Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.00 (0.00%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

DRILLING COMPLETION & PRELIMINARY OBSERVATIONS

15 Mar 2017 11:17

RNS Number : 5527Z
Thor Mining PLC
15 March 2017
 

15 March 2017

 

THOR MINING PLC

DRILLING COMPLETION & PRELIMINARY OBSERVATIONS

 PILOT MOUNTAIN - NEVADA

The Board of Thor Mining Plc ("Thor" or the "Company") (AIM, ASX: THR), is pleased to advise the successful completion of the first round of drilling at the Company's wholly owned Pilot Mountain tungsten project in Nevada, USA.

Highlights:

· 51 metres of scheelite bearing skarn including 9 metres with visible sulphide mineralisation (including chalcopyrite) intersected 25 metres to the east and approximately 50 metres closer to surface from high grade Desert Scheelite intersection from the 2012 high grade intersection at DSDD015 (17.5m @ 5.7% Cu equivalent);

· Third hole at Desert Scheelite intersected 15 metres of mineralised skarn from 124.7m (down hole length), aligning with results from the 2012 drill program;

· Six holes completed at Garnet with better than expected results including 19.0 metres(m) from 75.5m in 17GR-RC05 not previously recorded;

· Confirmation of metal grades within the reported mineralised skarn intersections will be determined via laboratory assays and announced within four weeks;

 

Mr Mick Billing, Executive Chairman of Thor: "Subject to the receipt of assays, the Pilot Mountain drilling program has substantially exceeded expectations. The third Desert Scheelite drill hole has demonstrated continuation of mineralisation for a total of 50 metres to the east of DSDD015, drilled in 2012. The 15 metres of mineralised skarn from the third hole is consistent with our expectations and highlights the strong potential for continued extension of Desert Scheelite to the east and at depth. Planning for a follow up drill program at Desert Scheelite has commenced."

"The Garnet prospect drilling has shown remarkable consistency with the historic data which bodes well for a near term maiden resource for the deposit. The unexpected additional scheelite mineralisation discovered in Hole 17GR-RC05 at the Garnet prospect asserts the robust potential of this project".

The Desert Scheelite deposit currently comprises 100% of the Pilot Mountain Resource estimate of 6.7Mt. The objective of the two holes programmed at this deposit is to test for extensions to the high grade mineralisation intersected in the last hole drilled into this deposit in 2012.

The first of these (Hole 1) was designed to test for mineralisation 100 metres vertically above DSDD15. This hole failed to intersect mineralisation due to what appears to be fault displacement.

Hole 2 targeted mineralisation 75 metres above and 25 metres to the east of DSDD15 and intersected 51 metres of visible scheelite mineralisation from 142 metres down hole including 9 metres of higher sulphide style mineralisation, including visible chalcopyrite from 172 metres down hole. While this very encouraging drill intersection appears to be comparable with the intersection of DSDD15, assay results are required to confirm actual metal content.

Hole 3 targeted mineralisation a further 25 metres to the east of the second hole and intersected 15 metres of mineralised skarn from 124.7m, which is in line with the results from the 2012 drilling programme.

 

Table 1: Pilot Mountain Resource Summary 2014 (JORC 2012, announced 10 June 2014. 100% owned by Thor Mining Plc

Desert Scheelite

Resource

WO3

Ag

Cu

Tonnes

Grade %

Contained metal (t)

Grade g/t

Contained metal (t)

Grade %

Contained metal (t)

Indicated

6,090,000

0.31

18,900

24.2

150

0.16

10,000

Inferred

700,000

0.30

2,100

9.1

10

0.24

2,000

Total

6,790,000

0.31

21,000

22.8

160

0.17

12,000

 

The Company confirms that, until assay results are available for the current drilling program, it is not aware of any new information or data that materially affects the information included in the above table, and, that all material assumptions and technical parameters underpinning these estimates continue to apply and have not materially changed.

Intersections quoted in this announcement, and also for previous drilling results for DSDD15, are down-hole measurements only, as at this stage there is insufficient data to adequately assess true width of mineralisation. The quantity of data available is generally not sufficient to allow any reasonable estimates of Mineral Resources in accordance with the JORC code. We anticipate being in a position to update the Mineral Resource estimate following the receipt of assay results expected in approximately four weeks.

Table 2: Desert Scheelite Drill hole orientation summary

Hole Id

Alias

EastingNAD83 zone 11

NorthingNAD83 zone 11

Hole collar dip*

Hole collarAzimuth*

Final Depth(m)

17DS-RC01

Hole 1

424 458

4 248 320

-60

179

142

17DS-RC02

Hole 2

424 460

4 248 320

-75

150

210

17DS-RC03

Hole 3

42 4604

4 248 319

-58

137

152

* Down hole surveys of these holes have shown dip and azimuth variation to be less than 5 degrees.

 

Table 3: Summary of Garnet drill hole observations 2017 in comparison with historic drill data from Union Carbide Corp drilling conducted in the 1970's.

Hole ID(2017)

Easting(NAD83zone 11)

Northing(NAD83zone 11)

Elevation(m ASL)

Intersection(Thor 2017)

Historic Intersection(UCC 1970's)

17GR-RC01

422,442

4,249,532

2135

6.9 - 9.1m (2.2m)

GR-66

3.0 - 7.0m (4m)

36.6 - 37.3m (0.7m)

Not previously recorded

41.2 - 48.8m (7.6m)

40.2 - 48.2m (8m)

83.1 - 88.4m (5.3m)

83.5 - 88.6m (5.1m)

17GR-RC02

422,526

4,249,694

2136

28.2 - 28.9m (0.7m)

GR-119

29.8 - 37.9m (8.1m)

32.8 - 36.6m (3.8m)

17GR-RC03

422,489

4,249,756

2130

13.7 - 19.0m (5.3m)

GR-128

15.2 - 19.8 (4.6m)

Not intersected

26.5 - 29.3m (2.8m)

Not intersected

37.5 - 40.0m (2.5m)

43.4 - 48.8m (5.4m)

Not previously recorded

17GR-RC04

422,357

4,249,532

2163

19.0 - 24.4m (5.4m)

GR-123

14.0 - 18.5m (4.5m)

73.6 - 75.5m (1.9m)

Not previously recorded

17GR-RC05

422,354

4,249,754

2158

6.9 - 9.9m (3.0m)

GR-98

Not previously recorded

13.7 - 18.3m (4.6m)

15.9 - 18.6m (2.7m)

Not intersected

22.6 - 24.1m (1.5m)

51.1 - 52.1m (1.0m)

Not previously recorded

75.5 - 94.5m (19.0m)

Not previously recorded

17GR-RC06

422,377

4,249,783

2158

2.2 - 3.8m (1.6m)

GR-100

Not previously recorded

7.2 - 12.2m (5.0m)

7.1 - 9.3m (2.2m)

14.5 - 22.1m (7.6m)

15.1 - 19.7m (4.6m)

25.8 - 35.8m (9.9m)

25.9 - 35.4m (9.5m)

42.4 - 45.0m (1.2m)

Not previously recorded

Note: All holes were drilled vertical and surveyed by north seeking gyroscopic down hole tool;

 

Enquiries:

Mick Billing

+61 (8) 7324 1935

Thor Mining PLC

Executive Chairman

Ray Ridge

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company

Secretary

Colin Aaronson/

Daniel Bush/

Richard Tonthat

+44 (0) 207 383 5100

 

Grant Thornton UK LLP

 

Nominated Adviser

Elliot Hance

 +44 (0) 207382 8300

Beaufort Securities Limited

Joint Broker

Nick Emerson / Andy Thacker

+44 (0) 1483 413 500

SI Capital Ltd

Joint Broker

Tim Blythe/ Camilla Horsfall

+44 (0) 207 138 3222

Blytheweigh

Financial PR

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

Competent Person's Report

The information in this report that relates to exploration results and exploration targets is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

About Pilot Mountain

Thor's Pilot Mountain Project, acquired in 2014, is located approximately 200 kilometres south of the city of Reno and 20 kilometres east of the town of Mina located on US Highway 95.

The Pilot Mountain Project comprises four tungsten deposits: Desert Scheelite, Gunmetal, Garnet and Good Hope. All are in close proximity (~three kilometres) to each other and have been subjected to small-scale mining activities at various times during the 20th century. Union Carbide acquired the project in 1978, for US$7.0 million (estimated at US$26million - US$40million in 2017 dollars), and conducted detailed exploration and feasibility activities until, following a global downturn in the tungsten industry in the 1980s, they suspended further work.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUVAARBOAOAAR
Date   Source Headline
25th Nov 20219:15 amRNSIssue of Equity
23rd Nov 20217:00 amRNSOver 45m of Mineralisation Intercepted at Molyhil
22nd Nov 20218:45 amRNSDirector/PDMR Shareholding
16th Nov 20217:32 amRNSStage 1 Earn-in Completed at Alford East
11th Nov 202110:02 amRNSHolding(s) in Company
10th Nov 20211:04 pmRNSResult of AGM
10th Nov 202110:00 amRNSAGM Statement
8th Nov 20217:00 amRNSCommencement of Drilling at Molyhil Project
1st Nov 20217:00 amRNSSale Option Exercised for $1.8m at Pilot Mountain
29th Oct 20217:02 amRNSQuarterly Activity Report July to September 2021
25th Oct 20217:00 amRNSAlford East Presentation
18th Oct 20217:00 amRNSHydrogeology Results
12th Oct 20218:29 amRNSNotice of AGM
11th Oct 20217:00 amRNSRC Drilling Program Commences at Ragged Range
7th Oct 20217:00 amRNSNew Gold Assays Define Drill Ready Targets
4th Oct 20217:00 amRNSBoard Change
30th Sep 20211:11 pmRNSResults for the year ended 30 June 2021
30th Sep 20217:40 amRNSInvestor Presentation
17th Sep 20218:24 amRNSInvestor Presentation
17th Sep 20217:00 amRNSKapunda Drilling
15th Sep 20217:14 amRNSExercise of Options
13th Sep 20214:40 pmRNSSecond Price Monitoring Extn
13th Sep 20214:35 pmRNSPrice Monitoring Extension
13th Sep 20212:05 pmRNSSecond Price Monitoring Extn
13th Sep 20212:00 pmRNSPrice Monitoring Extension
13th Sep 20217:00 amRNSBoard Change
2nd Sep 20218:05 amRNSDirector Resignation
31st Aug 202111:45 amRNSSale Option - Pilot Mountain Project
31st Aug 20217:00 amRNSAlford East Drilling Results
31st Aug 20217:00 amRNSTotal Voting Rights
25th Aug 20217:00 amRNSCompletion of initial drilling program and results
11th Aug 20217:00 amRNSStrategic Placement
2nd Aug 20217:00 amRNSAppointment of Exploration Manager
30th Jul 20217:00 amRNSInvestor Presentation
27th Jul 20217:00 amRNSQuarterly Report April to June 2021
29th Jun 20217:00 amRNSPreliminary Drilling Results at Alford East, SA
25th Jun 20219:17 amRNSIssue of Warrants
23rd Jun 20217:00 amRNSExploration Update: Ragged Range, WA
10th Jun 20217:01 amRNSISR Explanatory Video
10th Jun 20217:00 amRNSDrilling Commences at Alford East
3rd Jun 20217:00 amRNSGrant funding for Molyhil
28th May 20217:00 amRNSDirector/PDMR Shareholding
25th May 20219:30 amRNSReplacement: Issue of Equity
25th May 20217:00 amRNSIssue of Equity
20th May 20217:00 amRNSSouth Australian Government Funding A$300,000
6th May 20217:00 amRNSInvestor Presentation
30th Apr 20217:00 amRNSQuarterly Report January to March 2021
27th Apr 20218:42 amRNSReplacement: Managing Director Appointment
20th Apr 20217:00 amRNSManaging Director Appointment
12th Apr 20217:47 amRNSRagged Range Gold Project - Field Work Commences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.