Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Resources PLC Regulatory News (SRES)

Share Price Information for Sunrise Resources PLC (SRES)

Share Price is delayed by 15 minutes
Get Live Data
0.023    0.00 (0.00%)
Bid:
0.021
Ask:
0.025
Spread: 0.004 (19.048%)
Market Cap: £2.16m
SRES Live PriceLast checked at - London Stock Exchange

Intraday Sunrise Resources PLC Share Chart

CS PROJECT AGREEMENT, REGARDING PROCESSING PLANT

20 Sep 2019 13:00

RNS Number : 1533N
Sunrise Resources Plc
20 September 2019
 

 

 

 20 September 2019

 

SUNRISE RESOURCES PLC

("the "Company")

 

 

CS PROJECT AGREEMENT, GRINDING & MINERAL PROCESSING PLANT

 

 

Sunrise Resources plc (ticker symbol 'SRES") is pleased to announce that it has signed an agreement incorporating a detailed term sheet ("the Agreement") allowing the Company to evaluate and, if appropriate, to lease a mothballed grinding and mineral processing plant located close to the Company's CS Pozzolan-Perlite Project in Nevada USA ("the Plant").

 

The Agreement is made with the owners of the Plant, Tonopah Resources Inc. and its ultimate controlling shareholder, Granite Peak Holdings LLC. The Plant is located at Millers, 15 miles by road from the CS Project, adjacent to Highway 6 and some 13 miles west of the town of Tonopah. Millers is an abandoned townsite where a 100-stamp mill was built in 1906 to treat silver and gold ores from the silver mines of Tonopah. The Plant now of interest was built in 1976 by Lurghi Engineering to reprocess the tailings from the original mill which is no longer present.

 

The Plant operated successfully until the 1980s and comprises a large ball mill, mill building, gantry cranes and downstream silver leaching and extraction plant. The Plant will require additional permits and significant modification if it is to be used for producing a ground pozzolan product including the addition of front-end crushing facilities and mill-downstream size classification. The Plant site has mains power connected, highway access and is located on a parcel of private land owned by Tonopah Resources Inc.

 

The Agreement provides for a 9-month period during which the Company can carry out due diligence to evaluate the adaptability of the Plant for grinding pozzolan. If the Plant is unsuitable the Plant area could be leased as a favourable site for a completely new pozzolan grinding plant.

 

Should the Company's due diligence prove positive the Agreement allows Sunrise Resources to elect that all parties use their best endeavours to negotiate in good faith and enter into a further agreement ("the Lease Agreement") whereby Sunrise Resources will lease a 5.5-acre area containing and surrounding the Plant. The Agreement provides that the Lease Agreement will be on substantially the same terms - and on the same financial terms - as those contained in a detailed term sheet annexed to, and forming part of, the Agreement. This term sheet provides for a 20-year lease, extendable by mutual agreement for two further periods of 10 years each.

 

Should the Company proceed with the Lease Agreement it will pay to Tonopah Resources an annual lease payment of $25,000 per annum and an amount of 22 cents per ton for any material processed and sold from the site. These amounts will be fixed for three years and then subject to annual adjustment for inflation.

 

Commenting today Sunrise Executive Chairman Patrick Cheetham said: "We see this agreement as an important piece of the jigsaw we are putting together for the CS Project. Our short-term objective is to start producing natural pozzolan as a by-product of processing perlite and by selling run-of-mine natural pozzolan to customers with existing grinding facilities. However, we will secure the widest market and the best price by producing a ground pozzolan product and leasing of the Plant would bring forward this objective. The Plant is ideally located for the Project and the markets we are targeting."

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

 

 

Further information:

 

Sunrise Resources plc

Patrick Cheetham, Executive Chairman

Tel: +44 (0)1625 838 884

 

Beaumont Cornish Limited

Nominated Adviser and Broker

James Biddle/Roland Cornish

Tel: +44 (0)207 628 3396

 

 

Shares in the Company trade on AIM under the symbol "SRES" and also on the NEX Exchange (Secondary Market).

 

 

 

Location Plan: Millers Grinding Plant and Proposed Lease Area

 

 

 

 

 

 

 

Photo: Ball Mill inside Mill Building

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCFBLFLKKFZBBK
Date   Source Headline
7th Aug 20138:00 amRNSAdmission to trading and Total Voting Rights
1st Aug 201312:14 pmRNSIssue of Equity
25th Jul 20137:00 amRNSNew gold projects and Cue Diamond project update
15th May 201311:53 amRNSHalf Yearly Report
25th Mar 20137:00 amRNSPositive Diamond Results
19th Feb 20133:39 pmRNSResult of AGM
18th Feb 20137:00 amRNSCue Diamond Project Update
29th Jan 20131:13 pmRNSUpdate re drilling results
22nd Jan 20137:00 amRNSCue Diamond Sampling Results
4th Jan 20137:00 amRNSDirector Share Purchase & Issue of Equity
20th Dec 20127:00 amRNSGrant of warrants
12th Dec 20121:30 pmRNSFinal Results
3rd Dec 20127:00 amRNSCue Diamond Project - new Kimberlite Occurrences
12th Nov 20127:00 amRNSEquity Finance Facility Warrants Pricing
1st Nov 20127:00 amRNSStudy Update - Derryginagh Barite Project
25th Oct 20127:00 amRNS£3m Equity Finance Facility Secured
23rd Oct 20127:00 amRNSCue 1 Kimberlite confirmed diamondiferous
22nd Oct 20127:00 amRNSResponse to Press Comment & Market Update
25th Sep 20127:00 amRNSDerryginagh Project Update
6th Sep 20127:00 amRNSCue Project Update
31st Aug 20129:15 amRNSHolding(s) in Company
21st Aug 20127:00 amRNSProject Update
30th Jul 20124:48 pmRNSIssue of Equity
31st May 20127:00 amRNSDirectorate Change
30th May 20127:00 amRNSDerryginagh Project Update
18th May 20127:00 amRNSHalf Yearly Report
26th Apr 20127:00 amRNSProject Updates
27th Feb 201212:20 pmRNSIssue of Shares and Warrants
24th Feb 20123:29 pmRNSResult of AGM
16th Feb 20127:00 amRNSPlacing to raise £600,000
6th Feb 20127:00 amRNSDrilling Results, Derryginagh Drilling Project
16th Jan 20127:00 amRNSAnnual Report & Accounts
12th Jan 20127:00 amRNSDrilling Program Completed
15th Dec 20117:00 amRNSFinal Results
19th Sep 20117:00 amRNSNew Derryginagh Drill Contract
13th Sep 201110:29 amRNSDrill & Sampling Results - Long Lake Gold Project
31st Aug 20115:04 pmRNSTotal Voting Rights
11th Aug 201111:42 amRNSDerryginagh Drill Update
5th Aug 20113:09 pmRNSCorrection - Directors Share Issue
4th Aug 20119:58 amRNSDirectors Share Issue
6th Jul 20117:00 amRNSDerryginagh Barite Drill Start
5th Jul 20117:00 amRNSLong Lake Drill Start 5 July 2011
14th Jun 20117:00 amRNSDrill Contract, Long Lake Gold Project
3rd Jun 20117:00 amRNSIssue of Equity
23rd May 20117:00 amRNSHalf Yearly Report
19th May 20117:00 amRNSPositive Concept Study
27th Apr 20117:00 amRNSLong Lake Option
21st Mar 20117:00 amRNSExploration Update
3rd Mar 20119:02 amRNSDirector/PDMR Shareholding
24th Feb 20117:00 amRNSCue Diamond Project Exploration Licence Granted

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.