Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShearwater Regulatory News (SWG)

Share Price Information for Shearwater (SWG)

Share Price is delayed by 15 minutes
Get Live Data
37.00    -0.50 (-1.33%)
Bid:
36.00
Ask:
38.00
Spread: 2.00 (5.556%)
Market Cap: £8.82m
SWG Live PriceLast checked at - London Stock Exchange

Intraday Shearwater Share Chart

Andash Drilling Update

25 May 2006 07:00

Aurum Mining PLC25 May 2006 For immediate release 25 May 2006 AURUM MINING PLC ("Aurum" or "the Company") Drilling Update on the Andash Deposit Aurum Mining plc (AIM: AUR), the company formed to acquire gold and othermineral extraction projects in the Former Soviet Union (FSU), is pleased toprovide an update on progress at its Andash gold and copper project in theKyrgyz Republic following the completion of an infill drill programme at AndashZone 1 and of on-going exploration work at Zones 2 and 3. Highlights β€’ Completion of infill drilling programme for Zone 1 meets expectations. Inferred resources will be transferred to Measured and Indicated β€’ Initial exploration drill results confirm extensive mineralisation of Zones 2 and 3 β€’ On track for completion of Feasibility Study in September The infill drill programme at Zone 1 was designed to provide further details onthe copper and gold grades in the Zone 1 orebody to allow the completion of theFeasibility Study while the exploration work at Zones 2 and 3 was designed togive an improved understanding of the additional resource opportunities withinthe licence area, including the location of higher grade deposits. The infill programme at Zone 1 comprised 19 NQ core holes totalling 2,652mdesigned to confirm previous copper and gold grades, but also to provide a morerobust and up-graded classified resource. Although all of the assay results arenot yet available, initial results and inspection of cores confirm previousestimates. This will allow Wardell Armstrong International (WAI) to update thecurrent resource model to bring all the inferred category to Measured andIndicated as stipulated by the JORC Classification and complete the FeasibilityStudy by September 2006. Aurum has also completed 5 HQ core holes totalling 713mfor geotechnical purposes and resource estimation in and around the proposedpit. In addition, the Company has embarked on an aggressive exploration programme totest the extent of Zones 2 and 3, which lie to the west of Zone 1, and to lookat the possible faulted extension to Zone 1 itself. Recent analysis of new geological and geophysical data on Zones 2 and 3 greatlyimproves our understanding of the structural and morphological characteristics.Most mineralised zones are confined to approximate east-west trending, gentlynortherly dipping structural-tectonic zones, with thickness variations from tensto hundreds of metres. These zones appear further localised by cross-faults. Preliminary work has indicated that the distance between orebodies isapproximately 200m. They have variable thickness and can be traced along strikefor more than 1km. The gold and copper content also appears variable from nearbackground levels up to tens of g/t gold and 1.5% copper. The proliferation of altered, hornblende-rich host rocks in proximity to normalcomposition granodiorites appears to be an important feature for the detectionof further mineralisation. Such mineralisation was uncovered during cleaning anddeepening of an old trench at the presumed continuation of Zone 2 in hornblendesiltstones giving an intersection of 4m at 13.3g/t Au. Importantly, halos ofsuch hornblende alteration have been found to be associated with geophysicalanomolies (IP) characterised by high polarisation (4-6%), which may beassociated with concealed sulphide mineralisation. This suggests that other IPanomalies may indicate similar alteration zones. To test this, Aurum has embarked on a preliminary exploratory drilling programmeon a 200x80-280m grid, with sections aligned across the known mineralised zones,and to intersect the large IP anomaly identified to the north of Zones 2 and 3.Aurum proposes to drill 5-6 sections with 3-4 holes per section to a depth of150-250m, giving a total distance of some 3,000m. However, this programme willbe constantly evolving as new geological data emerges. The first drilling results from the new programme have been received. Threeholes, P15, P16 and P17, drilled approximately 50m apart all intersectedmineralization in zones 2 and 3, with hole P17 testing the near surface ore zoneand holes P15 and P16 intersecting the structure further down dip. Holes P15 andP16 proved the presence of blind mineralisation localised in a brecciatedgranodiorite (similar to Zone 1) and associated with hornblende siltstone. HoleP17 also intercepted mineralised breccia and hornblende siltstone. This supportsour hypotheses of using the hornblende siltstone, which shows up as an IPanomaly, as an exploration target. Results from the 3 holes show the ore zone intersections vary in thickness. Inhole P17, where the ore zone comes close to surface, mineralization is seen tooccur as thin stringers in a clay rich formation. This becomes more coherentdown dip as seen in holes P15 and P16. The ore zone is seen to increase inthickness and grade in the down dip portion to approx 50m in hole P15, with goldvalues varying between 1.5g/t and 0.31g/t. Although the average grade from the 3holes is 0.49g/t, initial interpretation indicates that that selective mining ofthe ore zone would be possible. Intersections of higher grade in hole P15 (26mat 1.51g/t) indicate that gold grade improves down dip. This confirms what hasbeen seen in previous drilling, which has shown that the gold content increasesto an average of 1.4-1.5g/t to a maximum of 2.23-2.35g/t. Higher level targetsanalogous to this are the aim of this present exploration programme.Encouragingly, dozer road preparation for hole P37 (the next hole to be drilled)has already cut previously unknown surface mineralisation. WAI has reviewed the planned exploration programme and is monitoring progress tooptimise the probability of the discovery of additional, near surfacemineralisation. Mark Jones, Aurum Mining's Chief Executive, said: "These results representanother important step forward for the Company and give us confidence both inmeeting our target of completing our Feasibility Study for Andash Zone 1 inSeptember and increasing the resource level in Zones 2 and 3." For further information: Aurum Mining plc Tel: 020 7478 9050Mark Jones, Chief Executive Arbuthnot Securities Tel: 020 7012 2000Graham Swindells Buchanan Communications Tel: 020 7466 5000Mark Court/Amy Rajendran Notes to editors Aurum Mining joined the AIM market of the London Stock Exchange in May 2004 withthe strategy of seeking, evaluating and acquiring gold and other mineralextraction projects in the Former Soviet Union (FSU). In January 2005 theCompany completed its first acquisition, giving the Company an explorationlicence over the Andash gold and copper project in the Kyrgyz Republic. In itsState Register, the State Commission of Resources of the Kyrgyz Republic hasincluded 21.7 million tonnes of C1 and C2 reserves from the project, amountingto gold and gold equivalent of more than 1.5 million ozs. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Aug 20215:43 pmRNSDirector/PDMR Shareholding
28th Jul 20217:00 amRNSFinal Results
20th Jul 20217:00 amRNSNotice of Results and Presentation to Investors
13th Jul 202111:39 amRNSHolding(s) in Company
6th May 20217:00 amRNSFramework Agreement Renewal
30th Apr 20213:21 pmRNSHolding(s) in Company
22nd Apr 20217:00 amRNSPost Close Trading Update
12th Mar 202110:42 amRNSHolding(s) in Company
26th Feb 20217:00 amRNSExercise of options
22nd Feb 20213:11 pmRNSHolding(s) in Company
15th Feb 202110:02 amRNSHolding(s) in Company
26th Jan 20217:00 amRNSGrant of Options under SAYE Scheme
11th Jan 20212:54 pmRNSHolding(s) in Company
6th Jan 20217:00 amRNSContract Win
29th Dec 20207:00 amRNSTrading update and New contracts secured
16th Dec 20207:00 amRNSHolding(s) in Company
8th Dec 20209:47 amRNSDirector/PDMR Shareholding
25th Nov 20207:00 amRNSResults for the six months ended 30 September 2020
12th Nov 20207:00 amRNSNotice of Results and Presentation to Investors
22nd Oct 20207:00 amRNSH1 Trading update
25th Sep 20207:00 amRNSResult of AGM
14th Sep 20201:29 pmRNSRelease of Holdback Consideration Shares
1st Sep 20207:00 amRNSPosting of Annual Report and Notice of AGM
20th Aug 20207:00 amRNSTrading Update
29th Jul 20207:00 amRNSFinal Results
30th Jun 20207:00 amRNSNotice of Results
24th Apr 20204:41 pmRNSSecond Price Monitoring Extn
24th Apr 20204:35 pmRNSPrice Monitoring Extension
24th Apr 20201:58 pmRNSResults of Placing and Total Voting Rights
24th Apr 20207:00 amRNSProposed placing
2nd Apr 20207:00 amRNSPre-close statement
27th Mar 20207:00 amRNSContract win
25th Mar 20207:00 amRNSStatement re COVID-19 and contract wins
24th Mar 20205:44 pmRNSHolding(s) in Company
26th Feb 20207:00 amRNSIssue of Equity
27th Nov 20197:00 amRNSInterim Results
19th Nov 201911:30 amRNSNotice of Results
30th Oct 20197:00 amRNSBrookcourt Solutions secures EUR 0.5 M contract
28th Oct 20198:53 amRNSDirector/PDMR Shareholding
24th Oct 20197:01 amRNSHalf year trading update
22nd Oct 20197:00 amRNSGroup wins 5 awards at Computing Security Awards
10th Oct 20197:00 amRNSBrookcourt Solutions secures £8.5m contract
26th Sep 20199:11 amRNSDirector/PDMR Shareholding
25th Sep 20191:41 pmRNSResult of AGM
17th Sep 20197:00 amRNSPentest secures million-dollar contract
2nd Sep 20197:05 amRNSIssue of Equity
2nd Sep 20197:00 amRNSNotice of AGM and Proposed Share Reorganisation
30th Aug 20198:30 amRNSSecurEnvoy signs distribution agreement
31st Jul 20197:00 amRNSFinal Results
26th Jul 20197:00 amRNSXcina Consulting secures contract with Parkmobile

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.