Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.25
Low: 1.25
Prev. Close: 1.25
THR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Quarterly Activity Report July to September 2021

29 Oct 2021 07:02

RNS Number : 7012Q
Thor Mining PLC
29 October 2021
 

 

29 October 2021

 

Thor Mining plc

("Thor" or the "Company")

Quarterly Activity Report

July to September 2021

 

 

 

Highlights

Outlook for December Quarter 2021

GOLD

Ragged Range, Pilbara region, WA Australia

· Maiden RC drilling program commenced (11 October 2021),

· Infill soils define eight continuous gold anomalies supported by gold in streams

 

· Completion of 3,000m RC drilling program at Sterling Prospect

· Initial assay results for RC drilling

· Infill soil program, with regional mapping and stream sediment sampling concurrent with drilling

 

COPPER

Alford East, SA Australia

· Broad high-grade copper-gold intercepts from completed diamond drilling program.

· 72.7m @ 1% Cu and 0.19g/t Au from 6.3m (21AED005)

· New 3D geological model with assay results, highlighting zones of higher-grade copper mineralisation associated with key controlling structures.

 

 

 

· Assay results from diamond drilling program

· Improved 3D geological model

· Initial metallurgical-lixiviant test results

· Commence permitting for push/pull hydrogeological pump testing

 

Kapunda, SA Australia (via 30% equity holding in EnviroCopper Ltd)

· MinEX CRC Coiled Tube drilling completed

· Permitting for Kapunda Site Environmental Lixiviant Test (SELT) drilling & copper/gold recovery work.

 

· Copper-Gold exploration assay results

· Permitting approval of SELT drilling & copper/gold recovery testing.

TUNGSTEN & MULTI COMMODITIES

Molyhil, NT Australia

· Permitting for drilling program to test high-quality magnetic targets adjacent to deposit.

 

 

Pilot Mountain, USA

· Thor have entered into a Sale Option Agreement with Power Metal Resources PLC to divest project for an agreed value of US1.8M

 

 

 

· Diamond drilling program to test new magnetic targets for potential mineralisation within magnetic W-Mo skarn

· Update Molyhil Feasibility Study

 

· Completion of Sale

 

URANIUM & VANADIUM USA

· Permitting continuing for initial drill testing of the Colorado claims.

 

· Permitting to continue for the Colorado claims.

· Geological evaluation of the Utah claims

 

· Permitting to continue for the Colorado claims.

 

CORPORATE & FINANCE

· Private placement of UK£800,000 (A$1,504,704) to progress key projects

· Board and Management changes:

· Resignation of Mick Billing Executive Chair

· Appointment of Mark Potter, Non-Executive Chair

· Appointment of Paul Wittwer as Exploration Manager

 

 

 

 

Nicole Galloway Warland, Managing Director of Thor Mining, commented:

 

"The September quarter has been a busy time, with Thor increasing its on-ground exploration activities to advance projects to drilling status.

At our Ragged Range Project, after a series of successful and systematic stream and soil programs, we are excited to have commenced our maiden RC drilling program at the Sterling Prospect. Drilling is targeting eight robust geochemical anomalies in the central portion of the Sterling Prospect, within the highly prospective 13km structurally controlled gold anomalous corridor defined by Thor, associated with the regional mafic-ultramafic thrust faulted contact within the Kelly Greenstone Belt.

During the quarter we completed our first phase of diamond drilling at the Alford East Copper-Gold Project, with results reporting significant intercepts and defining a new structurally controlled, broad zone of high copper and gold grades, from near surface. With the copper price at an all-time high makes this a very significant project in the Thor portfolio. The confirmed uplift in copper and gold grades along the controlling NNE structure continues to excite and exceed our expectations. For instance, drillhole 21AED005 reported the widest Cu intercept >1% Cu at Alford East (72.7m @ 1% Cu and 0.19g/t Au for only 6.3m). We look forward to testing this structure in areas open along strike, to the north and south.

Initial pump testing was also completed at Alford East in September, with preliminary results showing favourable water parameters and permeability for potential In Situ Recovery of copper and gold. This is positive news as we advance the project towards an In-Situ Recovery (ISR) assessment, and the development of a low cost, low carbon emission alternative to conventional open cut or underground mining.

We are very pleased to enter into a Sale Option Agreement with Power Metals for the 100% sale of the Pilot Mountain Project in Nevada, USA. This strategic divestment of this non-core asset is in line with our focus on the advancement of our copper and gold projects.

We look forward to providing further updates on our continued progress."

 

RAGGED RANGE GOLD PROJECT

The Ragged Range Project, located in the prospective Eastern Pilbara Craton, Western Australia (Figure 1) is 100% owned by Thor Mining - (E46/1190, E46/1262, E46/1355, E46/1340) with the recent additional tenure surrounding the gold anomalous and copper-gold zones, E46/1393 (application).

Since acquisition, Thor has conducted several programs of stream sediment and soil sampling to delineate drill targets. Thor has also flown an airborne magnetics survey over the tenement area to better define the structural features of the area.

Details of the projects may be found on the Thor website via this link: www.thormining.com/projects/ragged-range-pilbara-project.

A copy of the Ragged Range Project Map may be view via the following link:

www.thormining.com/sites/thormining/media/Maps/20-004-1a-ragged-range-location.jpg

 

A copy of the Regional Sterling prospect may be viewed by the following link:

www.thormining.com/sites/thormining/media/maps/21-004-1a-ragged-range-soilupdate-202106.jpg.

Sterling Prospect - Soil results

Thor completed a further 369 infill soil samples in July over two portions of the Sterling Prospect, Sterling Central and Sterling South, as a follow-up to a reconnaissance soil program (THR:ASX announcement 23/06/21) and high-grade gold stream results (up to 2.2g/t Au), reported from sampling in 2019 and 2020 (THR:ASX announcement 1/12/2020).

https://www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210623-ragged-range-exploration-update.pdf 

The infill soil samples were collected at a 25m x 100m spacing over priority areas with anomalous gold results from the initial reconnaissance program. At each site and consistent with the previous soil program, two samples were collected at each site, and both sieved to -2mm. The first sample of approximately 2kg was crushed at the Intertek lab in Perth and a sub-split assayed for Au by an aqua regia method AR25 and multi-element assaying by four-acid digest with MS25 finish. The second sample 1kg Bulk Leach Extractable Gold (BLEG) sample was assayed by method CN1000 for gold only.

The infill soil results returned BLEG soil values up to 348ppb and 153ppb Au (21RRS777 and 21RRS437 respectively), with over 61 samples reporting significantly above a background of approximately 5ppb Au (Figure 2). Five stream sediment samples were collected using a

Only thin residual soils overlie the Euro Basalt extending westward over the ultramafic Dalton Suite, faulted contact and the tenor and consistency of the BLEG results is considered outstanding.

These latest soil results, combined with the initial soil program earlier in the year, have now identified several continuous anomalous gold zones, each warranting drill testing, with some zones extending over 1km long at both the Sterling Central and Sterling South areas. Soil anomalies remain open to the north and south, with follow up infill sampling planned to investigate these areas further.

The gold anomalism generally strikes slightly oblique to the Euro Basalt and Dalton Suite contact suggesting that gold mineralisation is controlled by minor faults and structures, associated with this major structure.

 

A map showing Sterling Prospect high-grade soil results; Sterling Central (Right) and Sterling South (Left) may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/maps/sterling-sth-and-central-soil-anomalies.jpg

 

Nickel Gossan

Geological mapping of the nickel gossan which was previously sampled in mid-2020 (THR: ASX announcement 31 July 2020) confirmed that the gossan extends over 1km and sits at the base of the Dalton Suite (ultramafic units), adjacent to the older Felsic Volcanics of the Wyman Formation. This position of the gossan at the base of the ultramafic contact is significant from a geological nickel-sulphide model perspective.

Prior to drill testing beneath the gossan, a ground electromagnetic (EM) survey will be undertaken. Thor is currently finalising this program.

https://www.thormining.com/sites/thormining/media/pdf/asx-announcements/20200826-pilbara-goldfields-encouraging-nickel-assay-results.pdf

 

E46/1393- Kelly/Ryan Copper- Gold Prospects

A new tenement application E46/1393 in the northeast covers a recently surrendered mining lease M46/171 (Figure 1). This area covers several historic copper-gold and copper-base metals mines and prospects. The copper mineralisation is associated with the dacite Boolina porphyry, close to the margin of the Corunna batholith, and intrudes the Kelly greenstone belt.

At Kelly's Mine, historic production between 1955-1970, although small, was of very high-grade - 610t of ore averaging 19.47% Cu.1

Exploration to date has been sporadic, with no systematic approach over the area. Thor will be targeting areas of mineralisation, zones of alteration, shears/faults and zones of brecciation.

 

1 https://www.mindat.org/loc-122951.html

Photos of the historic copper working at Kelly's prospect may be viewed on following link:

www.thormining.com/sites/thormining/media/maps/historic-workings-kelly-prospect.jpg

Next Steps

A 3,000m RC drilling program commenced in October to test eight priority gold in soil and stream anomalous targets (THR:ASX 12 October 2021).

Thor Mining was awarded A$160,000 from the Western Australia Government under the EIS Co-funded grants program to drill test gold anomalies at the Sterling Prospect.

Concurrent with the drilling program, infill soil sampling covering anomalous zones open at Sterling Central and Sterling South will be completed. In addition, regional gold targets, including to the northwest and southeast of Sterling prospect, the granitoid contact in the north, plus the copper-gold area in the northeast (Kelly/Ryan Prospects), will be followed up with reconnaissance stream and soil geochemistry programs. Government and Company geophysics are being used in conjunction with the geochemical data, to assist with structural and lithological targeting.

 

COPPER PROJECTS

 

Thor holds direct and indirect interests in over 400,000 tonnes of Inferred copper resources in South Australia, via its 80% farm-in interest in the Alford East copper project and its 30% interest in EnviroCopper Ltd.

Each of these projects are considered by Thor directors to have significant growth potential, and each are being advanced towards development via low cost, environmentally friendly In Situ Recovery (ISR) techniques.

 

A copy of the Tenement and Prospect Location Plan may be viewed via the following link:

http://www.thormining.com/sites/thormining/media/maps/21-001-4-ae-mre-%E2%80%93-location.jpg

 

ALFORD EAST COPPER-GOLD PROJECT - SA

 

The Alford East Copper-Gold Project is located on EL6529, where Thor is earning up to 80% interest from unlisted Australian explorer Spencer Metals Pty Ltd, covering portions of EL6255 and EL6529 (THR:ASX 23 November 2020).

The Project covers the northern extension of the Alford Copper Belt, located on the Yorke Peninsula, SA. The Alford Copper Belt is a semi coherent zone of copper-gold oxide mineralisation, within a structurally controlled, north-south corridor consisting of deeply kaolinised and oxidised troughs within metamorphic units on the edge of the Tickera Granite, Gawler Craton, SA.

Utilising historic drill hole information, Thor completed an inferred Mineral Resource Estimate (MRE), with summaries in Table B (THR:ASX 27 January 2021), consisting of:

§ 125.6Mt @ 0.14% Cu containing 177,000t of contained copper

§ 71, 500oz of contained gold

www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210127-maiden-copper.gold-estimate-alford-east-sa.pdf

 

 

 

 

 

Table B: Alford East Mineral Resource Estimate by JORC (2012) classification reported 27 January 2021

Domain

Tonnes (Mt)

Cu %

Au g/t

Contained Cu (t)

Contained Au (oz)

AE_1

24.6

0.12

0.021

30,000

16,000

AE_2

6.8

0.13

0.004

9,000

1,000

AE_3

34.9

0.09

0.022

33,000

25,000

AE_4

8.0

0.11

0.016

8,000

4,000

AE_5

11.0

0.22

0.030

24,000

11,000

AE-8 (NP)

31.3

0.19

0.008

61,000

8,000

AE-7 (LW_E)

7.7

0.14

0.025

10,000

6,000

AE-6 (LW_W)

1.3

0.13

0.011

2,000

500

Total

125.6

0.14

0.018

177,000

71,500

Note:

§ Figures are rounded to reflect appropriate level of confidence. Apparent differences may occur due to rounding.

§ Cut-off of 0.05% Cu

§ Thor earning up to 80% interest in Alford East Copper-Gold Project

§ The Company is not aware of any information or data which would materially affect this previously announced resource estimate, and all assumptions and technical parameters relevant to the estimate remain unchanged

 

Diamond Drilling Program

Nine diamond drillholes totalling 878m were completed as part of Thor's initial diamond drilling program, with assays received for three drillholes - 21AED001, 21AED002 and 21AED005. This initial program for Thor, focussed only on the northern portion of the Alford East copper-gold deposit around the AE-5 mineralised domain, with drilling targeting areas open at depth and along strike, whilst validating interpreted controlling mineralised structures. AE-5 domain is one of eight mineralised domains.

Drillhole assay results with significant copper and gold intercepts include (THR:ASX Announcement 31 August 2021):

· 21AED001: 108.2m @ 0.17% Cu and 0.1g/t Au from 6.2m, including

25.3m @ 0.11% Cu from 6.2m

32.9m @ 0.4% Cu and 0.31g/t Au from 81.5 m, and

5m @ 0.5% Cu and 1.02g/t Au from 102m

§ 21AED002: 59.9m @ 0.31% Cu from 21.9m

§ 21AED005 72.7m @ 1.0% Cu and 0.19g/t Au from 6.3m, including

18.2m @ 2.0% Cu and 0.34g/t Au from 15.8m

 

Note for In Situ Recovery, Thor is targeting broad copper-gold oxide intervals above the MRE cut-off grade of 0.05% copper.

For ISR purposes, drilling was limited to the deeply weathered lithological profile, testing the extent of the oxide zone and the depth boundary of the Top of Fresh Rock (TOFR). The copper-gold oxide mineralisation is hosted within deeply kaolinised (clay) and metasomatic altered units on the contact between the Olympic Domain Wallaroo Group metasediments and the Hiltaba Suite, Tickera Granite. Copper oxide mineralogy is dominated by malachite and chalcocite.

Drillholes 21AED001, 21AED003 and 21AED005 (Section A-A' 6,256,360mN), were drilled through the central portion of AE-5 MRE Domain, designed to validate the geological model and test areas, open at depth. The high-grade copper and gold intercepts in both 21AED001 and 21AED005 are, significantly above the MRE cut-off and open up the potential for oxide mineralisation at depth. Drillhole 21AED005 highlights the significant grade uplift along the interpreted north-south controlling structure. Copper (predominately malachite) and gold mineralisation in 21AED005 is hosted within residual friable clays.

Assay results from 21AED001, 21AED002 and 21AED005 confirm significant copper and gold grade uplift along the north-south trending controlling structure, validating the new geological model and structural controls on mineralisation. Validation and confidence in the geological model are critically important for future drill targeting, as well as resource modelling.

The continuation of the visual copper mineralisation 100m north of the MRE AE-5 domain envelope, (21AED002, 21AED006 and 21AED007), confirms oxide copper mineralisation remains opens along strike and potentially links AE-5 to the AE-8 domain.

Remaining drill core is currently being prepared for sample submission to the laboratory, with all assay results anticipated in the December quarter.

Pump testing for initial hydrogeological baseline work forming part of the 'proof of concept' for ISR, including water characteristics, porosity, and permeability testing was completed in September, with results confirming positive water parameters and permeability for potential ISR at Alford East Project (THR:ASX 18 October 2021). Preliminary hydrometallurgical studies by Mining and Process Solutions (MPS) on potential lixiviants for copper and gold recovery is in progress. This work is co-funded by the SA Government Accelerated Discovery Grant (ADI) of A$300,000.

In conjunction with the technical assessment, Thor will continue ongoing stakeholder and community engagement, and regulatory activities.

Based on the nature of the oxide mineralisation, the deposit is considered amenable to In Situ Recovery (ISR) techniques. For further information on ISR please refer to Thor's website via this link for an informative video: www.youtube.com/watch?v=eG_1ZGD0WIw

 

A plan view showing the Alford East Project's eight mineralised domains and an a drillhole location plan of AE-5, may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/Maps/mre_ae_5-drilling.jpg

 

https://www.thormining.com/sites/thormining/media/Maps/ae-5-location-plan.jpg

 

Cross section 6256360m N showing 21AED001, 21AED003 and 21AED005 may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/Maps/xs-6256360mn..jpg

 

Cross section 6256600 N showing 21AED002 and 21AED007 may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/Maps/2021.08.23-ae5-section-6256600mn-incl-21aed002-assays-and-xrf---assays-shown-as-bar-graph.jpg

 

A Photo Plate of 21AED005 may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/Maps/21aed005_core-photo.jpg

 

 

KAPUNDA and ALFORD WEST COPPER PROJECTS - SA

Thor holds a 30% equity interest in private Australian company, EnviroCopper Limited ("ECL"). In turn, ECL has entered into an agreement to earn, in two stages, up to 75% of the rights over metals which may be recovered via In-Situ Recovery ("ISR") contained in the Kapunda deposit from Australian listed company, Terramin Australia Limited ("Terramin" ASX: "TZN"), and rights to 75% of the Alford West copper project comprising the northern portion of exploration licence EL5984 held by Andromeda Metals Limited (ASX:ADN).

Information about EnviroCopper Limited and its projects can be found on the EnviroCopper website:

www.envirocopper.com.au 

 

KAPUNDA

ECL, in collaboration with MinEx CRC, completed an innovative Coiled Tube ("CT") drilling program at Kapunda during the quarter. MinEx CRC is the world's largest mineral exploration collaboration, bringing together the mining industry (including drilling companies), government and research organisations. The drilling program was designed to trial technological advancements using a safer, environmentally friendly mining technology with a low footprint.

Drilling targeted copper-gold mineralisation approximately 30m from the planned in-situ recovery ("ISR") push/pull test site to the south of Kapunda township.

 

 

URANIUM AND VANADIUM PROJECTS

 

Thor holds a 100% interest in two US companies with mineral claims in Colorado and Utah, USA. The claims host uranium and vanadium mineralisation in an area known as the Uravan Mineral Belt, which has a history of high-grade uranium and vanadium production.

Within probable economic transport distance is a processing plant (Energy Fuels White Mesa Mill), which may be a low hurdle processing option for any production from these projects.

Details of the projects may be found on the Thor website via this link: www.thormining.com/projects/us-uranium-and-vanadium.

 

Thor is currently working through the Colorado state and County permitting processes, with Federal (BLM), environmental including Raptor surveys completed. In conjunction, a geological evaluation of the Utah claims is underway.

 

 

TUNGSTEN PROJECTS

MOLYHIL TUNGSTEN / MOLYBDENUM PROJECT - NT (100% Thor)

 

The Molyhil tungsten-molybdenum-copper deposit is 100% owned by Thor Mining and is located 220 kilometres north-east of Alice Springs (320 km by road) within the prospective polymetallic province of the Proterozoic Eastern Arunta Block in the Northern Territory.

A copy of the Tenement and Prospect Location Plan may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/Maps/12-002-1b-molyhil-location.jpg

The deposit consists of two adjacent outcropping iron-rich skarn bodies, the northern 'Yacht Club' lode and the 'Southern' lode. Both lodes are marginal to a granite intrusion; both lodes contain scheelite (CaWO4) and molybdenite (MoS2) mineralisation. Both the outlines of the lodes and the banding within the lodes strike approximately north and dip steeply to the east.

 

A full background on the project is available on the Thor Mining website www.thormining.com/projects.

Following the reporting of the Mineral Resource Estimate (ASX:THR 8 April 2021), 3D geological modelling identified two prominent structures - the Yacht Club fault and South Offset fault. Based on the geological timing of these faults they may have a significant impact on the location of tungsten and molybdenum mineralization, hence creating targets for potential extensions or offsets of the ore body.

Modelling of the 3D magnetics and the position of the South Offset Fault, strongly implies an offset of the magnetic material (magnetite skarn), host to the tungsten-molybdenum mineralisation. This potential off set of mineralisation. Although there are a few drillholes to the south of the South Offset Fault, these have not intersected the magnetic body making it an untested target.

An image showing the magnetic drill target may be viewed via the following link:

http://www.thormining.com/sites/thormining/media/maps/21_molyhil_magnetic-target.jpg

Thor Mining was awarded A$110,000 from the Northern Territory Government as part of the Resourcing the Territory, Geophysics and Drilling Collaborations (GDC) program for this drilling program.

NEXT STEPS

To enhance the Project economics for Molyhil the following activities were undertaken:

1. Ore sorting review:

X-Ray (XRT) ore sorting was completed using two size fractions, initially set at -55 mm to +25 mm, and -25 mm to +10 mm; XRT technology has significantly improved since the Thor Feasibility Study into Molyhil, allowing improved sorting precision and also allowing the sorting of finer particles, warranting further testing. Any improvement in ore sorting outcomes will reduce both capital and operating costs of the proposed Molyhil operation.

2. Depth Potential - MRE Classification:

The Measured, Indicated and inferred Mineral Resource Estimate is currently based only on mineralisation above the 200m RL; drilling at depth in conjunction with pit design and optimisation has the potential to grow the mineral resource estimate at depth.

Based on a Feasibility Study completed in 2018, the mineralised areas below the 200m RL (about 140m below surface) appear economic for mechanised underground mining techniques however requires further geotechnical work to determine economic grade cut-offs below this level.

https://www.thormining.com/sites/thormining/media/pdf/asx-announcements/20172018/20180115-asx-mh-ore-reserve-clarification.pdf 

3. Drilling Targets:

Drill test the modelled magnetic anomaly below the South Offset Fault to test for mineralised magnetite skarn.

4. Revise Feasibility Study based on the outcomes of the activities listed above.

Since the publication of the Feasibility Study in 2018 the price of tungsten has recovered and risen from US$290/mtu to US$313.5/mtu; whilst molybdenum has risen from US$11.85/lb to US$19.85/lb (Sourced from Argus Media Group ). This will significantly impact the economics of the Molyhil Project. (ASX: THR 23 August 2018).

 

A graph showing the Tungsten and Molybdenum prices (August 2018 - September 2021) may be viewed via the following link:

https://www.thormining.com/sites/thormining/media/maps/graph-w--mo-sept21.jpg

 

The Company is in discussion with several Australian Commonwealth government agencies, each of which are mandated to assist companies with projects to develop and produce critical minerals, which includes tungsten. These agencies include Export Finance Australia, Defence Export Facility, Critical Minerals Facilitation Office and the North Australian Infrastructure Facility. Further announcements will be made as appropriate.

 

Bonya (Tungsten, Copper) and Jervois Vanadium Projects (40% Thor)

The Bonya tungsten, copper and vanadium deposits are located approximately 30km to the north-east of Molyhil. Thor, in joint venture with Arafura, holds a 40% equity interest in the resources.

A full background on the project is available on the Thor Mining website: www.thormining.com/projects.

An image showing Bonya and Jervois Projects may be viewed via the following link:

https://cms.thormining.com/sites/thormining/media/Maps/15-001-1d-bonya-resources.jpg

 

 

 

PILOT MOUNTAIN TUNGSTEN PROJECT - NEVADA USA (100% Thor)

Thor's Pilot Mountain Project, acquired in 2014, is located approximately 200 kilometres south of the city of Reno and 20 kilometres east of the town of Mina, located on US Highway 95.

The Pilot Mountain Project is comprised of four tungsten deposits: Desert Scheelite, Gunmetal, Garnet and Good Hope. All of these deposits are in close proximity (~three kilometres) to each other and have been subjected to small-scale mining activities at various times during the 20th century.

A full background on the project is available on the Thor Mining website: www.thormining.com/projects.

In September, Thor advised that they have entered into an Option Agreement with Power Metal Resources Plc ("Power Metal") (AIM: POW) to divest the Pilot Mountain Tungsten Project ("Pilot Mountain") in Nevada, USA for an agreed value of US$1.8 million (THR:ASX 1 September 2021).

Under the terms of the Option Agreement Golden Metal may acquire a 100% interest in Pilot Mountain, from Thor Mining plc ("Thor Mining" or the "Vendor").

Option Period

Under this Agreement, Golden Metal will have a 60 calendar day Option Period (ending 5pm GMT on Friday 29.10.21, the "Option Expiry Date") during which it may conduct due diligence with regard to Pilot Mountain.

Power Metal will pay US$25,000 in cash to Thor Mining and issue to Thor Mining 500,000 new Power Metal Ordinary shares of 0.1p ("Ordinary Shares") at an issue price of 2.5p (£12,500 of Ordinary Shares).

Option Exercise

Subject to written confirmation of the Option Exercise by the Option Expiry Date, Golden Metal may acquire Pilot Mountain on the following terms:

Power Metal will pay US$115,000 in cash to Thor Mining and US$1,650,000 payable through issue to the THR of 48,118,920 Ordinary Shares" at an issue price of 2.5 pence per share ("Initial Consideration Shares").

Thor Mining will hold the Initial Consideration Shares in full for a minimum of 6 months after the Option Exercise date, and thereafter the Initial Consideration Shares will become freely tradable in 25% instalments (25% tradable 6 months after Option Exercise date, 50% after 9 months, 75% after 12 months and 100% after 15 months.) This trading restriction period may be varied by both parties with written agreement.

In addition, Power Metal will issue to Thor Mining 12.5 million warrants to subscribe for Ordinary Shares with an exercise price of 4p per Ordinary Share and life to expiry of 3 years from the Option Exercise date ("Initial Consideration Warrants"). Should the volume weighted average price ("VWAP") of Power Metal shares meet or exceed 10.0 (ten) pence for 5 consecutive trading days Power Metal may serve notice on Thor Mining providing 14 calendar days to exercise and pay for the Initial Consideration Warrants or the Initial Consideration Warrants would be cancelled.

Should Thor Mining exercise the Initial Consideration Warrants above within 12 months from the Option Exercise date, Thor Mining will receive one for one replacement warrants to subscribe for Ordinary Shares at a fixed price of 8p per Ordinary Share, and life to expiry ending 3 years from the date of Option Exercise ("Super Warrants"). Should the Power Metal volume weighted average share price meet or exceed 20p for five consecutive trading days Power Metal may at any time issue Thor Mining with a written notice providing 14 days to exercise and pay for the Super Warrants or the Super Warrant would be cancelled.

Tail Benefit

POW will issue Thor Mining with a further US$500,000 of Ordinary Shares, if Golden Metal publishes a JORC or 43-101 compliant resource at Pilot Mountain which increases against current declared levels by 25% across total indicated and inferred categories within two years after the Agreement date. The number of Ordinary Shares to be issued will be calculated based on the volume weighted average Power Metal share price in the ten trading days immediately preceding the announcement by Golden Metal of the JORC or 43-101 compliant increase.

 

 

 

CORPORATE, FINANCE, and CASH MOVEMENTS

During the September Quarter Mick Billing, Executive Chair resigned from the Board with immediate effect (ASX:THR 3 September 2021), with Mark Potter appointed Non-Executive Chair (ASX:THR 13 September 2021).

A private placement financing of UK£800,000 (approximately A$1,504,704), was completed during the quarter, with funds raised to be utilised for exploration activities at Ragged Range gold and nickel prospects in the Pilbara, Western Australia (THR:ASX 12 August 2021), plus the Molyhil diamond drilling program.

 

For the Quarter, the Company had:

· Net cash outflows from Operating and Investing activities for the quarter of $1,369,000, with the majority of this being directly related to exploration activities ($1,021,000);

· Net cash from Financing activities for the quarter $1,559,000;

· Providing an ending cash balance of $1,648,000.

 

Cashflows for the Quarter include related party payments of $282,000 to Directors, comprising the Managing Director's salary, fees paid to the Executive Chairman and Non-Executive Directors' fees. For this Quarter, the amount included $143,000 paid to the Executive Chairman, to settle past fees outstanding, upon his retirement in September 2021.

 

 

Yours faithfully,

 

THOR MINING PLC

Nicole Galloway Warland

Managing Director

 

 

- Ends -

 

For further information on the Company, please visit www.thormining.com or contact the following: 

Thor Mining PLC

Nicole Galloway Warland, Managing Director

Ray Ridge, CFO / Company Secretary

Tel: +61 (8) 7324 1935

Tel: +61 (8) 7324 1935

WH Ireland Limited (Nominated Adviser and Joint Broker)

Tel: +44 (0) 207 220 1666

Jessica Cave / Darshan Patel / Megan Liddell

Jasper Berry (Corporate Broking)

SI Capital Limited (Joint Broker)

Tel: +44 (0) 1483 413 500

Nick Emerson

Yellow Jersey (Financial PR)

thor@yellowjerseypr.com

Sarah Hollins / Henry Wilkinson

Tel: +44 (0) 20 3004 9512

 

 

 

Competent Person's Report

The information in this report that relates to exploration results is based on information compiled by Nicole Galloway Warland, who holds a BSc Applied geology (HONS) and who is a Member of The Australian Institute of Geoscientists. Ms Galloway Warland is an employee of Thor Mining PLC. She has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Nicole Galloway Warland consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

 

 

About Thor Mining PLC

Thor Mining PLC (AIM, ASX: THR; OTCQB: THORF) is a diversified resource company quoted on the AIM Market of the London Stock Exchange, ASX in Australia and OTCQB Market in the United States.

The Company is advancing its diversified portfolio of precious, base, energy and strategic metal projects across USA and Australia. Its focus is on progressing its copper, gold, uranium and vanadium projects, while seeking investment/JV opportunities to develop its tungsten assets.

Thor owns 100% of the Ragged Range Project, comprising 92 km2 of exploration licences with highly encouraging early stage gold and nickel results in the Pilbara region of Western Australia, for which drilling is planned in the second half of 2021.

At Alford East in South Australia, Thor is earning an 80% interest in copper deposits considered amenable to extraction via In Situ Recovery techniques (ISR). In January 2021, Thor announced an Inferred Mineral Resource Estimate of 177,000 tonnes contained copper & 71,000 oz gold¹.

Thor also holds a 30% interest in Australian copper development company EnviroCopper Limited, which in turn holds rights to earn up to a 75% interest in the mineral rights and claims over the resource on the portion of the historic Kapunda copper mine and the Alford West copper project, both situated in South Australia, and both considered amenable to recovery by way of ISR.²³

Thor holds 100% interest in two private companies with mineral claims in the US states of Colorado and Utah with historical high-grade uranium and vanadium drilling and production results.

Thor holds 100% of the advanced Molyhil tungsten project, including measured, indicated and inferred resources⁴, in the Northern Territory of Australia, which was awarded Major Project Status by the Northern Territory government in July 2020.

Adjacent to Molyhil, at Bonya, Thor holds a 40% interest in deposits of tungsten, copper, and vanadium, including Inferred resource estimates for the Bonya copper deposit, and the White Violet and Samarkand tungsten deposits. ⁵

Thor holds 100% of the Pilot Mountain tungsten project in Nevada, USA which is subject to a sale option agreement.6

Notes

1 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210127-maiden-copper.gold-estimate-alford-east-sa.pdf 

2 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20172018/20180222-clarification-kapunda-copper-resource-estimate.pdf

³ www.thormining.com/sites/thormining/media/aim-report/20190815-initial-copper-resource-estimate---moonta-project---rns---london-stock-exchange.pdf

 4 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210408-molyhil-mineral-resource-estimate-updated.pdf  

5 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20200129-mineral-resource-estimates---bonya-tungsten--copper.pdf

 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210901-pilot-mountain-project-us1.8m-sale-option.pdf

 

 

 

TENEMENT SCHEDULE

 

At 30 September 2021, the consolidated entity holds an interest in the following Australian tenements:

Project

Tenement

Area kms2

Area ha.

Holders

Company Interest

Molyhil

EL22349

228.10

Molyhil Mining Pty Ltd

100%

Molyhil

EL31130

9.51

Molyhil Mining Pty Ltd

100%

Molyhil

ML23825

95.92

Molyhil Mining Pty Ltd

100%

Molyhil

ML24429

91.12

Molyhil Mining Pty Ltd

100%

Molyhil

ML25721

56.2

Molyhil Mining Pty Ltd

100%

Molyhil

AA29732

38.6

Molyhil Mining Pty Ltd

100%

Molyhil

MLS77

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS78

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS79

8.09

Molyhil Mining Pty Ltd

100%

Molyhil

MLS80

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS81

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS82

8.09

Molyhil Mining Pty Ltd

100%

Molyhil

MLS83

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS84

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS85

16.18

Molyhil Mining Pty Ltd

100%

Molyhil

MLS86

8.05

Molyhil Mining Pty Ltd

100%

Bonya

EL29701

204.5

Molyhil Mining Pty Ltd

40%

Bonya

EL32167

74.54

Molyhil Mining Pty Ltd

40%

Panorama

E46/1190

35.03

Pilbara Goldfields Pty Ltd

100%

Ragged Range

E46/1262

57.3

Pilbara Goldfields Pty Ltd

100%

Corunna Downs

E46/1340

48

Pilbara Goldfields Pty Ltd

100%

Bonney Downs

E46/1355

38

Pilbara Goldfields Pty Ltd

100%

 

 

 

At 30 September 2021, the consolidated entity holds an interest in the following tenements in the US State of Nevada:

Claim Group

Prospect

Claim Name

Area

Holders

Company Interest

Platoro

Desert Scheelite

NT #55 - 64

45 blocks (611ha or 1,510 acres)

100%

Garnet

NT #9 - 18

 

Pilot Metals Inc

Gunmetal

NT #19 - 22, 6, 7

Good Hope

NT #1 - 5, 41 - 54

BFM 1

Black Fire Claims

BFM1 - BFM109

109 blocks (1,481ha or 3,660 acres)

BFM Resources Inc

100%

BFM 2

Des Scheel East

BFM109 - BFM131

22blocks (299ha or 739Acre)

BFM Resources Inc

100%

Dunham Mill

Dunham Mill

MS1 - MS4

4 blocks

BFM Resources Inc

100%

 

On 30 September 2021, the consolidated entity holds 100% interest in a Uranium and Vanadium projects in US States of Colorado and Utah as follows:

Claim Group

Serial Number

Claim Name

Area

Holders

Company Interest

Vanadium King (Utah)

UMC445103 to UMC445202

VK-001 to VK-100

100 blocks (2,066 acres)

Cisco Minerals Inc

100%

Radium Mountain (Colorado)

CMC292259 to CMC292357

Radium-001 to Radium-099

99 blocks (2,045 acres)

Standard Minerals Inc

100%

Groundhog (Colorado)

CMC292159 to CMC292258

Groundhog-001 to Groundhog-100

100 blocks (2,066 acres)

Standard Minerals Inc

100%

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFELSIUEFSEIS
Date   Source Headline
6th Mar 20247:00 amRNS3D Model Shows Alford East Copper Mineralisation
5th Mar 20247:00 amRNSHalf-year Report
29th Feb 20247:00 amRNSHigh Grade Uranium and Vanadium Assays Results
30th Jan 20247:00 amRNSQuarterly Activities and Cash Flow Report
25th Jan 20247:00 amRNSAlligator completes Initial Investment in ECL
18th Jan 20247:00 amRNSUranium Update
18th Dec 20237:30 amRNSAlligator Energy Invests into ISR Copper
18th Dec 20237:00 amRNSEnviroCopper Ltd to Acquire Alford West Tenement
11th Dec 20237:00 amRNSCopper Recoveries Advance ISR Assessment
4th Dec 20237:00 amRNSHigh-Grade Uranium Intercepts at Groundhog
30th Nov 202312:00 pmRNSConference Attendance
29th Nov 202310:50 amRNSResult of AGM
22nd Nov 20237:00 amRNSDrilling Program Completed
15th Nov 20237:00 amRNSSignificant Uranium Mineralisation Intercepted
8th Nov 20231:30 pmRNSDrilling starts at Molyhil Tungsten Project
7th Nov 20237:00 amRNSCopper Hosting Troughs Defined by ANT Surveys
3rd Nov 20237:05 amRNSIncreases interest in Alford East Project to 80%
3rd Nov 20237:05 amRNSNotice of AGM
31st Oct 20237:00 amRNSQuarterly Activities and Cash Flow Report
26th Oct 20237:00 amRNSCorporate Presentation
23rd Oct 20237:00 amRNSDirector/PDMR Shareholding
18th Oct 20237:30 amRNSUranium Drilling Commences
3rd Oct 20237:00 amRNSANT Geophysical Surveys Commence
20th Sep 20237:00 amRNSEquity Placing to Accelerate Uranium Drilling
18th Sep 20237:30 amRNSASX Trading Halt
13th Sep 20237:00 amRNSKey Environmental Approvals Granted
4th Sep 20237:00 amRNSFleet Space Technologies Collaboration
23rd Aug 202310:56 amRNSResult of GM & Share Capital Consolidation
17th Aug 20237:00 amRNSUranium Drilling Approvals Granted
4th Aug 20237:00 amRNSProposed Share Consolidation and Notice of GM
31st Jul 20237:00 amRNSQuarterly Activities and Cash Flow Report
27th Jul 20237:00 amRNSUranium Targets Identified
31st May 20237:00 amRNSAirborne Magnetic & Radiometric Surveys Commence
22nd May 20237:00 amRNSShareholder and Investor Event
3rd May 20237:00 amRNSRIU Sydney Conference Attendance
28th Apr 20237:33 amRNSQuarterly Activities and Cash Flow Report
26th Apr 20237:00 amRNSAlford East: High-grade Rare Earth Discovery
24th Apr 20237:00 amRNSPositive Vanadium Assay Results
17th Apr 20237:00 amRNSAlford West Project Survey Results
28th Mar 20237:00 amRNSHolding(s) in Company
20th Mar 20237:31 amRNSDirector/PDMR Shareholding
14th Mar 20237:00 amRNSHalf-year Report
8th Mar 20237:00 amRNSCorporate Presentation
2nd Mar 20237:00 amRNSGeophysics Commences at Alford West Project
13th Feb 20238:38 amRNSDirector/PDMR Shareholding
8th Feb 20237:00 amRNSDirector/PDMR Shareholding
31st Jan 20237:50 amRNSQuarterly Activities and Cash Flow Report
23rd Jan 20232:05 pmRNSSecond Price Monitoring Extn
23rd Jan 20232:00 pmRNSPrice Monitoring Extension
17th Jan 20237:00 amRNSName change to "Thor Energy Plc"

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.