Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSylvania Platinum Regulatory News (SLP)

Share Price Information for Sylvania Platinum (SLP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 70.00
Bid: 69.00
Ask: 71.00
Change: 5.00 (7.75%)
Spread: 2.00 (2.899%)
Open: 65.00
High: 70.00
Low: 64.50
Prev. Close: 64.50
SLP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Second Quarter Report to 31 December 2021

31 Jan 2022 07:01

RNS Number : 1129A
Sylvania Platinum Limited
31 January 2022
 

 

 

 

 

_____________________________________________________________________________________________________________________________

 

31 January 2022

 

 

Sylvania Platinum Limited

 ("Sylvania", the "Company" or the "Group")

 

 

Second Quarter Report to 31 December 2021

 

 

Sylvania (AIM: SLP) is pleased to announce the results for the quarter ended 31 December 2021 ("Q2" or the "quarter"). Unless otherwise stated, the consolidated financial information contained in this report is presented in United States Dollars ("USD" or "$").

 

Achievements

· Sylvania Dump Operations ("SDO") achieved 16,605 4E PGM ounces in Q2 (Q1: 15,771 ounces);

· SDO recorded $37.9 million net revenue for the quarter (Q1: $29.8 million);

· SDO cash costs per 4E PGM ounce decreased to $772/ounce (Q1: $862/ounce);

· Group EBITDA of $22.3 million (Q1: $13.6 million);

· Net profit of $15.5 million (Q1: $8.6 million); and

· Group cash balance of $110.1 million (Q1: $132.7 million)

 

Challenges

The Western operations have faced continuing challenges due to water shortages at the plant;Water shortages at Lesedi were exacerbated by the temporary tailings deposition strategy; PGM feed grades in ROM material remain low at Mooinooi operation, but the Company continues to explore alternative feed sources, in conjunction with the host mine, and to implement processes to optimise ROM feed grades and increase recovery efficiency at the operation; andA modest adjustment in PGM production estimate, with 66,000 to 68,000 ounces now targeted by the Company for the full year.

 

Opportunities

The secondary milling and flotation ("MF2") projects at Lesedi and Tweefontein are on track to start contributing towards production during H2 FY2022 and H1 FY2023 respectively; andThe Group maintains strong cash reserves to allow funding of capital expansion and process optimisation projects, upgrading the Group's exploration and evaluation assets and returning value to all stakeholders.

 

 

Commenting on the Q2 results, Sylvania's CEO, Jaco Prinsloo said:

 

"I am pleased to report that the operations achieved a solid 16,605 ounces for the quarter notwithstanding the impacts associated with the temporary suspension of operations at Lesedi during Q1 and continued low grade ROM resources at our Western operations. The majority of our operations performed well and as a result we managed to achieve 5% higher PGM recovery efficiency for the period, which is commendable. Cost controls remain a focus for the SDO and Group as a whole.

 

"Net revenue increased 27% to $37.9 million and net profit increased 80% to $15.5 million, with the PGM basket price realised from our smelters of $2,892/ounce remaining at similar levels as Q1. Our capital projects remain fully funded from current cash reserves and we are making significant progress in terms of access to additional chrome tailings resources at both the Eastern and Western Operations.

 

"The impact of the temporary suspension of the Lesedi operation, together with the subsequent water shortages at our Western operations and the lower than planned PGM feed grade of Mooinooi ROM material is such that we are now targeting an estimated PGM production of 66,000 to 68,000 ounces for FY2022."

 

 

USD

Unit

Unaudited

Unit

ZAR

Q1 FY2022

Q2 FY2022

% Change

% Change

Q2 FY2022

Q1 FY2022

 

 

 

 

Production

 

 

 

 

600,376

584,620

-3%

T

Plant Feed

T

-3%

584,620

600,376

1.90

1.94

2%

g/t

Feed Head Grade

g/t

2%

1.94

1.90

294,229

295,011

0%

T

PGM Plant Feed Tons

T

0%

295,011

294,229

3.17

3.17

0%

g/t

PGM Plant Feed Grade

g/t

0%

3.17

3.17

52.66%

55.20%

5%

%

PGM Plant Recovery

%

5%

55.20%

52.66%

15,771

16,605

5%

Oz

Total 4E PGMs

Oz

5%

16,605

15,771

20,397

21,431

5%

Oz

Total 6E PGMs

Oz

5%

21,431

20,397

 

 

 

 

 

 

 

 

 

2,897

2,892

0%

$/oz

Gross basket price1

R/oz

5%

44,656

42,417

 

 

 

 

 

 

 

 

 

 

 

 

 

Financials2

 

 

 

 

29,321

32,199

10%

$'000

Revenue (4E)

R'000

16%

497,126

429,267

2,968

2,759

-7%

$'000

Revenue (by-products including base metals)

R'000

-2%

42,596

43,451

-2,448

2,984

222%

$'000

Sales adjustments

R'000

229%

46,073

-35,842

29,841

37,942

27%

$'000

Net revenue

R'000

34%

585,795

436,876

 

 

 

 

 

 

 

 

 

14,288

13,364

-6%

$'000

Direct operating costs

R'000

-1%

206,331

209,175

615

735

20%

$'000

General and administrative costs

R'000

26%

11,348

9,004

13,577

22,331

64%

$'000

Group EBITDA

R'000

73%

344,769

198,774

360

12

-97%

$'000

Net Interest

R'000

-97%

184

5,265

8,607

15,518

80%

$'000

Net profit

R'000

90%

239,581

126,002

 

 

 

 

 

 

 

 

 

3,103

4,274

38%

$'000

Capital Expenditure

R'000

45%

65,993

45,428

 

 

 

 

 

 

 

 

 

132,715

110,062

-17%

$'000

Cash Balance

R'000

-12%

1,755,066

1,988,597

 

 

 

 

 

 

 

 

 

 

 

 

R/$

Ave R/$ rate

R/$

5%

15.44

14.64

 

 

 

R/$ 

Spot R/$ rate 

R/$ 

6%

15.95

14.98

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit Cost/Efficiencies

 

 

 

 

862

772

-10%

$/oz

SDO Cash Cost Per 4E PGM oz3

R/oz

-6%

11,915

12,615

666

598

-10%

$/oz

SDO Cash Cost Per 6E PGM oz3

R/oz

-5%

9,231

9,754

934

832

-11%

$/oz

Group Cash Cost Per 4E PGM oz3

R/oz

-6%

12,844

13,674

722

645

-11%

$/oz

Group Cash Cost Per 6E PGM oz3

R/oz

-6%

9,951

10,573

1,085

968

-11%

$/oz

All-in sustaining cost (4E)

R/oz

-6%

14,942

15,880

1,239

1,192

-4%

$/oz

All-in cost (4E)

R/oz

1%

18,397

18,135

The Sylvania cash generating subsidiaries are incorporated in South Africa with the functional currency of these operations being ZAR. Revenues from the sale of PGMs are incurred in USD and then converted into ZAR. The Group's reporting currency is USD as the parent company is incorporated in Bermuda. Corporate and general and administration costs are incurred in USD, GBP and ZAR.

1 The gross basket price in the table is the December 2021 gross basket used for revenue recognition of ounces delivered in Q2 FY2022, before penalties/smelting costs and applying the contractual payability.

2 Revenue (6E) for Q2, before adjustments is $35.0 million (6E prill split is Pt 50%, Pd 18%, Rh 9%, Au 0.3%, Ru 18%, Ir 5%).

3 The cash costs include direct operating costs and exclude royalty tax.

 

 

A. OPERATIONAL OVERVIEW

 

Health, safety and environment

The Company is pleased to report that no significant occupational health or environmental incidents occurred during the quarter and the Doornbosch operation remains nine-years Lost-time Injury ("LTI") free, while Lesedi achieved two-years LTI-free during November. The Mooinooi and Lannex operations remain one-year LTI-free. 

 

Operational performance

The SDO delivered a solid quarterly performance of 16,605 4E PGM ounces for the quarter, which equates to a 5% increase quarter-on-quarter.

 

While the plant feed head grades increased marginally compared with the previous quarter, the PGM plant feed grade and PGM plant feed tons remained consistent quarter-on-quarter. A 5% increase in PGM recovery efficiency, as flotation stability improved during the period, contributed towards the 5% higher PGM ounce production for the period.

 

Direct operating cash costs per 4E PGM ounce decreased in rand and dollar terms quarter-on-quarter by 6% and 10% respectively to ZAR11,915/ounce and $772/ounce (Q1: ZAR12,615/ounce and $862/ounce) and the average ZAR:USD exchange rate depreciated by 5% during the quarter.

 

The Group incurred capital expenditure of ZAR66.0 million ($4.3 million), which is aligned with planned capital project schedules and includes the new Lesedi tailings facility, the Doornbosch tailings facility and the roll out of the Lesedi MF2 circuit.  

 

Operational focus areas

In order to safeguard the facility, reduce the water level and load, and resume partial production at the operation, Lesedi commenced with hydro-mining of the affected tailings dam facility during the period. However, due to the nature of the temporary emergency tailings deposition facility and the difficulty in recovering return-water from it, combined with general water shortages in the area, the operation has not been able to ramp up to normal production levels as yet. Consequently, Lesedi produced approximately 1,500 ounces lower than anticipated for the period. The commissioning of a new water supply during this January, from additionally installed boreholes, will mitigate water shortages, whilst the operation will remain under pressure until the commissioning of the new tailings deposition facility, expected during the latter part of Q3 FY2022.

 

Low PGM grades in ROM material from the host mine at the Mooinooi operation remained a challenge during the period and various sampling campaigns and investigations have been performed during the past quarter, in conjunction with the host mine, to evaluate potential alternative feed sources in an attempt to mitigate the effect on operations. It is anticipated that ROM feed grades should improve during H2 FY2022.

 

Operational opportunities

Despite the significant impact of recent global chip shortages on the availability and delivery of some process control units and plant equipment, the Lesedi MF2 at the Western operations is still expected to commission towards the end of March 2022. In addition, the execution of the Tweefontein MF2 project at the Eastern operations is progressing well and expected to commission later this calendar year.

 

Impact of COVID-19 and South African Government imposed lockdown regulations

South Africa entered the fourth wave of COVID-19 infections in December 2021 and the Company reported 23 active cases during the period. Post period end, the Company has reported one active case and overall COVID-19 cases totalled 138 since the start of the pandemic.

 

Sylvania believes that vaccines are key in the fight against the pandemic, together with other control protocols. Although we acknowledge that vaccines are a personal choice, we do encourage our employees to be vaccinated against COVID-19 with the intent to limit the impact and spread of the virus. Management continues to monitor the situation and to implement measures for both the corporate office and operations to limit interaction and exposure where possible.

 

The COVID-19 pandemic and its effects have exerted a toll on people's general mental wellbeing and the Company recognises the need for health and mental wellbeing support for its employees. We understand that employees have their own individual needs and we are committed to make a difference and improve lives where possible to develop healthier and happier employees.

 

The Company has thus taken steps to implement an Employee Assistance Program ("EAP") for all its employees, immediate family members as well as those living in the same household. This program will allow not only a focus on treatment and prevention, but also enable continuous management and measurement to reduce risk and ultimately create more resilient employees. We believe that this program will enhance the corporate culture of caring and wellness amongst our staff.

 

B. FINANCIAL OVERVIEW

Financial performance

Revenue (4E) for the quarter increased 10% to $32.2 million (Q1: $29.3 million) as a result of the 5% increase in ounce production and the 5% depreciation in the ZAR/USD exchange rate. Net revenue for the quarter, which includes base metals and by-products, and the quarter-on-quarter sales adjustment increased 27%. The average gross basket price for Q2 is $2,892/ounce against $2,897/ounce in Q1, but significantly lower than the $4,576/ounce and $4,059/ounce prices for Q3 and Q4 of FY2021 respectively, consequently resulting in a lower than originally planned basket price for the calendar year.

 

Group cash costs per 4E PGM ounce decreased by 6% in ZAR from ZAR13,674/ounce to ZAR12,844/ounce and decreased 11% in dollar terms from $934/ounce in the previous quarter to $832/ounce during Q2. Group EBITDA increased from $13.6 million to $22.3 million and net profit increased from $8.6 million to $15.5 million as a result of the increase in ounces produced.

 

General and administrative costs increased quarter-on-quarter from $0.62 million to $0.74 million. These costs are incurred in USD, GBP and ZAR and are impacted by the exchange rate fluctuations over the reporting period.

 

The Group cash balance decreased 17% from $132.7 million to $110.1 million during the quarter. Contributing factors to the decrease in cash quarter-on-quarter include the impact of the lower Q1 ounces paid by the smelter in Q2. The Company paid the annual dividend ($14.6 million), provisional income and royalty taxes of ZAR163.3 million ($10.2 million) and ZAR42.6 million ($2.7 million) respectively, during the quarter.

 

Cash generated from operations before working capital movements was $22.3 million with net changes in working capital amounting to $11.3 million, which is mainly due to the change in trade debtors. The higher ounces produced during Q2 compared to Q1 contributed to the increase in trade debtors. Trade debtors arise from the concentrate delivered in the quarter but paid for in the following quarter as per the concentrate off take agreements.

 

The Group spent $4.3 million on capital for the quarter which included the new Lesedi and Doornbosch tailings disposal facilities and the Lesedi MF2 projects.

C. MINERAL ASSET DEVELOPMENT AND OPENCAST MINING PROJECTS

 

Volspruit Platinum Opportunity

The fieldwork for the specialist studies in aid of updating the Environmental Impact Assessment and Water Use License applications have been completed and the final submission is due imminently. The inclusion of these studies and the already completed detailed design form part of the overall process to conclude the outstanding mandated authorisations required on the projects.

 

The additional metallurgical test work commissioned, following the test work completed in FY2021, is ongoing and includes tests aimed at increasing the payability of the PGM concentrate expected to be produced by the project. The sample preparation for this test work was completed in Q2 FY2022 and the samples will be shipped to an offshore specialist testing facility. The Company expects the report of the current test work in Q4 FY2022.

 

Northern Limb Projects

The drilling has been completed on the northern limb projects without incident and within the budgeted drilling metres. The geological logging and sampling of the drilled core continues, with reporting on the project expected in July 2022. Results of the exploratory drilling will be released to the market when they become available.

 

Grasvally

An amended Sale Agreement was signed on 3 November 2021 whereby Sylvania sold its 74% share in Grasvally Chrome Mine (Pty) Ltd to a 100% empowerment company. Sales proceeds of ZAR100.0 million, payable in fifteen equal quarterly instalments, will become payable after completion of certain conditions precedent being fulfilled, including an application for ministerial consent for the sale in terms of section 11 of the Mineral and Petroleum Resources Development Act. This has been submitted to the Department of Mineral Resources and Energy and the Company awaits the outcome.

 

 D. CORPORATE ACTIVITIES

 

Directorate changes

During the period, the Company announced the appointment of Simon Scott as Independent Non-executive Director, with effect from 1 January 2022, while Roger Williams, who has served on the Board of the Company since 2011, stepped down from his role as a Non-executive Director on Simon Scott's appointment.

 

As a result of the Directorate changes, and as part of a Board succession plan, the following changes in committee roles were effected: Eileen Carr is now Chair of the Audit Committee, Adrian Reynolds is now Chair of the Remuneration Committee and Simon Scott has become a member of the Audit Committee. Eileen Carr's role as Assistant Company Secretary is now being carried out by a member of the Company's in-house legal staff.

 

Payment of Annual Dividend

On 3 December 2021, the Board paid a final dividend totalling $14.6 million, equating to 4p per ordinary share, to shareholders on the register on the record date of 29 October 2021.

 

 

CONTACT DETAILS

 

For further information, please contact:

 

Jaco Prinsloo CEO

Lewanne Carminati CFO

+27 11 673 1171

 

 

Nominated Adviser and Broker

 

Liberum Capital Limited

+44 (0) 20 3100 2000

Richard Crawley / Scott Mathieson / Ed Phillips

 

 

 

Communications

 

Alma PR Limited

+44 (0) 20 3405 0205

Justine James / Josh Royston / Faye Calow

sylvania@almapr.co.uk

 

 

CORPORATE INFORMATION

 

Registered and postal address:

Sylvania Platinum Limited

 

Clarendon House

 

2 Church Street

 

Hamilton HM 11

 

Bermuda

 

 

 

 

SA Operations postal address:

PO Box 976

 

Florida Hills, 1716

 

South Africa

 

 

 

Sylvania Website: www.sylvaniaplatinum.com

 

 

About Sylvania Platinum Limited

 

 

Sylvania Platinum is a lower-cost producer of platinum group metals (PGM) (platinum, palladium and rhodium) with operations located in South Africa. The Sylvania Dump Operations (SDO) comprises six chrome beneficiation and PGM processing plants focusing on the retreatment of PGM-rich chrome tailings materials from mines in the Bushveld Igneous Complex. The SDO is the largest PGM producer from chrome tailings re-treatment in the industry. The Group also holds mining rights for PGM projects and a chrome prospect in the Northern Limb of the Bushveld Complex.

 

 

For more information visit https://www.sylvaniaplatinum.com/ 

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse regulation (EU) no.596/2014 as amended by the Market Abuse (Amendment) (EU Exit) Regulations 2019.

 

 

For the purposes of MAR and Article 2 of Commission Implementing Regulation (EU) 2016/1055, this announcement is being made on behalf of the Company by Jaco Prinsloo.

 

 

ANNEXURE

 

GLOSSARY OF TERMS FY2022

The following definitions apply throughout the period:

4E PGMs

4E PGM ounces include the precious metal elements Platinum, Palladium, Rhodium and Gold

6E PGMs

6E ounces include the 4E elements plus additional Iridium and Ruthenium

AGM

Annual General Meeting

AIM

Alternative Investment Market of the London Stock Exchange

All-in sustaining cost

Production costs plus all costs relating to sustaining current production and sustaining capital expenditure.

All-in cost

All-in sustaining cost plus non-sustaining and expansion capital expenditure

Current risings

Fresh chrome tails from current operating host mines processing operations

DMRE

Department of Mineral Resources and Energy

EBITDA

Earnings before interest, tax, depreciation and amortisation

EA

Environmental Authorisation

EAP

Employee Assistance Program

EIA

Environmental Impact Assessment

EIR

Effective interest rate

EMPR

Environmental Management Programme Report

GBP

Pounds Sterling

IASB

International Accounting Standards Board

IFRIC

International Financial Reporting Interpretation Committee

IFRS

International Financial Reporting Standards

Lesedi

Phoenix Platinum Mining Proprietary Limited, renamed Sylvania Lesedi

LSE

London Stock Exchange

LTI

Lost-time injury

MF2

Milling and flotation technology

MPRDA

Mineral and Petroleum Resources Development Act

MRA

Mining Right Application

NWA

National Water Act 36 of 1998

PGM

Platinum group metals comprising mainly platinum, palladium, rhodium and gold

PAR

Pan African Resources Plc

Pipeline ounces

6E ounces delivered but not invoiced

Pipeline revenue

Revenue recognised for ounces delivered, but not yet invoiced based on contractual timelines

Pipeline sales adjustment

Adjustments to pipeline revenues based on the basket price for the period between delivery and invoicing

Project Echo

Secondary PGM Milling and Flotation (MF2) program announced in FY2017 to design and install additional new fine grinding mills and flotation circuits at Millsell, Doornbosch, Tweefontein, Mooinooi and Lesedi.

Revenue (by products)

Revenue earned on Ruthenium, Iridium, Nickel and Copper

ROM

Run of mine

SDO

Sylvania dump operations

Sylvania

Sylvania Platinum Limited, a company incorporated in Bermuda

USD

United States Dollar

WULA

Water Use Licence Application

UK

United Kingdom of Great Britain and Northern Ireland

ZAR

South African Rand

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
IR WPUWAGUPPUQG
Date   Source Headline
8th Apr 20247:00 amRNSShare Buyback Update
2nd Apr 20247:00 amRNSShare Buyback Update
28th Mar 20247:00 amRNSShare Buyback Update
27th Mar 20247:00 amRNSShare Buyback
26th Mar 20247:00 amRNSShare Buyback
25th Mar 20247:00 amRNSShare Buyback
22nd Mar 20247:00 amRNSShare Buyback
21st Mar 20247:00 amRNSShare Buyback
20th Mar 20249:56 amRNSShare Buyback
19th Mar 20247:00 amRNSShare Buyback Update
18th Mar 20247:00 amRNSShare Buyback Update
15th Mar 20247:00 amRNSShare Buyback Update
14th Mar 20247:00 amRNSShare Buyback Update
11th Mar 20247:00 amRNSShare Buyback Update
8th Mar 20247:00 amRNSShare Buyback Update
7th Mar 20247:00 amRNSShare Buyback Update
6th Mar 20247:00 amRNSShare Buyback Update
5th Mar 20247:00 amRNSShare Buyback Update
4th Mar 20247:00 amRNSShare Buyback
23rd Feb 202412:39 pmRNSDirector/PDMR Shareholding
22nd Feb 20247:00 amRNSUpdated Corporate Presentation Announcement
22nd Feb 20247:00 amRNSInterim Financial Results Announcement
19th Feb 20247:01 amRNSResults of Updated Mineral Resource Estimates
16th Feb 20247:00 amRNSResults of Updated Mineral Resource Estimates
31st Jan 20247:00 amRNSSecond Quarter Report to 31 December 2023
2nd Jan 20247:00 amRNSTotal Voting Rights
27th Nov 20237:00 amRNSResult of AGM
17th Nov 20237:00 amRNSExercise of vested bonus shares
13th Nov 20237:00 amRNSNotice of Transaction by PDMR
9th Nov 20237:00 amRNSAppointment of New Chair
1st Nov 20234:09 pmRNSESG: Supporting Our Strategy Announcement
27th Oct 20237:00 amRNSNotice of AGM
25th Oct 20237:00 amRNSFirst Quarter Report to 30 September 2023
12th Sep 20237:00 amRNSNotice of Transaction by PDMR
7th Sep 20237:07 amRNSPublication of Corporate Investor Presentation
7th Sep 20237:04 amRNSAnnual Financial Report
27th Jul 20234:11 pmRNSFourth Quarter Report to 30 June 2023
27th Jul 20237:00 amRNSFourth Quarter Report to 30 June 2023
14th Jul 202312:35 pmRNSCancellation of Ordinary Shares
3rd Jul 20237:00 amRNSShare Buyback Update
30th Jun 20237:00 amRNSShare Buyback Update
29th Jun 20237:00 amRNSShare Buyback Update
28th Jun 20237:00 amRNSShare Buyback Update
27th Jun 20237:00 amRNSShare Buyback Update
26th Jun 20237:00 amRNSShare Buyback Update
23rd Jun 20237:00 amRNSShare Buyback Update
22nd Jun 20237:00 amRNSShare Buyback Update
21st Jun 20237:00 amRNSShare Buyback Update
20th Jun 20237:00 amRNSShare Buyback Update
15th Jun 202312:22 pmRNSShare Buyback Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.