Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.00 (0.00%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Gold Drilling Program Starts At Spring Hill

6 Jul 2012 07:00

RNS Number : 0564H
Thor Mining PLC
06 July 2012
 



THOR MINING PLC

 

COMMENCEMENT OF DRILLING PROGRAM

AT

SPRING HILL GOLD PROJECT

 

Dated: 6 July 2012

 

The Board of Thor Mining Plc ("Thor") (AIM, ASX: THR), is pleased to advise that a drilling program to test a number of gold mineralised options has commenced at its Spring Hill Gold Project south of Darwin in Australia's Northern Territory.

The new program's objectives, is in part to complete the aims of last year's campaign, which was cut short by an early wet season, with approximately 2,350 metres of drilling. 

 

The Program objectives include testing the following targets:

 

·; Mineralisation below the existing Hong Kong lode (completion of 2011 program),

·; Potential satellite targets within Spring Hill lease area, and

·; Callie style mineralisation at depth beneath Spring Hill.

 

The program is expected to be completed by the end of August 2012.

 

A high resolution helicopter based magnetic (Helimag) survey has been commissioned over the Spring Hill exploration tenements. Data generated from this program scheduled for mid-July will be available to assist with this seasons drill targeting.

 

Further Hong Kong Mineralisation

 

On the basis of the 2011 drilling results the 2012 drilling program will be directed to test the overall continuity of the gold mineralising system below the known Hong Kong lode. As a result, the 2012 holes will aim deeper and have a broader spacing than 2011. Three holes are planned for this component of the program totalling 1,050 metres, with the first 100 metres of each hole using reverse circulation (RC) drilling, and the deeper portion with diamond drilling.

The drill target zone has been selected to correspond with the strongest Hong Kong mineralisation.

 

Satellite Mineralisation

 

The Ross Mining/Billiton JV drilling 1989-92 located additional gold mineralisation to the main Spring Hill lodes, including one such deposit approximately 1km north of the main Spring Hill lodes. Other similar deposits exist to the south and west.

 

Four 150 metre RC holes are scheduled for this part of the program.

 

Modelling of the Helimag survey data may assist to define these and locate other such targets for subsequent drill testing this season.

 

Callie Mineralisation Model

 

The Spring Hill gold deposit is potentially an indicator of more substantial mineralisation at depth. The structural and stratigraphic setting of the >5Moz Callie gold deposit in the Northern Territory's Tanami Region is analogous to the neighbouring >1Moz Cosmo Howley deposit.

 

The Callie geological setting comprising a sheeted vein system may also exist deeper in the anticline, physically below the Spring Hill deposit and has potential for substantial gold mineralisation.

 

The Callie mineralisation model which is a separate deposit in a separate but related setting will be targeted by Thor as part of the 2012 Spring Hill drilling program.

 

One 700 metre hole is initially planned, with up to 300 metres of the top portion using RC drilling.

 

About the Spring Hill Gold Project

The Spring Hill tenements are located approximately 150 km south of Darwin in Australia's Northern Territory. Importantly the location is served by all-weather access and is in close proximity to the arterial Stuart Highway, north-south rail, gas pipeline, and trunk power lines.

 

Thor Mining acquired a 25% interest in the Spring Hill project from Western Desert Resources Limited last August, along with rights to increase that interest to 80%. It is envisaged that by the end of this drilling program, Thor will have satisfied the exploration expenditure criteria necessary to increase its project equity to 51%.

 

Geology & Gold Mineralisation

Discovered around 1880, the Spring Hill deposit yielded approximately 20,000 ounces of recorded high grade gold production (15 - 30 g/t) over the following 25 years.

It shows many of the characteristics frequently associated with numerous gold deposits in the NT's Pine Creek region. The host rocks are (meta) sedimentary greywackes and siltstones of the lower part of the Mt Bonnie Formation.

Gold occurs mainly in quartz veins concentrated in fracture zones and the axial zones of anticlinal fold structures. Much of the gold is relatively coarse grained, in the visible range, imparting significant "nugget effect" to drill samples.

Four main zones of gold mineralisation cover an area of approximately 1,000 X 400 metres. Several additional occurrences have been identified in adjoining areas. These are scheduled for testing during the 2012 drilling season.

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Gerry Beaney/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters/

Lavinia Fiamma

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

 

Competent Person statement -

 

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

 

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGUQUMUPPGQA
Date   Source Headline
3rd Nov 20173:59 pmRNSDirector/PDMR Shareholding
3rd Nov 201712:55 pmRNSDirector/PDMR Shareholding
2nd Nov 20172:36 pmRNSDirector/PDMR Shareholding
2nd Nov 20179:50 amRNSDirector Option Exercise Raising £125,000
1st Nov 20177:00 amRNSQUARTERLY REPORT JULY TO SEPTEMBER 2017
30th Oct 20177:10 amRNSIMPROVED ORE SORT RESULTS BOOST MOLYHIL
20th Oct 20171:44 pmRNSFINANCING AND STRATEGIC UPDATE
12th Oct 20171:36 pmRNSAMENDED ANNOUNCEMENT - DRILLING AT PILOT MOUNTAIN
6th Oct 20179:44 amRNSDRILLING SUCCESS AT PILOT MOUNTAIN PROJECT
29th Sep 201710:35 amRNSFinal Results
20th Sep 20177:00 amRNSCorporate Presentation Update
19th Sep 20179:29 amRNSCOMPLETION OF DRILLING AT PILOT MOUNTAIN - NEVADA
13th Sep 201712:23 pmRNSDEVELOPMENT ASSESSMENT PLAN-KAPUNDA COPPER PROJECT
31st Aug 201711:57 amRNSINITIAL ROYALTY PAYMENT - SPRING HILL PROJECT
30th Aug 20177:00 amRNSTUNGSTEN & COPPER INTERCEPTS AT DESERT SCHEELITE
17th Aug 20179:22 amRNSTUNGSTEN COPPER AND ZINC INTERSECTED AT GOOD HOPE
14th Aug 201710:00 amRNSTUNGSTEN EXPANSION DRILLING - SUPPLEMENTARY ADVICE
10th Aug 20178:22 amRNSTUNGSTEN EXPANSION DRILLING - PILOT MOUNTAIN
3rd Aug 201710:16 amRNSDirector/PDMR Shareholding
1st Aug 20179:23 amRNSAGREEMENT TO CO-INVEST IN COPPER PROJECT
1st Aug 20177:25 amRNSQUARTERLY REPORT APRIL TO JUNE 2017
31st Jul 20177:00 amRNSUS LITHIUM OPTION - PROGRESS UPDATE
28th Jul 201710:30 amRNSDirector/PDMR Shareholding
28th Jul 201710:20 amRNSAppendix 3B
27th Jul 201710:00 amRNSResult of General Meeting
13th Jul 201712:29 pmRNSUPDATE ON 25% STAKE IN US LITHIUM PROJECTS
7th Jul 201710:53 amRNSNOTICE OF GENERAL MEETING
7th Jul 20177:06 amRNSSTRATEGIC OUTLOOK UPDATE
4th Jul 20177:00 amRNSGRANTING OF ADDITIONAL EXPLORATION LICENCE AREA
27th Jun 20171:06 pmRNSDirector/PDMR Shareholding
27th Jun 201711:55 amRNSAppendix 3B - Grant of Warrants
26th Jun 201711:43 amRNSDirector/PDMR Shareholding
20th Jun 20172:00 pmRNSPLACEMENT TO FUND EXPLORATION PROGRAMS
19th Jun 201711:56 amRNSDundas Gold Project - Completion of Drill Program
14th Jun 20172:30 pmRNSAgreement to Aquire 25% of US Lithium Explorer
14th Jun 20172:30 pmRNSSigning of the Share Purchase Agreement
14th Jun 201711:03 amRNSDundas Gold Project- Commencement of Drill Program
5th Jun 20177:00 amRNSDirector/PDMR Shareholding
24th May 20174:06 pmRNSDirector/PDMR Shareholding
23rd May 201712:30 pmRNSDirector/PDMR Shareholding
22nd May 20172:45 pmRNSDirector/PDMR Shareholding
22nd May 20177:00 amRNSTungsten Resource Increase at Pilot Mountain
4th May 20179:32 amRNSDirector/PDMR Shareholding
28th Apr 20177:00 amRNSQUARTERLY REPORT JANUARY TO MARCH 2017
21st Apr 20179:38 amRNSDRILL ASSAY RESULTS
11th Apr 20178:03 amRNSExercise of warrants
31st Mar 201710:16 amRNSProject Q & A Discussion
31st Mar 20177:00 amRNSDirector Appointment and Option Awards
20th Mar 20179:12 amRNSAppendix 3B
17th Mar 20173:00 pmRNSAppendix 3B

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.