focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSosandar Regulatory News (SOS)

Share Price Information for Sosandar (SOS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.00
Bid: 11.50
Ask: 12.50
Change: 0.00 (0.00%)
Spread: 1.00 (8.696%)
Open: 12.00
High: 12.00
Low: 12.00
Prev. Close: 12.00
SOS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further drilling confirms continuity of gold zone

14 Oct 2014 07:00

RNS Number : 1720U
Orogen Gold PLC
14 October 2014
 



Orogen Gold plc

("Orogen" or the "Company") 

 

Mutsk gold project Armenia

Further drilling confirms continuity of gold zone

Orogen Gold plc (AIM: ORE), the AIM quoted gold exploration company, provides the following update on the Company's diamond drilling programme at the Mutsk gold project in southern Armenia.

 

Highlights:

 

· Latest hole within main zone confirms continuity of gold zone down-dip to the west

· OG14-30 cuts 28.9m interval assaying 0.70g/t Au, including 4.8m assaying 1.52g/t Au

· Two holes at the northern end of 1.6km target zone cut wide sections of hydrothermal alteration and pyrite mineralisation and narrow base metal veining

· Drilling along the Mutsk gold zone is ongoing and further results will be reported over the coming weeks

 

Ed Slowey, Chief Executive of Orogen, commented: "The latest holes provide additional detail on the extent of the mineralising system and gold-bearing intervals at Mutsk. Drilling will continue as long as the weather window remains open and further results will be reported over the coming weeks." 

Four additional diamond drill holes were completed at the Mutsk property for which core assays were received. All holes were angled at 55 degrees towards the east. Hole OG14-30 was sited 30m to the west of hole OG14-27 on Section 3710N, where a wide gold-mineralised interval was reported previously in hydrothermally altered and brecciated volcanic rocks. The new hole cut a mineralised zone grading 0.70g/t Au over a width of 28.9m between 60.3-89.2m down-hole depth. Within this zone, a shorter interval of 4.8m graded 1.52g/t Au from 77.2-82.0m depth. This hole confirms that the target zone extends to the west on this section similar to the sections already drill tested 90m to the south and 240m to the north.

Two holes drilled at the northern end of the 1.6km Mutsk structural zone, OG14-26a and OG14-31, intersected extensive alteration and pyrite mineralisation, as well as some narrow base metal veins, however these particular holes were found not to be gold-bearing.

The fourth hole, OG14-29, was sited on Section 4200N at the northern end of the main mineralised zone discovered by previous vertical drilling along the main structure. This hole cored a zone of intermittent alteration and pyrite mineralisation containing some low-order gold values at shallow depths, confirming that the main target zone extends over at least 600m of strike. It is becoming clearer that as the strong alteration and accompanying gold mineralisation can vary over quite short distances, further drill testing of this area is required.

Drilling along the Mutsk gold zone is ongoing and further results will be reported over the coming weeks. Work is planned to continue at site as long as weather and ground conditions permit, before the onset of winter.

For maps of the Mutsk property please refer to the Mutsk project page on the Orogen website at www.orogengold.com.

Sample Assaying

Gold assaying is undertaken at an analytical laboratory located in Kapan in the south of Armenia. The laboratory is operated by the international SGS Laboratory Services company. Orogen inserts certified standards, blanks and duplicate samples into its sample batches to check the accuracy of the assay results and has also carried out confirmatory checking of duplicate samples at another international laboratory.

About the Mutsk Project

The Mutsk Project is located in southern Armenia at about 2,000m elevation and is three and a half hours' drive from the capital Yerevan. The site is accessible most of the year other than during the core winter months. Maps showing the location and details of the project are available on the Company's website.

Limited historic exploration had been carried out until drilling by Georaid CJSC in 2011, which intersected low sulphidation epithermal-type pyrite-gold mineralisation in altered and brecciated tuffs, similar in age and gold grade to those that host the Lydian International high sulphidation Amulsar gold deposit (4.1 million ounces in Measured, Indicated and Inferred Resources at an average grade of 1g/t Au) located 30km to the northwest, also in Armenia.

Orogen has an exclusive agreement with Georaid CJSC to earn an 80% interest in the property by spending a total of US$2.5m by the end of August 2016.

 

-ENDS-

 

Approval

Ed Slowey, CEO of Orogen, is a Competent Person as defined by various international instruments and takes responsibility for the release of this information.

 

Enquiries:

 

Orogen Gold Plc

+353 1662 8395

Ed Slowey, CEO

Alan Mooney, FD

WH Ireland Limited (Nominated Adviser and Joint Broker)

+44 (0) 20 7220 1666

Tim Feather

James Bavister

Hume Capital Securities Plc (Joint Broker)

+44 (0) 20 3693 1470

Jon Belliss

Walbrook (Public Relations and Investor Relations)

+44 (0) 20 933 8780

Paul Cornelius / Guy McDougall

 

About Orogen Gold

Orogen Gold plc is a UK public company quoted on the London Stock Exchange AIM market (ticker: ORE). The Company is focused on mineral exploration and development in Europe and is currently operating two gold exploration projects: a) at Mutsk in Armenia and b) at Deli Jovan in Serbia. The Mutsk gold project in Armenia was optioned by Orogen early in 2013 to follow-up reports of a new epithermal discovery within an established gold district. At Deli Jovan the historic high-grade gold mining camp was last in production prior to World War II and has been significantly under-explored in modern times. The Mutsk project has been prioritised by the Company due to the clear potential evident on the property.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFSEIILVLIS
Date   Source Headline
4th Jul 20167:00 amRNSDrilling Recommences at Mutsk Project
27th Jun 20167:00 amRNSCompletion of Silverton Earn-In Agreement
16th Jun 201611:00 amRNSFurther re: Mutsk MOU and JV
8th Jun 201610:48 amRNSResult of AGM
9th May 20167:00 amRNSFinal Results
21st Apr 20162:00 pmRNSNevada Gold-Silver Deal Signed
14th Dec 20157:00 amRNSMutsk Drilling Update
27th Nov 201512:36 pmRNSMutsk Drilling Update
15th Oct 20157:00 amRNSDiamond Drilling re-commences in Armenia
30th Sep 20154:52 pmRNS£450,000 Equity Fundraising
30th Sep 20157:00 amRNSAppt CEO, Grant of Options, Other Board Changes
30th Sep 20157:00 amRNSHalf Yearly Report
10th Jun 201512:29 pmRNSResult of AGM
11th May 20157:00 amRNSFinal Results for the year ended 31 December 2014
1st Apr 20157:00 amRNSSignificant Shareholder
27th Mar 20157:00 amRNSIssue of Equity
24th Mar 201512:17 pmRNSAppointment of Broker
20th Mar 201512:46 pmRNSRe: Broker
3rd Feb 20157:00 amRNSMutsk gold project update and Issue of Equity
19th Dec 20143:05 pmRNSResult of General Meeting
18th Dec 20147:00 amRNS4,000m Drilling Programme Completed on Schedule
25th Nov 201412:00 pmRNSPublication of Circular and Notice of GM
17th Nov 20147:00 amRNSFurther drilling extends gold discovery at Mutsk
3rd Nov 20147:00 amRNSChange of Adviser
20th Oct 20144:18 pmRNSDirector/PDMR Shareholding
20th Oct 20147:00 amRNSIssue of Equity and Total Voting Rights
16th Oct 20147:00 amRNSPlacing of £75,000 with Directors
14th Oct 20147:00 amRNSFurther drilling confirms continuity of gold zone
22nd Sep 20147:00 amRNSFurther drill assays extend gold discovery - Mutsk
16th Sep 20147:00 amRNSInterim Results
10th Sep 20147:00 amRNSPlacing raising £1.125m - further drilling - Mutsk
8th Sep 20147:00 amRNSDrilling - Wide zones of gold mineralisation
24th Jul 20147:47 amRNSAppointment of Director
7th Jul 20147:00 amRNSMobilisation of drill rig
1st Jul 20147:00 amRNSDrilling for Equity Agreement
3rd Jun 20147:00 amRNSMutsk Gold Project, Armenia - Operational Update
19th May 20141:25 pmRNSResult of AGM
23rd Apr 20147:00 amRNSFinal Results for the year ended 31 December 2013
7th Apr 20147:00 amRNSMutsk gold project - Operational Update
3rd Apr 20149:00 amRNSHolding(s) in Company
28th Mar 20144:16 pmRNSUK Investor Show - Saturday 5 April
3rd Mar 20147:00 amRNSMutsk results update and programme for Spring 2014
8th Jan 20149:56 amRNSHolding(s) in Company
19th Dec 20137:00 amRNSOperational Update
16th Dec 20132:08 pmRNSHolding(s) in Company
6th Nov 20137:00 amRNSDirector Resignation
23rd Oct 20132:16 pmRNSDrilling commences at Mutsk, Armenia
7th Oct 20133:00 pmRNSAnalyst Presentation
4th Oct 20137:00 amRNSFund raising to accelerate drilling at Mutsk
24th Sep 20137:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.