from 1,295m of assayed mineralisation. The potential quantity and grade of the Exploration Target is conceptual in nature as there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

· Substantial laboratory testwork has demonstrated potential to produce concentrates with grades of 1-2% V₂O₅, which are comparable to others around the globe, with attractive (61-69%) recoveries.

· Future work to focus on; resource drilling the Casper, Coco, and RD (previously known as "Misty") deposits, testing other prospects for potential economic grades of vanadium and titanium, and follow up work on the gold and PGE potential on all prospects. Subject to successful completion of these activities, next steps would include further metallurgical studies, along with environmental and social impact studies.

· The joint venture objective is to seek project level investors to advance this project through resource development and subsequent feasibility and permitting activities.

 

Mick Billing, Executive Chairman of Thor Mining, commented:

"We are excited to have an interest in the Jervois vanadium deposits at a time of stimulated global interest in vanadium."

"Thor acquired an interest in the Jervois vanadium deposits, at no additional cost, with the acquisition of the Bonya tungsten deposits. This has proved to be an unanticipated bonus to that acquisition."

"Vanadium metal has very a robust baseline demand in the construction industry, along with exciting prospects as a potential battery metal where large capacity storage is required"

 

 

Project Location and Access

Jervois is located in the Northern Territory of Australia, approximately 290km east-northeast of and 360km by road (the first 170km sealed) from the nearest city Alice Springs (population 29,000).

Investors wishing to view a map showing the location of the Jervois project may view this on the Company's website via the following link:

http://thormining.com/-/thor/lib/images/maps/Location%20Molyhil%20Bonya%20Jervois.jpg

 

Historical Exploration and Evaluation Activity

Whilst substantial work was performed by others previously, in 2004, Arafura completed a review of all of the previous exploration data available for the Jervois Project area. From this work, the Attutra Metagabbro was identified as an area of interest for Fe/V and Au/PGE potential.

In 2005, Arafura commissioned a high-resolution airborne magnetic/radiometric survey over the project area. This survey highlighted several magnetic targets within the Attutra Metagabbro.

Between November 2006 and June 2008, a total of 60 RC holes for 5,774m were drilled at the Jervois Project (refer to appended drill hole location table). This drilling successfully targeted numerous magnetite rich zones of the Attutra Metagabbro for Fe/V mineralisation.

The original objectives of the exploration drilling programs were to:

· drill test the Casper, Coco and RD magnetic anomalies

o determine continuity and source of these magnetite bodies

o confirm V recovery and variability

o assess the overall size potential and geometry of magnetite bodies that demonstrated a potential for significant V recovery, based on the 2006 results

· determine the amount of intrusive granite and/or pegmatite within the magnetite bodies

· better understand the geological relationships and controls on mineralisation.

 

Investors wishing to view a diagram outlining the known deposits and drill hole locations at Jervois, overlain on an aeromagnetic image may view this on the Company's website via the following link:

http://thormining.com/-/thor/lib/images/maps/Jervois%20Vanadium.jpg

 

During the 2006 drilling campaign, 1m samples were collected and analysed in June 2007 as part of preliminary metallurgical testwork. The samples were composited together into between 1 and 22m composites. These composites were selected based on drill logs, magnetic susceptibility measurements and composite requirements.

The 2008 drilling program was designed to further test and explore the mineralisation. 1m samples were collected and composited together and analysed. Composites of between 2 and 6m were determined for 11 of the 45 holes drilled.

In total, 1,295m of mineralisation was assayed for V₂O₅, TiO₂ and Fe.

Significant drill intersections include:

· 44m @ 0.76% V2O5 & 8.30% TiO₂ in UNRC001 - reported 19 June 2010

· 22m @ 0.77% V2O5 & 8.13% TiO₂ in UNRC002 - reported 19 June 2010

· 21m @ 0.62% V2O5 & 7.56% TiO₂ in UNRC005 - reported 19 June 2010

· 49m @ 0.96% V2O5 & 8.55% TiO₂ in UNRC018 - reported 29 July 2010

· 54m @ 0.72% V2O5 & 6.89% TiO₂ in UNRC019 - reported 29 July 2010

· 50m @ 0.62% V2O5 & 5.65% TiO₂ in UNRC024 - reported 29 July 2010

· 35m @ 0.60% V2O5 & 5.70% TiO₂ in UNRC043 - reported 26 April 2012

· 23m @ 0.50% V2O5 & 5.60% TiO₂ in UNRC044 - reported 26 April 2012

· 34m @ 0.40% V2O5 & 4.40% TiO₂ in UNRC057 - reported 26 April 2012

 

Drilling results reported to ASX by Arafura on 19 June 2007 can be accessed via the following link:

https://www.asx.com.au/asxpdf/20070619/pdf/3130nxq19wp71q.pdf. 

 

Drilling results reported to ASX by Arafura on 29 July 2010 can be accessed via the following link:

https://www.asx.com.au/asxpdf/20100729/pdf/31rkpl7q8yfn81.pdf. 

 

Drilling results reported to ASX by Arafura on 26 April 2012 can be accessed via the following link:

https://www.asx.com.au/asxpdf/20120426/pdf/425v5kmj6n796n.pdf.

 

These significant intersections are spread across four of the known magnetic targets including the Casper, Coco and RD anomalies, with thicknesses and grades in line with known gabbro-hosted vanadium-bearing magnetite elsewhere within Australia.

Composites were also submitted for Davis Tube Recovery ("DTR") analysis. Laboratory testing at grind sizing using 100% passing 75micron typically shows DTR concentrate grades of 61-69% Fe and 1-2% V2O5, considered very acceptable for this type of activity.

A review of the quality and recovery of DTR concentrates reported to ASX by Arafura on 11 July 2007 can be accessed via the following link:

https://www.asx.com.au/asxpdf/20070711/pdf/313dgxv7kvsz9t.pdf.

Significant exploration potential still exists and therefore it is possible to define an Exploration Target based on the knowledge gained from the existing drilling and assaying together with the magnetic data and modelling.

In addition, multiple other prospective magnetic targets remain untested.

Exploration Target

The Exploration Target has been divided into two parts based on the confidence in the expected geology.

 

Table A: Summary of Exploration Target

Target Type

Volume (m3)

Tonnage Range (Mt)*

V2O5% Range

Fe2O3 %

 Range

TiO2 % Range

Known Gabbro Hosted

18,000,000

50 - 60

0.3 - 0.8

25 - 45

4 - 8

Gabbro Below Schist

15,000,000

40 - 50

0.3 - 0.8

25 - 45

4 - 8

Total

33,000,000

90 - 110

0.3 - 0.8

25 - 45

4 - 8

* Totals subject to rounding

The potential quantity and grade of the Exploration Target is conceptual in nature as there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

 

Some of the assumptions made in determining the Exploration Target are:

· Magnetic bodies are sub vertical in nature similar to those modelled and have a mineralised vertical extent of 50m,

· Volumes are determined by multiplying the surface area of each prospect shape by the vertical extent,

· Specific gravity values used to determine the tonnages vary between 3.0 and 3.4 g/cm3,

· The grade ranges for V2O5, Fe2O3 and TiO2 are determined from the range of results for each element from the drilling already undertaken by Arafura.

In 2012, further representative drill intervals of the magnetite mineralisation from Coco and RD magnetic anomalies were tested to determine their Fe-Ti-V mineral potential. Representative sample intervals from Casper, Coco and RD were also selected for Au-Pt-Pd assays.

 

Precious Metal Potential

536 samples from the 2008 drilling were analysed for Au, Pt and Pd. Samples were selected from 14 holes from across the major magnetite rich areas. The samples represented the same magnetite rich intervals that were sampled and analysed for Fe/Ti/V mineralisation.

The precious metal analysis was undertaken on single metre samples as opposed to the composite samples used for the Fe/Ti/V analysis.

Summary of the Precious Metal Analyses

 

All of the mean values are low for the whole population, however, maximum values for Pd in particular provide encouragement that economic levels of mineralisation may be present.

Metal

Max (ppm)

Min (ppm)

Mean (ppm)

n

Au

0.389

0.001

0.013

536

Pd

1.555

0.001

0.074

536

Pt

0.562

0.003

0.034

536

Pd+Pt

1.777

0.003

0.108

536

Au+Pd+Pt

1.808

0.004

0.121

536

 

· RD Prospect

o UNRC052 9m @ 0.52 ppm Au+Pd+Pt from 70m

Incl 2m @ 1.09 ppm from 70m

o UNRC057 10m @ 0.60 ppm Au+Pd+Pt from 47m

Incl 6m @ 0.85 ppm from 51m

 

· Coco Prospect

o UNRC038 9m @ 0.42 ppm Au+Pd+Pt from 0m

 

· Casper Prospect

o UNRC032 47m @ 0.57 ppm Au+Pd+Pt from 26m

Incl 2m @ 1.59 ppm from 26m

Incl 2m @ 1.30 ppm from 32m

Incl 4m @ 1.37 ppm from 69m

 

These results were reported to ASX by Arafura on 26 April 2012 and can be accessed via the following link:

https://www.asx.com.au/asxpdf/20120426/pdf/425v5kmj6n796n.pdf. 

 

Although elevated levels of all three elements were identified, there is little correlation between the higher-grade intersections due to the drill hole spacing and the sample selection process.

However, many of the holes tested are isolated and therefore remain open with regard to the precious metal concentrations. This is the case both up and down dip as well as along strike.

The best example is the large intersection in UNRC032 at the Casper Prospect. Hole UNRC032 occurs at the northern end of the prospect and therefore the mineralisation identified in this hole remains open to the north. Furthermore, no other holes have been assayed for Au, Pd and Pt on this section or the section immediately to the south, leaving room for expansion of this mineralization.

 

Commodity Prices

Prices for each of the commodities at the date of writing this report are extracted from Argus Metals as follows:

· Vanadium - US$34.25/Kg in Ferro vanadium

· Titanium - US$4.60/Kg in Ferro titanium

· Gold - US$1,388 /oz

· Palladium - US$1,549 / oz

· Platinum - US$837 / oz

 

Current and Future Steps

The eastern portion of EL29701 was recently split-off and assigned a new EL number (EL 32167) for the current project. This will facilitate the development of the Jervois Vanadium opportunity separate to other titles in the area.

Planned subsequent steps for the project include the following:

· Resource drilling at Casper, RD, and Coco deposits

· Drill test other deposits identified as magnetic targets

· Follow up gold, and platinum group element intersections

Subject to successful outcomes from these activities, next steps would include detailed metallurgical testwork, and other technical activities, plus environmental and social impact studies aimed at progressing feasibility and mine development permitting.

 

The joint venture parties plan to actively seek third party project investment in the Jervois Vanadium Project, with all potential options under consideration, to take this exciting project opportunity forward.

 

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

Enquiries:

Mick Billing

+61 (8) 7324 1935

Thor Mining PLC

Executive Chairman

Ray Ridge

+61 (8) 7324 1935

Thor Mining PLC

CFO/Company

Secretary

Colin Aaronson/

Richard Tonthat/ Ben Roberts

+44 (0) 207 383 5100

 

Grant Thornton UK LLP

 

Nominated Adviser

Nick Emerson

+44 (0) 1483 413 500

SI Capital Ltd

Joint Broker

David Hignell / Rob Rees 

+44 (0) 20 3470 0470

SP Angel Corporate Finance LLP

Joint Broker

Tim Blythe/ Camilla Horsfall

+44 (0) 207 138 3222

Blytheweigh

Financial PR

 

Competent Person's Report

The information in this report that relates to Exploration Target is based on, and fairly represents, information and supporting documents compiled by Dr Graeme McDonald (BSc(Hons)Geol, PhD). Dr McDonald is a member of the Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute's codes and recommended practices and acts as an independent consultant to Thor Mining PLC. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Dr McDonald consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The information in this report that relates to Exploration Results is based on information compiled by Mr Kelvin Hussey, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Hussey is a full-time employee of Arafura Resources Limited. Mr Hussey has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hussey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

 

 

 

Drillhole collar location summary

Hole ID

MGA94E

MGA94N

RL

AzimuthGrd

Inclination

EOH

UNRC001

640345

7494899

303

360

-90

60

UNRC002

640475

7494996

299

360

-90

66

UNRC003

640862

7494951

297

360

-90

82

UNRC004

640179

7496122

310

360

-90

50

UNRC005

640501

7496200

300

360

-90

67

UNRC006

640538

7496349

300

360

-90

70

UNRC007

640538

7496652

299

360

-90

74

UNRC008

640241

7496947

300

360

-90

73

UNRC009

637299

7496702

330

360

-90

25

UNRC010

637315

7496619

329

360

-90

65

UNRC011

635590

7496501

327

360

-90

55

UNRC012

635640

7496301

331

360

-90

40

UNRC013

640950

7495649

297

360

-90

70

UNRC014

641200

7494201

297

360

-90

70

UNRC015

637751

7499499

307

360

-90

70

UNRC016

638974

7498294

300

270

-90

40

UNRC017

639200

7497900

300

270

-90

91

UNRC018

640350

7494900

303

270

-60

72

UNRC019

640400

7494900

301

270

-60

75

UNRC020

640450

7494900

300

270

-60

120

UNRC021

640500

7494900

299

270

-60

114

UNRC022

640400

7495000

300

270

-90

100

UNRC023

640450

7495000

299

270

-60

114

UNRC024

640500

7495000

298

270

-60

114

UNRC025

640550

7495000

298

270

-60

114

UNRC026

640600

7495000

298

270

-60

114

UNRC027

640450

7495100

299

270

-60

114

UNRC028

640500

7495100

299

270

-60

114

UNRC029

640550

7495100

299

270

-60

118

UNRC030

640450

7495200

299

270

-90

100

UNRC031

640500

7495200

299

270

-60

114

UNRC032

640550

7495200

298

270

-60

114

UNRC033

640600

7495200

298

270

-60

114

UNRC034

640650

7495200

298

270

-60

114

UNRC035

640700

7495200

298

270

-60

114

UNRC036

640400

7496200

301

270

-90

100

UNRC037

640450

7496200

301

270

-60

114

UNRC038

640500

7496200

300

270

-60

114

UNRC039

640550

7496200

299

270

-60

114

UNRC040

640600

7496200

299

270

-60

114

UNRC041

640550

7496300

298

270

-60

115

UNRC042

640600

7496300

299

270

-60

114

UNRC043

640550

7496400

300

270

-60

114

UNRC044

640600

7496400

299

270

-60

120

UNRC045

640500

7496400

300

270

-90

100

UNRC046

640250

7496850

300

270

-90

100

UNRC047

640300

7496850

300

270

-60

97

UNRC048

637650

7499500

307

270

-90

100

UNRC049

637700

7499500

307

270

-60

114

UNRC050

637750

7499500

307

270

-60

114

UNRC051

637800

7499500

307

270

-60

114

UNRC052

637850

7499500

307

270

-60

114

UNRC053

637800

7499400

307

90

-90

100

UNRC054

637750

7499400

307

90

-60

115

UNRC055

637700

7499400

307

90

-60

115

UNRC056

637700

7499300

307

270

-60

114

UNRC057

637750

7499300

306

270

-60

114

UNRC058

637800

7499300

306

270

-60

114

UNRC059

637702

7499298

307

90

-60

96

UNRC060

637700

7499600

307

90

-60

112

 

About Thor Mining PLC

Thor Mining PLC (AIM, ASX: THR) is a resources company quoted on the AIM Market of the London Stock Exchange and on ASX in Australia.

Thor holds 100% of the advanced Molyhil tungsten project in the Northern Territory of Australia, for which an updated feasibility study in August 2018¹ suggested attractive returns.

Adjacent Molyhil, at Bonya, Thor holds a 40% interest in deposits of tungsten, copper, and vanadium, including an Inferred resource for the Bonya copper deposit².

Thor also holds 100% of the Pilot Mountain tungsten project in Nevada USA which has a JORC 2012 Indicated and Inferred Resources Estimate³ on 2 of the 4 known deposits. The US Department of the Interior has confirmed that tungsten, the primary resource mineral at Pilot Mountain, has been included in the final list of Critical Minerals 2018.

Thor is also acquiring up to a 60% interest Australian copper development company Environmental Copper Recovery SA Pty Ltd, which in turn holds rights to earn up to a 75% interest in the mineral rights and claims over the resource on the portion of the historic Kapunda copper mine in South Australia recoverable by way of in situ recovery.

Thor has an interest in Hawkstone Mining Limited, an Australian ASX listed company with a 100% Interest in a Lithium project in Arizona, USA.

Finally, Thor also holds a production royalty entitlement from the Spring Hill Gold project⁵ of:

 A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and

 A$14 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.

 

Notes

¹ Refer ASX and AIM announcement of 23 August 2018

² Refer ASX and AIM announcement of 26 November 2018

³ Refer AIM announcement of 13 December 2018 and ASX announcement of 14 December 2018

 Refer AIM announcement of 10 February 2016 and ASX announcement of 12 February 2018

 Refer AIM announcement of 26 February 2016 and ASX announcement of 29 February 2016

 

JORC Code, 2012 Edition - Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria

JORC Code explanation

Commentary

Sampling techniques

· Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

· Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

· Aspects of the determination of mineralisation that are Material to the Public Report.

· In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

· Reverse circulation drilling with 140mm diameter face sampling hammer was used to obtain samples from one metre drill intervals. Most samples were collected dry although slightly moist samples were occasionally recovered from depth in a few holes.

· Subsamples of approximately 3-6kg were automatically collected at the rig for each drill interval using a three-tier riffle splitter mounted beneath the cyclone.

· Chip tray samples were collected and geologically logged using representative washed and sieved subsamples.

· Samples were collected into pre-numbered plastic (87.5 vol%) and calico (12.5 vol%) bags with sampling integrity monitored by the rig geologist. Calico bags were all double-tied and checked by the geologist to ensure the subsample was secure and prevent any cross-contamination.

· Industry standard QAQC protocols were adopted with field duplicates collected by manually riffle splitting the preserved RC residues at approximately 1 in 20 of the assay sample population.

· Individual samples were dried, coarsely crushed and subsampled at ALS in Alice Springs. A subsample of each sample was sent to ALS Perth for assay/DTR. The remainder of the primary sample was retained in Alice Springs until no longer needed.

Drilling techniques

· Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

· Standard reverse circulation drilling techniques were used and involved either an Edson or Gemco rig mounted on a small 4WD truck with a 140mm diameter face sampling RC hammer boosted by a separate ancillary compressor to ensure adequate air supply.

Drill sample recovery

· Method of recording and assessing core and chip sample recoveries and results assessed.

· Measures taken to maximise sample recovery and ensure representative nature of the samples.

· Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

· Samples were neatly stacked in drilling sequence near the rig to visually estimate and gauge sample recoveries throughout the hole.

· Good sample recovery was obtained in all holes, after the initial collar sample. The ground is generally hard with fresh rock and good drilling conditions were encountered in all areas. Recoveries were consistent across different rock units and in all holes. No drilling biases were observed.

· Samples were mostly collected dry although a few moist samples were recovered. Despite the presence of groundwater in some holes, there was enough air capacity to ensure wet samples were not recovered.

· There is no drill core, so no comment can be made on the loss/gain of fine/coarse material in RC drilling.

Logging

· Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

· Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

· The total length and percentage of the relevant intersections logged.

· RC samples were geologically logged for the entire length of each hole with the data entered on to formatted paper log sheets. The logs have been scanned and data loaded into spreadsheets.

· The mineralised magnetite-rich and unmineralised zones were easily determined based on geological observations and routine hand-held magnetic susceptibility measurements using a KT9 instrument.

· Logging is qualitative for recovery and moisture contents, and quantitative for geological and geophysical logging.

· The median of three separate magnetic susceptibility measurements was recorded for each drill interval. Measurements were made on the outside of the residual RC sample (nominally at the bottom, middle and top of each bag).

· The RC holes hole not been logged by geophysical probes.

Sub-sampling techniques and sample preparation

· If core, whether cut or sawn and whether quarter, half or all core taken.

· If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

· For all sample types, the nature, quality and appropriateness of the sample preparation technique.

· Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

· Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

· Whether sample sizes are appropriate to the grain size of the material being sampled.

· 3-6kg subsamples for laboratory analysis were automatically collected into pre-numbered calico bags using a three-tier (87.5/12.5) riffle splitter mounted beneath the rig cyclone for all primary samples. Similar sized field duplicates were collected using the same riffle splitter at the end of each hole in 2006 (UNRC001-015). A separate 50/50 riffle splitter was used for duplicates from the remainder of the holes.

· The primary and duplicate assay sample size of 3-6kg is appropriate for one metre RC samples of fine to medium grained metamorphic host rocks (igneous and sedimentary) and this style of mineralisation.

· The drilling was interrupted for short periods at each metre interval by pulling back slightly to allow all drill cuttings to be fully recovered for each sample. This quality control prevents the smearing of grade across sample intervals. It also ensures that the recovered sample is representative of that interval and not impacted by the slightly denser nature of the target mineralisation in comparison to the host rocks.

· Samples were composited at the laboratory following instructions from the Competent Person. Composited samples were typically a continuous interval of the same rock type with minimum dilution. Only samples with significant visual magnetite or elevated magnetic susceptibility were assayed.

· Pt, Pd and Au assays were done well after the Fe-V-Ti assays using a subset of individual assay samples from the 2008 program. One metre intervals were selected from one or two holes per prospect, based material that was available at that time.

Quality of assay data and laboratory tests

· The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

· For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

· Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

· Industry standard Davis Tube Recovery (DTR) analyses were completed on composited samples of magnetite mineralisation, and their concentrates were assayed along with an industry standard whole rock assays for the same composite sample interval to assess both recovery and grades.

· DTR procedures for sample preparation were based on test work and recommendations by Promet Engineers. Samples for DTR were initially ground for a period of 120 seconds and then wet sieved to remove the oversized fraction. The oversized material was then re-ground and processed according to set procedures.

· DTR analyses and chemical assays were completed at ALS Chemex Perth on 100% passing 75 micron material using an standard fusion XRF assay technique designed for magnetite-rich Fe-V-Ti mineralisation (ME-XRF11b for Al2O3, Ba, CaO, Cl, Co, Cr2O3, Cu, Fe, K2O, MgO, Mn, Na2O, Ni, P, Pb, S, SiO2, Sn, Sr, TiO2, V, Zn, Zr and LOI at 1000°C by ME-GRA05).

· An external laboratory (NTEL Darwin) was used in the 2006 to address and verify concerns around unrealistic vanadium values and calculated recoveries in the preliminary ALS Chemex report. This was resolved by via standards and re-calibration of the XRF assay suite to suit these high grade vanadium-rich magnetite samples. Samples from 2008 drill program used the same revised assay protocols and calibrations.

· Results have been independently confirmed using fusion XRF methods on check samples and standards at Ultratrace Perth.

· A selection of the individual drill samples from the 2008 drilling program were assayed trace level Pt, Pd and Au using a standard 50g fire assay and ICPMS determination (PGM-ICP24) at Ultratrace Perth.

· Results are supported by laboratory assays of CRM, blanks and duplicates.

Verification of sampling and assaying

· The verification of significant intersections by either independent or alternative company personnel.

· The use of twinned holes.

· Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

· Discuss any adjustment to assay data.

· Significant mineralised intersections have been reported and correspond with visually significant magnetite and elevated magnetic response of recovered samples. Contact geologists and in-house geological staff were present on site and confirmed these significant intersections.

· No holes have been twinned.

· No assay data has been adjusted. The geochemical data has been used to determine recoveries in DTR concentrates.

· Blind field duplicates have been used confirm the sampling and assay results.

Location of data points

· Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

· Specification of the grid system used.

· Quality and adequacy of topographic control.

· Reported locations are based on GDA94 datum and MGA94 Zone 53 coordinates.

· All RC drill collars were pegged and located by hand-held GPS with most locations initially targeting the approximate centre of detailed low-level aeromagnetic RTP anomalies. The reported collar locations were resurveyed on completion as a check and are considered accurate to within about 5m in both northing and easting.

· Collar locations for drill holes UNRC001-UNRC015 were accurately surveyed by a professional surveyor in 2007. Benchmarks were also established at the time.

· The collars for the second round of drilling (UNRC016-UNRC060) were pegged and re-surveyed on completion by hand-held GPS in 2008. The surface RL of these collars were determined by using a dumpy level and looped surveys constrained by previously surveyed drill collars and control points. The loops generally closed to within less than 10mm suggesting the collar RLs are likely to be of a similar accuracy. UNRC016 and UNRC017 were assigned an approximate nominal elevation of 300m consistent with the surrounds.

· No detailed topographic model exists for the area. A gridded DTM is available for the area covered by the detailed aeromagnetic survey.

Data spacing and distribution

· Data spacing for reporting of Exploration Results.

· Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

· Whether sample compositing has been applied.

· 60 vertical and inclined holes have been drilled, including a shallow vertical hole for the camp water supply (UNRC016). The initial drilling used widely-spaced targeted vertical RC drill holes to explore various magnetic anomalies over about a 5km x 5km area (UNRC001-015). The follow up drilling program was mostly concentrated at several prospects and largely 50m spaced collars on 100m spaced east-west sections.

· No Resource or Reserve is being reported.

· Samples were composited for Fe-V-Ti determinations of the magnetite mineralisation, mostly as up to 5 metre intervals.

Orientation of data in relation to geological structure

· Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

· If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

· The relationship between drilling orientation and mineralisation is uncertain, especially at the larger magnetic bodies. Multiply layered, laterally persistent, thin, shallowly dipping magnetite-rich units were observed in surface outcrops near UNRC010 and UNRC011. Vertical drill testing near these outcrops yielded discrete zones of magnetite-rich mineralisation whose intercepts are likely to be close to true widths. Outcrops of massive magnetite occur at the Casper and Coco prospects. These appear to be much larger bodies rather than discrete magnetite layers. Drill sections were designed along east-west sections to intersect the magnetic anomalies at a high angle to their overall magnetic trend.

· Geological observations and drilling indicate the metagabbro locally contains granitic to tonalitic bodies. Field relationships indicate these are intrusive and likely to be detrimental, cutting off magnetite mineralisation.

Sample security

· The measures taken to ensure sample security.

· The project is located in a remote region of the Northern Territory. No unauthorised personnel visited the site during operations. Assay samples were collected from each hole immediately after drilling. Samples were transported to base camp daily for safe storage. Samples were securely packaged and delivered to a secure storage area at Baikal for collection by a transport company to deliver to ALS's preparation facility in Alice Springs. All submitted samples were receipted by the laboratory.

Audits or reviews

· The results of any audits or reviews of sampling techniques and data.

· None

 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

· Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

· The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

· Exploration activities were completed on EL10215. This tenement was granted 100% to Arafura Resources on 6 December 2001. The title was twice renewed before Arafura secured EL29701 over the same area. EL29701 was recently split to form a new tenement, EL32167 which covers the Fe-V-Ti prospects.

· Arafura Resources was the owner/operator and held an approved MMP for the reported exploration activities on EL10215. The area has been since been rehabilitated in accordance with government regulations.

· EL32167 covers parts of Perpertual Pastoral Lease 962, Jervois.

· Arafura holds Work Authority Certificate C2006/080 issued by the Northern Territory Aboriginal Areas Protection Authority. This clearance shows there are no restricted areas or sites of significance near these prospects.

· A Native Title claim exists for the project area and covers the Jinka-Jervois pastoral leases.

Exploration done by other parties

· Acknowledgment and appraisal of exploration by other parties.

· Hunter Resources explored the Attutra Metagabbro in 1987-1989, concentrating on its PGE potential.

· There was no previous drilling at these prospects.

Geology

· Deposit type, geological setting and style of mineralisation.

· The prospects occur in the eastern Arunta Region and are metamorphosed orthomagmatic Fe-V-Ti deposits hosted within magnetite-rich zones of the Attutra Metagabbro. The Attutra Metagabbro intruded into the Bonya Schist at about 1780 Ma and is also intruded by slightly younger granitoids. The region was deformed and metamorphosed during the c. 1720 Ma Strangways Orogenic Event.

Drill hole Information

· A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

· If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

· Plan and table of collar and drill hole information is provided in this release.

Data aggregation methods

· In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

· Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

· The assumptions used for any reporting of metal equivalent values should be clearly stated.

· Significant results have been reported previously (see links in this announcement).

· Reported grades are length weighted. Composited intervals of 4-5m of magnetite-rich mineralisation were typically assayed wherever possible, however narrower zones and lower grade material were also assayed.

· No cut-off grades were applied. Samples with low magnetite content and low magnetic susceptibility were not generally assayed.

· No metal equivalents have been reported.

Relationship between mineralisation widths and intercept lengths

· These relationships are particularly important in the reporting of Exploration Results.

· If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

· If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').

· The exploration results refer to down hole intercept lengths. True widths are not known.

Diagrams

· Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

· See announcement and links to other announcements.

 

Balanced reporting

· Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

· Summary tables are presented in this release. See links to previous reports noted in this announcement.

Other substantive exploration data

· Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

· Detailed low-level aeromagnetic survey was acquired to identify magnetic targets within the Attutra Metagabbro on EL10215 (now EL32167). Holes were initially targeted based on reduced to pole (RTP) aeromagnetic data and reconnaissance geological mapping.

· Ground-based gravity and magnetic surveys were acquired over the Casper and Coco prospects. These data were acquired and modelled as part of an B.Sc. Honours project by Jodi Fox at the University of Tasmania in 2007.

· Gravity and magnetic targets were modelled in 2008.

Further work

· The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

· Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

· Additional drilling and DTR test work are recommended to further evaluate the identified prospects.

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDRJMATMBBMMIL
Date   Source Headline
24th Apr 20247:00 amRNSCompletion of Stage 1 Earn-In Commitment - Molyhil
6th Mar 20247:00 amRNS3D Model Shows Alford East Copper Mineralisation
5th Mar 20247:00 amRNSHalf-year Report
29th Feb 20247:00 amRNSHigh Grade Uranium and Vanadium Assays Results
30th Jan 20247:00 amRNSQuarterly Activities and Cash Flow Report
25th Jan 20247:00 amRNSAlligator completes Initial Investment in ECL
18th Jan 20247:00 amRNSUranium Update
18th Dec 20237:30 amRNSAlligator Energy Invests into ISR Copper
18th Dec 20237:00 amRNSEnviroCopper Ltd to Acquire Alford West Tenement
11th Dec 20237:00 amRNSCopper Recoveries Advance ISR Assessment
4th Dec 20237:00 amRNSHigh-Grade Uranium Intercepts at Groundhog
30th Nov 202312:00 pmRNSConference Attendance
29th Nov 202310:50 amRNSResult of AGM
22nd Nov 20237:00 amRNSDrilling Program Completed
15th Nov 20237:00 amRNSSignificant Uranium Mineralisation Intercepted
8th Nov 20231:30 pmRNSDrilling starts at Molyhil Tungsten Project
7th Nov 20237:00 amRNSCopper Hosting Troughs Defined by ANT Surveys
3rd Nov 20237:05 amRNSIncreases interest in Alford East Project to 80%
3rd Nov 20237:05 amRNSNotice of AGM
31st Oct 20237:00 amRNSQuarterly Activities and Cash Flow Report
26th Oct 20237:00 amRNSCorporate Presentation
23rd Oct 20237:00 amRNSDirector/PDMR Shareholding
18th Oct 20237:30 amRNSUranium Drilling Commences
3rd Oct 20237:00 amRNSANT Geophysical Surveys Commence
20th Sep 20237:00 amRNSEquity Placing to Accelerate Uranium Drilling
18th Sep 20237:30 amRNSASX Trading Halt
13th Sep 20237:00 amRNSKey Environmental Approvals Granted
4th Sep 20237:00 amRNSFleet Space Technologies Collaboration
23rd Aug 202310:56 amRNSResult of GM & Share Capital Consolidation
17th Aug 20237:00 amRNSUranium Drilling Approvals Granted
4th Aug 20237:00 amRNSProposed Share Consolidation and Notice of GM
31st Jul 20237:00 amRNSQuarterly Activities and Cash Flow Report
27th Jul 20237:00 amRNSUranium Targets Identified
31st May 20237:00 amRNSAirborne Magnetic & Radiometric Surveys Commence
22nd May 20237:00 amRNSShareholder and Investor Event
3rd May 20237:00 amRNSRIU Sydney Conference Attendance
28th Apr 20237:33 amRNSQuarterly Activities and Cash Flow Report
26th Apr 20237:00 amRNSAlford East: High-grade Rare Earth Discovery
24th Apr 20237:00 amRNSPositive Vanadium Assay Results
17th Apr 20237:00 amRNSAlford West Project Survey Results
28th Mar 20237:00 amRNSHolding(s) in Company
20th Mar 20237:31 amRNSDirector/PDMR Shareholding
14th Mar 20237:00 amRNSHalf-year Report
8th Mar 20237:00 amRNSCorporate Presentation
2nd Mar 20237:00 amRNSGeophysics Commences at Alford West Project
13th Feb 20238:38 amRNSDirector/PDMR Shareholding
8th Feb 20237:00 amRNSDirector/PDMR Shareholding
31st Jan 20237:50 amRNSQuarterly Activities and Cash Flow Report
23rd Jan 20232:05 pmRNSSecond Price Monitoring Extn
23rd Jan 20232:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.