Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShearwater Regulatory News (SWG)

Share Price Information for Shearwater (SWG)

Share Price is delayed by 15 minutes
Get Live Data
37.00    -0.50 (-1.33%)
Bid:
36.00
Ask:
38.00
Spread: 2.00 (5.556%)
Market Cap: £8.82m
SWG Live PriceLast checked at - London Stock Exchange

Intraday Shearwater Share Chart

Update on progress at Andash

25 Apr 2005 10:28

Aurum Mining PLC25 April 2005 For immediate release 25 April 2005 AURUM MINING PLC ("Aurum" or "the Company") Update on progress at Andash Aurum Mining plc (AIM: AUR), the company formed to acquire gold and othermineral extraction projects in the Former Soviet Union, is pleased to announceto shareholders results of recent works at its Andash gold and copper propertyin the Kyrgyz Republic. β€’ Four further drill holes completed β€’ Operations unaffected by recent civil unrest in the Kyrgyz Republic Our technical programme is ongoing and the Company has obtained additionaldrilling results from this programme, additionally we have calculated intervaldata as shown below from previous drilling showing high grade zones within theore zone. *DDH # Interval m Length m Au g/t Cu %TX-1 0.0-107.0 107.0 0.95 0.47 Including: 65.0-106.0 41.0 1.31 0.61 TX-2 0.0-149.0 149.0 1.94 0.66 Including: 69.0-107.0 38.0 4.43 1.14 75.0-93.0 18.0 7.57 1.79 TX-3 1.0-174.0 173.0 1.53 0.48 Including: 2.0-127.0 125.0 1.78 0.55 2.0-66.0 64.0 2.32 0.71 44.0-55.0 11.0 7.03 2.00 TX-4 0.0-122.0 122.0 0.96 0.47 Including: 66.0-87.0 21.0 1.74 0.62 P-1 0.0-17.0 17.0 1.04 0.59 42.0-75.0 33.0 0.50 0.21 P-2 0.0-33.0 33.0 0.59 0.20 83.0-116.0 33.0 1.12 0.44 P-3 0.0-164.0 164.0 No mineralisation P-4 0.0-173.8 173.8 No mineralisation \* The drill holes series TX - were drilled for resource calculation andmetallurgical purposes. The drill holes series P - were drilled fordelineation of mineralization on the flanks of ore body and for geotechnicalsamples. From these data we have designed a detailed in-fill drilling programme of 6000mof reverse circulation and 2000 m of diamond core drilling to complete therequirements for independent ore resource calculations, open pit design andoptimisation currently being conducted by Wardell-Armstrong International Ltd. Aurum management is pleased to see that its technical plans are on schedule withresults confirming the expected thickness of the Andash deposit and thecorrelation of the copper and gold grades. The Andash project as stated previously has Soviet standard resources quoted asfollows: Zone 1 - 634000 oz and approx 200 Mlbs of copper contained (@ 0.5 gAu/t cut-off) Zone 2 - 287000 oz of gold Zone 3 - 124000 oz of gold Kyrgyz Republic The Company is pleased to inform shareholders that the recent disruption seen inthe Kyrgyz Republic over the past few weeks did not impact the operations of theAndash project development and the drilling, sampling and assaying of ourexploration works did not stop during this period. Sean Finlay Chairman For further information please contact: Aurum MiningSean Finlay, Chairman Tel: + 353 1 8030401 WH IrelandTim Cofman Tel: 0121 616 2101 Buchanan Communications Tel: 020 7466 5000Mark Court/Charlie Howard This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Sep 20099:32 amRNSBlocklisting Interim Review
4th Sep 20099:31 amRNSBlocklisting Interim Review
1st Sep 20094:14 pmRNSResult of AGM
1st Sep 20097:00 amRNSAGM Statement and IMS
28th Aug 20094:35 pmRNSPrice Monitoring Extension
25th Aug 20093:33 pmRNSHolding(s) in Company
13th Aug 20092:03 pmRNSDirector/PDMR Shareholding
11th Aug 20097:00 amRNSRe Contract
24th Jul 20092:40 pmRNSDirector/PDMR Shareholding
24th Jul 20092:16 pmRNSHolding(s) in Company
20th Jul 20094:21 pmRNSNotice of AGM and Ancillary Documents
6th Jul 20093:05 pmRNSHolding(s) in Company
30th Jun 20097:00 amRNSGrant of options re Andash disposal
30th Jun 20097:00 amRNSFinal Results
29th Jun 200910:30 amRNSRe Contract
16th Jun 20091:48 pmRNSHolding(s) in Company
15th Jun 20094:21 pmRNSExtension to Mining Licence commitments
15th Jun 20092:55 pmRNSHolding(s) in Company
15th Jun 20099:09 amRNSRe Contract
11th Jun 200912:29 pmRNSChange of Registered Office
10th Jun 20093:32 pmRNSHolding(s) in Company
4th Jun 20097:00 amRNSContract Win
19th May 20094:40 pmRNSSecond Price Monitoring Extn
19th May 20094:35 pmRNSPrice Monitoring Extension
8th May 20093:04 pmRNSHolding(s) in Company
30th Apr 200910:11 amRNSTotal Voting Rights
27th Apr 20097:00 amRNSPre-Close Statement
14th Apr 20097:00 amRNSRe Contract
8th Apr 20093:46 pmRNSTransaction in Own Shares
3rd Apr 20097:00 amRNSTransaction in Own Shares
2nd Apr 20093:23 pmRNSHolding(s) in Company
1st Apr 200911:54 amRNSReduction of Capital - Court Approval
31st Mar 200910:31 amRNSTotal Voting Rights
30th Mar 200912:26 pmRNSHolding(s) in Company
26th Mar 200910:47 amRNSHolding(s) in Company
24th Mar 20095:21 pmRNSHolding(s) in Company
23rd Mar 200910:53 amRNSHolding(s) in Company
20th Mar 20095:12 pmRNSTransaction in Own Shares
19th Mar 20097:00 amRNSTransaction in Own Shares
17th Mar 200912:04 pmRNSHolding(s) in Company
17th Mar 200912:03 pmRNSHolding(s) in Company
17th Mar 200910:22 amRNSReturn of Capital - Timetable
13th Mar 20096:02 pmRNSTransaction in Own Shares
11th Mar 200912:48 pmRNSResult of General Meeting
10th Mar 20097:00 amRNSInterim Management Statement
4th Mar 20093:48 pmRNSBlocklisting Interim Review
4th Mar 20093:46 pmRNSBlocklisting Interim Review
27th Feb 20094:41 pmRNSSecond Price Monitoring Extn
27th Feb 20094:36 pmRNSPrice Monitoring Extension
23rd Feb 20093:56 pmRNSCirc re. General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.