PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSosandar Regulatory News (SOS)

Share Price Information for Sosandar (SOS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.00
Bid: 11.50
Ask: 12.50
Change: 0.00 (0.00%)
Spread: 1.00 (8.696%)
Open: 12.00
High: 12.00
Low: 12.00
Prev. Close: 12.00
SOS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further drilling confirms continuity of gold zone

14 Oct 2014 07:00

RNS Number : 1720U
Orogen Gold PLC
14 October 2014
 



Orogen Gold plc

("Orogen" or the "Company") 

 

Mutsk gold project Armenia

Further drilling confirms continuity of gold zone

Orogen Gold plc (AIM: ORE), the AIM quoted gold exploration company, provides the following update on the Company's diamond drilling programme at the Mutsk gold project in southern Armenia.

 

Highlights:

 

· Latest hole within main zone confirms continuity of gold zone down-dip to the west

· OG14-30 cuts 28.9m interval assaying 0.70g/t Au, including 4.8m assaying 1.52g/t Au

· Two holes at the northern end of 1.6km target zone cut wide sections of hydrothermal alteration and pyrite mineralisation and narrow base metal veining

· Drilling along the Mutsk gold zone is ongoing and further results will be reported over the coming weeks

 

Ed Slowey, Chief Executive of Orogen, commented: "The latest holes provide additional detail on the extent of the mineralising system and gold-bearing intervals at Mutsk. Drilling will continue as long as the weather window remains open and further results will be reported over the coming weeks." 

Four additional diamond drill holes were completed at the Mutsk property for which core assays were received. All holes were angled at 55 degrees towards the east. Hole OG14-30 was sited 30m to the west of hole OG14-27 on Section 3710N, where a wide gold-mineralised interval was reported previously in hydrothermally altered and brecciated volcanic rocks. The new hole cut a mineralised zone grading 0.70g/t Au over a width of 28.9m between 60.3-89.2m down-hole depth. Within this zone, a shorter interval of 4.8m graded 1.52g/t Au from 77.2-82.0m depth. This hole confirms that the target zone extends to the west on this section similar to the sections already drill tested 90m to the south and 240m to the north.

Two holes drilled at the northern end of the 1.6km Mutsk structural zone, OG14-26a and OG14-31, intersected extensive alteration and pyrite mineralisation, as well as some narrow base metal veins, however these particular holes were found not to be gold-bearing.

The fourth hole, OG14-29, was sited on Section 4200N at the northern end of the main mineralised zone discovered by previous vertical drilling along the main structure. This hole cored a zone of intermittent alteration and pyrite mineralisation containing some low-order gold values at shallow depths, confirming that the main target zone extends over at least 600m of strike. It is becoming clearer that as the strong alteration and accompanying gold mineralisation can vary over quite short distances, further drill testing of this area is required.

Drilling along the Mutsk gold zone is ongoing and further results will be reported over the coming weeks. Work is planned to continue at site as long as weather and ground conditions permit, before the onset of winter.

For maps of the Mutsk property please refer to the Mutsk project page on the Orogen website at www.orogengold.com.

Sample Assaying

Gold assaying is undertaken at an analytical laboratory located in Kapan in the south of Armenia. The laboratory is operated by the international SGS Laboratory Services company. Orogen inserts certified standards, blanks and duplicate samples into its sample batches to check the accuracy of the assay results and has also carried out confirmatory checking of duplicate samples at another international laboratory.

About the Mutsk Project

The Mutsk Project is located in southern Armenia at about 2,000m elevation and is three and a half hours' drive from the capital Yerevan. The site is accessible most of the year other than during the core winter months. Maps showing the location and details of the project are available on the Company's website.

Limited historic exploration had been carried out until drilling by Georaid CJSC in 2011, which intersected low sulphidation epithermal-type pyrite-gold mineralisation in altered and brecciated tuffs, similar in age and gold grade to those that host the Lydian International high sulphidation Amulsar gold deposit (4.1 million ounces in Measured, Indicated and Inferred Resources at an average grade of 1g/t Au) located 30km to the northwest, also in Armenia.

Orogen has an exclusive agreement with Georaid CJSC to earn an 80% interest in the property by spending a total of US$2.5m by the end of August 2016.

 

-ENDS-

 

Approval

Ed Slowey, CEO of Orogen, is a Competent Person as defined by various international instruments and takes responsibility for the release of this information.

 

Enquiries:

 

Orogen Gold Plc

+353 1662 8395

Ed Slowey, CEO

Alan Mooney, FD

WH Ireland Limited (Nominated Adviser and Joint Broker)

+44 (0) 20 7220 1666

Tim Feather

James Bavister

Hume Capital Securities Plc (Joint Broker)

+44 (0) 20 3693 1470

Jon Belliss

Walbrook (Public Relations and Investor Relations)

+44 (0) 20 933 8780

Paul Cornelius / Guy McDougall

 

About Orogen Gold

Orogen Gold plc is a UK public company quoted on the London Stock Exchange AIM market (ticker: ORE). The Company is focused on mineral exploration and development in Europe and is currently operating two gold exploration projects: a) at Mutsk in Armenia and b) at Deli Jovan in Serbia. The Mutsk gold project in Armenia was optioned by Orogen early in 2013 to follow-up reports of a new epithermal discovery within an established gold district. At Deli Jovan the historic high-grade gold mining camp was last in production prior to World War II and has been significantly under-explored in modern times. The Mutsk project has been prioritised by the Company due to the clear potential evident on the property.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFSEIILVLIS
Date   Source Headline
23rd Dec 20107:00 amRNSHalf Yearly Report
9th Dec 20107:00 amRNSTrading Statement
3rd Dec 20107:00 amRNSIssue of Equity
16th Nov 20105:44 pmRNSResolutions passed at AGM
28th Oct 20107:00 amRNSAppointment of Joint Broker
25th Oct 20107:00 amRNSUpdate on issue of Exploration Licence
25th Oct 20107:00 amRNSUpdate on issue of Exploration Licence
15th Oct 201012:08 pmRNSHolding(s) in Company
29th Sep 20107:00 amRNSFinal Results
7th Sep 20102:02 pmRNSDirector/PDMR Shareholding
6th Sep 20108:42 amRNSHolding(s) in Company
1st Sep 201010:12 amRNSResult of GM
9th Aug 20107:00 amRNSIssue of Equity and Investment Agreement
18th Dec 20099:21 amRNSHalf Yearly Report
29th Oct 200911:59 amRNSResult of AGM and Trading Update
30th Sep 20097:00 amRNSFinal Results
4th Aug 200911:11 amRNSHolding(s) in Company
13th Jul 20091:44 pmRNSHolding(s) in Company
13th Jul 20091:42 pmRNSDirector/PDMR Shareholding
13th Jul 20091:40 pmRNSTotal Voting Rights
8th Jul 20097:01 amPRNPlacing and Directorate Change
8th Jul 20097:00 amPRNChange of Adviser
24th Jun 200910:46 amPRNSubsidiary Placed into Bankruptcy Proceedings
19th Jun 200911:35 amRNSResult of General Meeting
26th May 200911:24 amPRNReorganisation of Share Capital
25th Mar 20094:00 pmPRNDirectorate Change
23rd Dec 20084:00 pmPRNHalf-yearly Report
30th Oct 20083:21 pmPRNResult of AGM
1st Oct 20087:00 amPRNRestatement of Preliminary Statement of Results
29th Sep 20087:00 amPRNPreliminary Results
28th Jul 20081:04 pmPRNStatement re Share Price Movement
24th Jul 20087:00 amPRNBoard Appointment
31st Jan 20087:00 amRNSTotal Voting Rights
16th Jan 20085:07 pmRNSDisclosure
24th Dec 200711:49 amRNSPlacing New Ordinary Shares
20th Dec 20077:00 amPRNInterim Results
12th Nov 200711:57 amPRNResult of AGM
25th Sep 200712:50 pmPRNFinal Results
17th Aug 20074:53 pmPRNRule 26
1st Aug 20077:00 amPRNAcquisition
19th Mar 20077:00 amPRNInvestment
30th Jan 20077:00 amPRNInvestment
29th Jan 20078:52 amRNSHolding(s) in Company
5th Jan 20072:18 pmRNSTotal Voting Rights
18th Dec 20067:05 amPRNInterim Results
18th Dec 20067:00 amPRNPlacing and Appointment of CEO
15th Dec 200611:57 amRNSTotal Voting Rights
29th Sep 20061:03 pmRNSResults
23rd Mar 20067:01 amRNSAcquisition
26th Jan 20067:00 amRNSRestoration: HHK plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.