Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
1.75    0.00 (0.00%)
Bid:
1.70
Ask:
1.80
Spread: 0.10 (5.882%)
Market Cap: £4.11m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

Operations Update

28 Feb 2007 07:01

Sound Oil PLC28 February 2007 28 February 2007 Sound Oil plc("Sound Oil" or the "Company") Operations Update Sound Oil announces the following operational updates: Citarum Production Sharing Contract - Java, Indonesia Preparation is in its final stages for Pasundan No. 1, Sound Oil's first well.The Great Wall Drilling Company Rig 93, the Company's preferred drilling rig, iscurrently mobilizing from East Java to the laydown area close to the wellsite inWest Java. Despite the very wet conditions the mobilisation is 95% complete. Therig will be handed over to the operator shortly, following routine certificationby the Indonesian authorities at the end of the current extensive overhaul. Pasundan No. 1 is expected to commence drilling on 28 March although this mayslip a few days if the remaining critical rig items from China are not on siteby early March. The current operation is setting the 30 inch conductor pipeprior to spudding the well. The wellsite has suffered from the local extreme weather conditions and someland slippage has occurred which will require 7 days remediation prior todrilling. Some concrete piling of the site will be needed during drillingoperations. Pasundan No. 1 well is programmed to a total depth of 10,322 feet with aprospective objective at approximately 6,300 feet and deeper target horizonsbelow 8,500 feet. A second well, Kujang No. 1, will be drilled back to back with Pasundan and willbe located on a separate structure some 8 km to the north. Prospective recoverable resources for the Pasundan and Kujang prospects are 255and 322 billion cubic feet of gas respectively (P50 cases*). It is anticipated that an $11 million dollar 2D seismic programme extending to850 km will be acquired during the year, over a number of prospective areasacross the Citarum acreage. Sound Oil holds a 20% interest in BPREC, the 100% owner and operator of theProduction Sharing Contract. Bangkanai Production Sharing Contract - Kalimantan, Indonesia The Company has recently undertaken seismic interpretation studies over theKerendan Gas Field area in the central part of the Bangkanai PSC. As a result, alarge new prospect has been identified underlying the existing KerendanLimestone gas accumulation. The new prospect may contain up to 540 billion cubicfeet (P10*) of recoverable gas resources. A future well will be designed to passthrough the known Kerendan Limestone gas accumulation at 9,000 feet, containingreserves of 238 billion cubic feet (Proven + Probable), on its way down to thedeeper prospect at around 14,000 feet. It is anticipated that a new seismic programme will be acquired over a number ofareas during the summer including the Kerendan Gas Field, the potentially largeJupoi prospect and a number of leads Sound Oil plc has a 34.99% interest in the license through its wholly ownedsubsidiary Mitra Energia Ltd. Option award The Board of Directors have today granted options over the Company's ordinaryshares as follows: Dr Orbell, 2,000,000; Mr Rachmantio 1,250,000; Mr Heath1,000,000. The options' exercise price will be that of Sound Oil's market priceper share at today's close. The options will be vested yearly in 33.3% tranchesduring the next three years and expire in ten years. Dr Michael J Cope, Head of Exploration, Sound Oil plc, has reviewed and approvedthe operational update information contained in this announcement relating toSound Oil's Citarum and Bangkanai PSCs. Dr Cope holds BSc and PhD degrees ingeology from the University of London and has been a member of the AmericanAssociation of Petroleum Geologists since 1987 and is a Fellow of the GeologicalSociety of London. * Prospective resources, consistent with SPE (The Society of PetroleumEngineers) guidelines, are quantified in terms of the statistical probability tofind a given recoverable hydrocarbon (oil or gas) volume in a prospectivestructure considering all the geological variables involved. The P50 figureindicates a 50% chance of finding a given volume and is generally considered asthe best estimate. The P10 figure indicates a 10% chance of finding a givenvolume and is generally used to express the high estimate. Further information on the Company's operations is set out in a presentation which may be downloaded from Sound Oil's website: http://www.soundoil.co.uk/news/presentation.pdf Contacts: Tim Thompson, Buchanan CommunicationsTel + 44 (0) 207 466 5000 Gerry Orbell, Sound Oil plcTel +44 (0) 7903 861145 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Jun 20153:35 pmRNSResult of AGM, TVR and Update re Funding
25th Jun 20152:19 pmRNSShareholdings of Directors
24th Jun 20157:00 amRNSResult of Open Offer
19th Jun 20157:00 amRNSManagement Changes
17th Jun 201510:00 amRNSPosting of Supplementary Circular
16th Jun 20157:00 amRNSDora / Dalla - EIA Approval
16th Jun 20157:00 amRNSNervesa Update & Open Offer Supplementary Circular
8th Jun 20153:00 pmRNSResult of General Meeting
8th Jun 20157:00 amRNSNervesa and Open Offer Update
8th Jun 20157:00 amRNSMoroccan Country Entry - Signature of Farm In
2nd Jun 20157:00 amRNSPosting of Annual Report and Notice of AGM
29th May 20151:00 pmRNSTotal Voting Rights
21st May 20151:00 pmRNSOpen Offer and Notice of General Meeting
20th May 20157:00 amRNSIssue of Equity
20th May 20157:00 amRNSDrilling Update - Nervesa Second Well
18th May 20157:00 amRNSOpen Offer Timetable
11th May 20157:00 amRNSDrilling Update - Nervesa Second Well
11th May 20157:00 amRNSMorocco - Tendrara Licence
29th Apr 201511:00 amRNSDrilling Update - Nervesa Second Well
28th Apr 20151:30 pmRNSPlacing, Issue of Warrants and Intended Open Offer
28th Apr 20157:00 amRNSPreliminary Results
24th Apr 20157:00 amRNSNervesa Second Well - Drilling Commences
17th Apr 20157:00 amRNSNervesa Field - Production Concession
2nd Apr 20157:00 amRNSNew CPR
17th Mar 20157:00 amRNSBadile EIA Approval
17th Feb 20157:00 amRNSNervesa Drilling Authorisation
10th Feb 20157:00 amRNSNervesa Production Concession
22nd Jan 20157:00 amRNSIssue of Equity re RBL Facility
13th Jan 20157:00 amRNSWithdrawal of Intended Offer for Antrim Energy Inc
12th Jan 20157:00 amRNS2014 Production Update
12th Dec 20147:00 amRNSNervesa EIA Final Approval
24th Nov 20147:00 amRNSIntended offer for Antrim Energy Inc.
13th Nov 20147:00 amRNSNervesa Reserve Based Lending - Signature
15th Oct 20144:45 pmRNSHolding(s) in Company
13th Oct 20147:00 amRNSGas Sales Contracts and Badile Land Purchase
23rd Sep 20147:00 amRNSNervesa Reserve Based Lending - Heads of Terms
17th Sep 20147:00 amRNSHalf Yearly Report
8th Sep 20147:00 amRNSDirectorate Change
2nd Sep 20147:00 amRNSNervesa EIA Approval
8th Aug 20143:00 pmRNSLaura and SMG Rig
7th Aug 20147:00 amRNSBadile Land Purchase and Long Lead Items
1st Aug 20147:00 amRNSNervesa Long Lead Items
31st Jul 20143:00 pmRNSTotal Voting Rights
29th Jul 20147:00 amRNSInstitutional Investment
29th Jul 20147:00 amRNSCasa Tiberi First Gas
23rd Jul 20147:00 amRNSInstitutional Investment
17th Jul 20147:00 amRNSAppointment of Director
15th Jul 20147:00 amRNSSMG CPR
10th Jul 20149:37 amRNSIssue of Equity
26th Jun 201411:31 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.